|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2008-04-10-LBAC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2000-2009
>
2008
>
2008-04-10-LBAC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2009 12:21:56 PM
Creation date
3/4/2009 12:21:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />figure out a way to coordinate plowing streets and the Bikeway so that street piles don’t <br />block the previously plowed path. <br /> <br />Bikeway Paving: Stew reported on a conversation with Engineering about alternatives <br />to the repaving plan. It may make better use of the money available and be better for the <br />Bikeway if rather than repaving the entire surface, only the places needing it are done, <br />and the remaining money is spent of repairing or correcting problems that are causing <br />erosion and other deterioration of the pavement. A special BAC meeting may need to be <br />called to allow us to advise DPW/Engineering before they initiate a contract for the <br />work. <br /> <br />Hartwell Ave status: Terry Gleason’s monthly report was read, indicating nothing new <br />for the past several months, except that the bike lane stripes were repainted last week. <br />Carl commented that his commute from Bedford via Maguire and Westview continues to <br />be slower than before the change was made. Conversations between the town and the <br />AFB are being held to see if something can be done to alleviate the afternoon traffic jam <br />leaving the base. The abandoned spur line that runs behind the buildings west of Hartwell <br />was discussed as a possible route. <br /> <br />Tri Town meeting: Marita reported that the bumper sticker idea for identifying towns <br />along the bikeway was well received at the last tri-towns meeting. Potential designs for <br />the bumper sticker were discussed. <br /> <br />West Lexington Greenway status: Mike reported on status of the WLG master planning <br />project. Basically, the contractor, VHB, is busy producing the draft master plan in <br />preparation for presenting it to the public on May 13. <br /> <br />Town Meeting Article 59: Stew reported that the proponents of the article have changed <br />the details we took issue with and it now matches what we had hoped for: at least two <br />bike parking spaces and no maximum number of bike spaces. <br /> <br />Trail Count plans: Stew described plans for repeating last fall’s count of users of the <br />Bikeway on May 3 (Saturday) and May 6 (Tuesday). Volunteers should call or email <br />Stew. <br /> <br />Discovery Day: Marita asked if we want to have a presence at Discovery Day this year. <br />After discussion it was decided we would find a more suitable and concentrated audience <br />at the Farmers’ Market, so that will be considered as an alternative opportunity. <br /> <br />Meeting adjourned. <br /> <br /> <br />Record of Friends of Lexington Bikeways votes and discussions. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.