Laserfiche WebLink
<br /> <br /> <br /> <br />MEETING MINUTES <br /> <br /> <br />Committee Name: Lexington Bicycle Advisory Committee <br /> <br />Date, Time and Location of Meeting: <br />February 12, 2009, 7 pm, Room 111 of <br />the Town Office Building <br /> <br />Members Present: <br />Peggy Enders (Chair), Richard Canale (Planning Board <br />Liaison), Stew Kennedy, Mike Tabaczynski, Abe Shenker (FoLB Chair), John <br />Frey, Jerry Van Hook, Laurel Carpenter, George Gagliardi <br /> <br />Others Present: <br /> Susan Yanofsky, Dave Cannon, Rich Spencer, Bob Hausslein, <br />Bob Dangel <br /> <br />Members Absent: <br /> Marita Hartshorn, Sandra Shaw (Recreation Liaison), Hank <br />Manz (Selectmen’s Liaison) <br /> <br />Minutes: <br /> Reviewed and approved December 28 and January 9 meeting minutes. <br /> <br />Snow Plowing: <br />Peggy said that she, Stew, and Abe had met with John <br />DeNapoli, a contractor from Arlington, who is prepared to take on Bikeway <br />plowing once the town approves his insurance credentials. He will charge $70 <br />per hour and will use a small snow-cat with an 8-foot blade. The gates will need <br />to be opened, and Peggy and Stew plan to talk with Carl Valente and Bill Hadley <br />later in the week to ask for approval to open the gates. At the present time, she <br />said, there is too much ice on the Bikeway to resume plowing. The committee <br />was in agreement that they would rather wait on clearing the Bikeway until <br />conditions improved. <br /> <br />Spring Street: <br /> Jerry said that the Sidewalk Committee had made <br />recommendations to the Traffic Mitigation Group regarding aspects of the Spring <br />Street project: <br /> <br />1. The maximum pedestrian signal delay at the Marrett Rd/Spring Street <br />intersection should never be longer than 30 seconds following the Mass <br />Highway Manual stipulation for Level of Service; <br /> <br />2. Sidewalk alignment "Option 3" (west-side sidewalk to Hudson and then <br />on the east-side from there) as approved by committee with the possible <br />alternative of "Option 1" (sidewalk only on the west side) also being an <br />attractive option; <br /> <br />