Loading...
HomeMy WebLinkAbout2008-10-28-TMG-minTraffic Mitistation Group Meeting October 28, 2008 Present: Richard Canale, David Cannon, Elaine Dratch, Jeanne Krieger, Chris McVay, Arthur Smith, Jerry Van Hook, Gail Wagner, Susan Yanofsky Hartwell Avenue Striping ➢ Hartwell Ave accident data pre and post striping should be compiled to go before the Selectmen with the TMG recommendation. ➢ Police report striping slows traffic. ➢ Drivers' complaints to the Town have diminished. ➢ Improvements at Maguire Rd and bike path remain to be addressed. ➢ TMG voted to support permanent striping of Hartwell Ave. Waltham Street Crosswalk Options ➢ David after consulting Police staff voiced support for signed crosswalk, as an initial step. Design would include advanced warning signs. ➢ David envisions a Waltham Street corridor study that would include the area in question near the Waltham line. The study may revamp crosswalk, as it is viewed in larger context. ➢ Town funds beyond TMG may need to be appropriated for a crosswalk with activated lights ($40,000). ➢ Crosswalk with ramps and signage ($10,000) could be funded by Watertown Savings TDM funds. ➢ City of Waltham should be consulted regarding any proposed crosswalk plan. ➢ Installation would take place in spring, 2009. ➢ TMG voted to use Watertown Savings TDM funds for crosswalk with ramps and signage installation. Beal Traffic Mitigation ➢ TMG is unable to negotiate TDM terms in an open meeting. Jeanne Krieger, Charles Hornig, Maryann McCall Taylor and Susan Yanofsky represented the Town in developing a Traffic Mitigation agreement that is in draft form. ➢ Highlights: Lexpress annual payment for the duration of service; No Left AM Turns from Spring St (Beal added no Left PM turns); traffic mitigation payment to new Town Mitigation Bank; 5 year bond to be held by Town's Building Director, with return to Beal at end of period, if LEED silver certification obtained or SOV travel to site reduced by 10 %. ➢ Details of mitigation plan to be presented to Planning Board on 10/29/08. ➢ If added TMG input is required, TMG meeting scheduled for Friday, Nov 7, 1 pm. South Lexington Traffic Calming ➢ Purpose of traffic calming is to reduce speed not volume. ➢ Goal to make roads friendlier for all. ➢ South Lexington is scheduled for traffic lights at Spring St at Marrett Rd and Spring St at Hayden Ave. Sidewalks along Spring St are to be built to include crosswalks. ➢ Beal's Mitigation proposal includes restricted turns form Spring St and performance incentives to reduce traffic to Ledgemont Office complex. ➢ Goal of mitigation is to make local streets as safe and accessible as possible. ➢ Incremental traffic increases must be anticipated by impact of regional development. ➢ It was suggested that a Spring traffic study should include Shade St and Woodhaven. Planning Board, as a Selectmen Advisory committee, can raise added mitigation measures. Town Mitigation Plan ➢ Susan distributed 2007 traffic data for high accident streets (accidents, density). It included public transit routes and proximity to schools. Information was depicted on a map to portray traffic problem areas. It is proposed that this type of analysis guide the development of a Town Traffic Mitigation plan by priority, similar to the State TIP. Roosevelt Rd Sidewalks Sidewalk Committee is conducting a public meeting at Hastings School on 10/29/08. Avalon Met State Sidewalks Sidewalk design for Concord Avenue is underway. Minutes submitted by Gail Wagner, Transportation Services, Nov 4, 2008 Next Meeting, November 7, 2008, 1pm, Room 111