|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2008-02-13-PB-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
2000-2009
>
2008
>
2008-02-13-PB-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 2:46:50 PM
Creation date
1/6/2009 11:10:53 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PB - Planning Board
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minutes for the Meeting of February 13, 2008 Page 7 <br /> <br />what is the fairness to those who went for the CDs and provided mitigation in return for an increased <br />FAR. <br /> <br />Mr. Zurlo said that logic would apply to any rezoning. <br /> <br />Mr. Hornig said Town Meeting would decide the merits of changing this since it only affects one property <br />and light manufacturing may not be needed. <br /> <br />Article 56, Traffic Bylaw: Mr. Canale said it doesn’t address the issues. The capacity can’t be increased to <br />make the level of service work. <br /> <br />Mr. Galaitsis said these changes are more radical and to change the FAR from 10,000 square feet to <br />50,000 square feet without considering the impacts is a concern. <br /> <br />Mr. Zurlo said he could see allowing 10,000 square feet without a special permit, but 50,000 square feet is <br />so un-Lexington. You can’t just ask to change the level of service by increasing the capacity. There are <br />thresholds, and this would allow buildings up to 50,000 square feet without input such as site plan review. <br /> <br />Ms. Manz said it just wipes out mitigation and controls. <br /> <br />Mr. Hornig said the triggers for the SPS and traffic studies should be the same, and include the existing <br />space. Perhaps one could increase the number to 20,000 square feet, but 50,000 square feet is too high and <br />parking should be in proportion. The level of service limit is a problem and needs to be solved before <br />making any changes. <br /> <br />Mr. Canale asked what are we trying to do? We need to develop reasonably across the board. We need to <br />know what we want. The Town needs to do a traffic study, figure out what is required and assess the <br />properties. <br /> <br />Ms. Manz asked if the members wanted to suggest amendments to improve the articles or did they simply <br />want to say they unacceptable? <br /> <br />Mr. Hornig said the Board would support, amend or oppose. Members should think about what should be <br />salvaged over the next week. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.