|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2008-06-11-PB-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
2000-2009
>
2008
>
2008-06-11-PB-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 3:32:26 PM
Creation date
1/6/2009 12:20:36 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PB - Planning Board
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minutes for the Meeting of June 11, 2008 Page 7 <br /> <br /> <br />Ms. Yanofsky said there was a meeting at the end of May to discuss transportation issues on Hartwell <br />Avenue such as a possible shuttle, lack of sidewalks and participating in a survey. Hanscom Base and <br />Lincoln Labs were there. Transaction Associates attended and would be conducting a survey. They will <br />share the results with the town and the 128 Business Council. <br /> <br />Mr. Zurlo said the 2020 Executive Committee was interested in having the EDTF and Cecil Group <br />present their findings. He felt that in the fall the EDTF could make a presentation on their report and the <br />Planning Board could roll out their specific goals. <br /> <br />***************************SUBDIVISION ADMINISTRATION*************************** <br />63 Paul Revere Road, Preliminary Reduced Frontage Subdivision: This was a continued public <br />information meeting. Mr. Fred Russell, Engineer, and Steve Genova, the applicant, were present at the <br />meeting. The Board looked at the site construction plan and the change in grading. <br />The changes shown were as follows: <br />?? <br />Height for the new building would be 31.5 feet on lot 1; <br />?? <br />Addition to the limit of work line; <br />?? <br />Shows the various easements across lot 1 for lot 2; <br />?? <br />Relocate propane tanks; and <br />?? <br />Existing lines underground. <br />Mr. Genova brought in photographs showing views from the existing neighbors and said he would be the <br />one to see the most. <br /> <br />Mr. Canale asked as you walk up the driveway, what presently exists, and why were you cutting down <br />trees? Mr. Russell said there are no trees coming down. Mr. Canale asked what grade changes were being <br />made to the drive? Mr. Russell said there were none. The width was going from 12-14 feet to 18 feet. <br /> <br />Mr. Galaitsis asked about the test pits. Mr. Russell said there was no ledge down to 84”. Mr. Canale asked <br />in terms of the grading, did they anticipate more cut than fill, and how many truckloads? Mr. Russell said <br />there would be more removed than filled by approximately one truckload. Mr. Galaitsis asked for a plan <br />with more clearly delineated driveway and plants. Ms. McCall-Taylor suggested the plan show the <br />existing drive as dotted and the proposed be shaded. <br /> <br />Mr. Zurlo had questions about the views. He asked about the stone walls and perspectives. Mr. Genova <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.