Meeting Date & Time: 13 January 2011, 7:OOPM
Location: 201 Bedford Street, 2 Flr. Conference Room
Attendees:
Jon Himmel, PBC
Eric Brown, PBC
Carl Oldenburg, PBC
Bruce Creager, PBC - Police & Fire
Jen Volgelzang, PBC - Schools
Guests:
William Middlemiss, Fire Chief
Mark Corr, Police Chief
Staff:
Pat Goddard, DPF
Mark W. Barrett, DPF
Laurie Lucibello, DPF
Index
1.0 General Business
2.0 Public Services Building
3.0 Cary Memorial Hall — Venue Improvement Study
4.0 Bridge & Bowman Elementary Schools Renovation
5.0 Police & Fire Studies
6.0 White House HSR— Final Report
1.0 GENERAL BUSINESS
1.1 Minutes
1119110
Motion to approve the Monthly meeting minutes for 12 October 2010.
Motion: Eric Brown 2 Dick Perry Voted: Unanimous
Motion to approve the Executive Session meeting minutes for 12 October 2010.
Motion: Eric Brown 2 Dick Perry Voted: Unanimous
1/13/11
Motion to approve the Monthly meeting minutes for 09 November 2010 and 14 December 2010.
Motion: Eric Brown 2 Carl Oldenburg Voted: Unanimous
1.2 Monthly Bills
1 -13 -11
DPF presented invoices totaling $1,150.00, which were approved for payment
201 BEDFORD STREET • LEXINGTON, MASSACHUSETTS 02420
PBC Meeting Minutes
13 January 2011 Meeting
1.3 Meeting Minute Format (Item Relocated from 2.24 to general business)
For the purposes of reducing ongoing printed text previous entries under this heading may have been removed from current meeting
minutes. Please refer to previous editions of the minutes for older insertions.
Mark Barrett is waiting for proposal from PSS.
7/13/10
Software has been purchased, is currently being installed on town server and DPF to coordinate with install on local computer and
training.
9/14/10
DPF advises that the company we purchased the software from has ceased their relationship with the software
manufacturer and a new vendor has contacted the town about providing support / training. PBC supports getting
training from the new support group as long as town is getting what it originally contracted for at the same costs.
Mark Barrett will follow up.
1.4 PBC Make -up and Proiects
7/13/10
There was brief discussion about the make -up of the committee, numbers of members etc, and the issues of working with the
growing volume of projects in Town. No conclusions made.
9/14/10
Additional discussion on the issue focused on clarifying areas or the specifics of where the PBC felt changes to the PBC
organization /structure could be beneficial.
a. Recommend to increase PBC member core /permanent number from 5 to 9 permanent members.
b. Have a permanent member joined by a client (temporary /project) member(s) to make a sub committee. PBC to
approve client members.
C. Client members should be required to come to monthly PBC meetings to report on progress.
d. Clearly define what projects constitute PBC involvement. Le, studies, programming, design, construction?
e. What is the process for becoming a PBC member is there an application?
f. What are the details of how Subcommittee process will work, what are their authorities, can they make approvals
and determinations or is Full PBC approval required at the monthly meeting.
g. Will project meetings that have sub committee members present require posting?
10/12/10
Discussion on this issue took place during executive session portion of meeting.
12/14/10
Proposed Language for a Town Meeting article relative to the PBC Committee format was discussed with a few edits proposed. First
Paragraph, "five to Nine" members and change "more than two" to "more than three"
1/13/10
Town Meeting article was sent to Carl Valente and to Town Counsel, no response to date.
1.8 Meeting Night Change
12/14/10
It was decided to change PBC Meeting nights from Tuesday's to Thursday's.
2.0 PUBLIC WORKS &FACILITIES BUILDING PROJECT
2.01 Contractor Monthly Reauisition
For the purposes of reducing ongoing printed text previous entries under this heading may have been removed from current meeting
minutes. Please refer to previous editions of the minutes for older insertions.
12/14/10
Motion to approve payment of Application for Payment #30 in the amount of $ 25,384.00
Motion: Dick Perry 2 Eric Brown Vote: Unanimous
Page 2 of 6
PBC Meeting Minutes
13 January 2011 Meeting
2.4. DPW Construction Schedule
For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current
meeting minutes. Please refer to previous editions of the minutes for older insertions.
9/14/10
Mike Lawrence reviewed punch list memo of 9113110 of remaining punch and warranty items. Nearing completion.
10/12/10
O &M Manuals and as builts are being reviewed. 1 warranty item for plant replacement on roof top remaining. Fluid Distribution
System nearing completion. Waste oil heater waiting for the tie in.
2.26 Budget
For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current
meeting minutes. Please refer to previous editions of the minutes for older insertions.
7/13/10
No updates
1/13/11
DPF transmitted budget status Update, Currently $184,982.00 in encumbered funds and $2,560,381 in un-
committed funds remaining. Advising that $250,000 may be required for the wash bay fix, $200,000 held for
potential AC expansions if approved, $50,000 for contingency, and $40,000 for approved EOC expenses not yet
transitioned to Purchase Orders.
2.60 Site Signage at Street
For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current
meeting minutes. Please refer to previous editions of the minutes for older insertions.
11/9/10
Existing lights have been powered up and are too strong and create hot spots, DPF to contact light vendor for fixture
recommendations.
12/14/10
DPF made contact with Reflex lighting and is waiting fixture recommendations.
1/13/10
DPF working with DPW to develop cost effective design solution to lighting issue.
2.61 Punch List
For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current
meeting minutes. Please refer to previous editions of the minutes for older insertions.
9/14/10
HKT presented updated punch list and warranty items.
PBC asked if vehicle wash bay items were part of the punch list. HKT responded that they were not, as they did not arise until well
after the punch list was created.
12/14/10
HKT reported punch list complete.
2.73 Fluid Distribution System
For the purposes of reducing ongoing printed text, previous entries under this heading may have been removed from current
meeting minutes. Please refer to previous editions of the minutes for older insertions.
7/13/10
Parts are on order for interfacing system with existing tank monitoring system and spill boxes, when received system will be
complete.
12/14/10
Waste Oil Heater & Fluid Distribution System at 98% complete
Page 3 of 6
PBC Meeting Minutes
13 January 2011 Meeting
2.82 Wash Bay
04/13/10
The PBC toured the vehicle car wash area to review the current conditions of erosion, paint decay, water seepage and equipment
operation. See HKT email of 1 -28 -10 and HKT letters of 2 -4 -10 and 3 -25 -10 and RW Sullivan memo of 5- 12 -10.
After much discussion of the many issues involved the PBC requested that HKT return to the next meeting with recommendations on
how each item can be addressed and resolved.
5/11/10
HKT power point presentation will be forwarded to DPF.
Design team has not seen this type of condition with similar systems in other DPW's.
Review of steel, operator and disconnect.
Discussion needed of sequence of operation for the car wash.
PBC discussed HKT pursuing painter to get them to do as much as possible, but do it right.
Motion to set aside monies to hire a specialist to review conditions and processes of the wash bay area, may include forensics.
Motion: Dick Perry 2nd: Eric Brown Vote: 5 -0
6/08/10
Simpson Gumpertz & Heger Proposal was reviewed by PBC. PBC members would like the scope and tasks for investigation needs to
be defined. Mark Barrett to coordinate a meeting to discuss with Greg from SG &H.
7/13/10
Meeting was held on 6118110 to review SGH Scope on report for vehicle wash Bay.
Draft report due on 7/26/10 for PBC review and proposed review mtg on 7128110 with Town Manager.
9/14/10
When estimate is received DPF will send out to PBC members to review.
10/12/10
It was discussed that in future contracts System Design Statements along with training requirements need to include design
intent.
2.83 Front Walkway
9/14/10
DPF reported that DPW had a cost range of $13- 15,000 to install a sidewalk following the incoming driveway, instead of passing by
the flagpole at the center. PBC felt that the work could be done for less money and should be bid instead of using the state vendor
contract and that HKT had a responsibility to provide the town with design options and construction documents that could be put
out to bid. PBC asked DPF to notify HKT on need to meet design /code requirements and that they should provide layouts /options
(bike path is not a viable design option) to the PBC for review and that construction documents suitable for bid should be provided
10/12/10
Mark Barrett will contact Gary Rhodes for a memo on code violation.
11/9/10
Memo was sent to HKT and awaiting response.
12/14/10
HKT provided several sketches that would satisfy the requirement to connection the public sidewalk to the front entrance. The
PBC elected to have Bill Hadley select a walkway plan from those presented, that he was satisfied with from and get pricing to
complete the work.
2.84 Emergency Operation Center
6/08/10
Motion to approve expenditure of funds not exceeding $43,550.00 for the purposes of equipping the EOC at 201 Bedford Street.
Subject to the Town Managers approval that this expenditure represents an appropriate use or allocation of project funds for the full
scope required for EOC operations.
Motion: Eric Brown 2nd: Carl Oldenburg Vote: 4 -0
2.85 LEED Gold
12/14/10
HKT outlined that the project was 2 credits shy of a Gold certification for LEED and suggested costs of $6,000 to $7,000 to
investigate and pursue those two additional credits with no guarantee of receiving them.
The PBC elected to not pursue the extra credits.
Page 4 of 6
PBC Meeting Minutes
13 January 2011 Meeting
2.86 Mechanics garage A/C
1/13/11
DPF requested that the PBC consider funding an approximate $8,500 engineering study and evaluation report on
the provision of air - conditioning to the mechanics garage bays and sign shop at 201 Bedford street.
The PBC denied action on the request to support the evaluation study. The PBC citied that it was not part of the
original building scope and that they as a body had previously agreed that no further requests should be considered
for the use of un- committed funds from the project, see item 2.2 above.
3.0 Cary Memorial Hall - Venue Improvement Study
3.2 Progress
11 -9 -10
It was reported that the project was initiating and that public Meetings were being scheduled to gather data on the
use of the building.
4.0 Bridge &Bowman Renovation Projects
4.4 Update from School Committee Meeting
12/14/10
The committee was given an overview of the presentation that was shown to the School Committee in support of
additional scope items.
The School Committee recommended pursuing additional funding to incorporate the additional scope items.
4.4 LEED Certification
12/14/10
The Project Architects outlined that LEED certification was not considered to be viable given the scope and nature
of the proposed work at Bridge and Bowman and recommended against pursuing the certification. The School
Principals' thought that the funding for LEED pursuits could be better suited to go towards items that will effect
programming or educational issues.
4.5 Project Direction
12/14/10
With the School Committees support of pursuing increased funding to expand the base scope of the project
discussion ensued on the paths of the project and if and how work could continue until the spring town meeting.
The DPC suggested a fee increase would be warranted in the area of $280,000 to accommodate the increased
scope. Multiple scenarios were discussed concerning what scope items could continue, scheduling paths and what
work could be continued contractually.
Motion to recommend that project go dormant until additional funding is authorized for expanded scope or
direction to continue with original scope received.
Motion: Dick Perry 2 Carl Oldenburg Vote: 6 -0
Page 5 of 6
PBC Meeting Minutes
13 January 2011 Meeting
5.0 Fire and Police Study and Design
5.5 Fire Station Site Survey
04/13/10
A site survey was initiated and the Architects expect result by the next meeting.
5/11/10
Discussion about the Monitoring wells and filtration system at the Fire site revolved around limitations on development. Mark
Barrett to Follow up.
6/08/10
Email distributed information available to all parties on the monitoring wells.
9/14/10
Donham & Sweeney met on site with Conservation agent who recommended flagging the wetlands.
5.6 Written report / hard copy
8/10/10
It was stated that the final submission of this study would be in the form of a final written document /manual. Further, that a
submission should be made constituting a progress submission for this final document as portions of the manual will likely be
needed for a submittal to the selectmen.
12/14/10
Final report for the Fire Station was received. PBC recommends that Donham & Sweeney complete the Police
Station report in the same fashion as the fire station report and submit copies to PBC to review at next meeting.
6.0 White House HSR — Final Report
6.1 Overview of Final Report
12/14/10
Frank Kern gave the PBC an overview of the work completed in the BH +A Historic Structures Report and the process
undertaken to document the historical characteristics of the Hammond A. Hosmer House (White House).Several
Scenarios of different levels of renovations and stabilization efforts were outlined in the report giving the town
several options to evaluate and consider for the future care of the building.