HomeMy WebLinkAbout2010-03-ATM-AC-rpt APPROPRIATION COMMITTEE
TOWN OF LEXINGTON
oma` agg
0
74a
igt( ea a r4,e, )%
Pi lam
z
'N. APRIL 19TH
-4:6*-6/
REPORT TO THE
2010 ANNUAL TOWN MEETING
Released March 31, 2010
Appropriation Committee Members—Fiscal Year 2010
Alan M. Levine Chair• Glenn Parker Vice Chair
John Bartenstein Vice ChairlSecretary • Robert N Addelson (ex-officio, non-voting)
Richard Eurich •Mollie Garberg • Susan McLeish • Eric Michelson • Joe Pato
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Contents
Contents. 1
Summary of Warrant Article Recommendations. .2
Preface 4
Introduction .5
Warrant Article Analysis and Recommendations .9
Article 4 Appropnate FY2010 Operating Budget. 9
Article 5 Appropnate FY2010 Enterprise Funds Budgets 17
Article 6 Appropnate for Senior Service Program 21
Article 7 Continue and Approve Depaitiuental Revolving Funds 22
Article 8 Appropnate the FY2011 CPC Operating Budget and for CPA Projects 24
Article 9 Land Purchase—Off Marrett Road 29
Article 10 Land Purchase—Off Farm Road 29
Article 11 Appropnate for Recreation Capital Projects 29
Article 12 Appropnate for Municipal Capital Projects and Equipment 30
Article 13 Appropnate for Water Distribution Improvements 32
Article 14 Appropnate for Sewer Improvements 34
Article 15 Appropnate for School Capital Projects and Equipment 35
Article 16 Public Facilities Capital 36
Article 17 Approve Minuteman Regional Vocational Technical School Distnct Borrowing 38
Article 18 Appropnate for Post Employment Benefits 38
Article 19 Rescind Pnor Borrowing Authonzations. 39
Article 20 Establish and Appropnate to Specified Stabilization Funds 39
Article 21 Establish and Appropnate to Debt Service Stabilization Fund 41
Article 22 Appropnate from Debt Service Stabilization Fund 41
Article 23 Appropnate for Pnor Years' Unpaid Bills 41
Article 24 Amend FY2010 Operating Budget 42
Article 25 Appropnate for Authonzed Capital Improvements 42
Article 26 Amend Bylaw—Length of Contracts 42
Article 28 Amend Bylaw—Town Meeting Procedure 43
Article 30 Establish Qualifications for Tax Deferrals 43
Article 31 Support and Petition for Municipal Utility Act 45
Article 36 Resolution on Munroe School 46
Appendix A 47
Page 1
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Summary of Warrant Article Recommendations
Abbreviations GF= General Fund, EF=Enterprise Fund, RF=Revolving Fund,
CPA = Community Preservation Act Fund, BAN=Bond Anticipation Note,
DSSF=Debt Service Stabilization Fund
An entry of`Indefinitely Postpone in the right-hand column merely signifies our expectation
Arti- Funds Funding Committee
cle Title Requested Source Recommendation
4
Appropnate FY2011 Operating $142,363,311 See report Approve (8-0)
Budget
$6,976,607 Water EF
Appropnate FY2011 Enterprise +$7,669,703 Wastewater EF
5 Approve (8-0)
Funds Budgets +$1 720 088 Recreation EF
$16,366,398
6
Appropnate for Senior Service none n/a IP
Program
7 Continue and Approve $2,416,375 RF Approve (8-0)
Depaitmental Revolving Funds
Appropnate the FY2011 CPC $7,859,482 CPA
8 Operating Budget and for CPA +$483 043 GF See report
Projects $8,342,525
9 Land Purchase—Off Marrett $4,000,000 CPA Pending
Road
10 Land Purchase—Off Farm Road none n/a IP
Appropnate for Recreation $50,000 GF
11 Capital Projects +$25 000 Recreation EF Approve (8-0)
$75,000
12
Appropnate for Municipal Capital $3,001,382 See report Approve (8-0)
Projects and Equipment
13
Appropnate for Water $1,060,000 Water EF(debt) Approve (8-0)
Distribution Improvements
14
Appropnate for Sewer $100 000 Wastewater EF Approve (8-0)
Improvements (debt)
15
Appropnate for School Capital $951,071 GF(debt) Approve (8-0)
Projects and Equipment
$1,071,400 GF(debt)
Appropnate for Public Facilities +$728,000 Free Cash
16 Capital Projects +$73,000 CPA Approve (8-0)
+$161,534 Tax Levy
$2,033,934
Page 2
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Arti- Title Funds Funding Committee
cle Requested Source Recommendation
Approve Minuteman Regional
17 Vocational Technical School none n/a Approve (8-0)
District Borrowing
18
Appropnate for Post Employment $479,399 Free Cash Approve (8-0)
Benefits
19 Rescind Prior Borrowing none n/a IP
Authorizations
20 Establish and Appropnate to See report See report Approve (8-0)
Specified Stabilization Funds
21 Appropnate to Stabilization Fund none n/a IP
22
Appropnate from Debt Service $124,057 DSSF Approve (8-0)
Stabilization Fund
23
Appropnate for Prior Years' none n/a IP
Unpaid Bills
24 Amend FY2009 Operating and unknown unknown Pending
Enterprise Budgets
25
Appropnate for Authorized none n/a IP
Capital Improvements
26 Amend Bylaw–Length of none n/a Approve (8-0)
Contracts
28 Amend Bylaw-Town Meeting none n/a Disapprove(0-8)
Procedure
30 Establish Qualifications for Tax none n/a Approve (8-0)
Deferrals
31 Petition General Court for none n/a Approve (8-0)
Municipal Utility Act
36 Resolution on Munroe School none n/a Disapprove(0-7-1)
Page 3
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Preface
This preface contains general information about our reports and other sources of information. It is
followed by an introduction setting forth the financial context from the last year, an overview of the
revenue picture for fiscal year 2011 (FY2011) and the future, and a discussion of issues pertinent to the
Town's general financial situation. We then present article-by-article discussions and recommendations
on those articles that, in our opinion, have substantial financial relevance. Committee votes are always
presented as the number of members for, followed by the members against, and lastly (when applicable)
the members abstaining.
Since this report is pnmanly intended to document our recommendations, we have tned not to repeat
information that is readily available to Town Meeting members from other sources. In particular, an
excellent overview of the estimated revenues and proposed expenditures for FY2011 can be found in the
Town Manager's Report, published in the FY2011 Recommended Budget&Financing Plan, dated March
1, 2010 (the "Brown Book") This document was distributed to all Town Meeting members and is
available online' Likewise, a great deal of information about the budget of the Lexington Public Schools
can be found in the Superintendent's Budget Document (the "Blue Book") and in the more recently
published School Committee Town Meeting Budget Document, which is more concise and more up to
date. Both of these school budget documents are available online' Overviews from the Town Manager
and Supenntendent, as well as many details on the nuts-and-bolts aspects of the budget, may be found in
these materials. In addition,the Brown Book summanzes relevant budget laws and bylaws (see Appendix
B therein) and includes a glossary of financial terms (see Appendix D therein) The TMMA Warrant
Information Report (March 2009) and the forthcoming report of the Capital Expenditures Committee
(CEC) are also important references for this Town Meeting.
Continuing a useful practice, we participated again this year with the Board of Selectmen, School
Committee, and CEC in a senes of budget collaboration/summit meetings wherein staff presented
background information and the participating boards and committees discussed major issues relating to
both revenues and expenditures in an effort to achieve consensus.
It has again been a pleasure to work with Town Manager Carl Valente, Assistant Town Manager for
Finance Rob Addelson, Budget Officer Micah Niemy, Supenntendent of Schools Dr Paul Ash, Assistant
Supenntendent for Finance and Operations Mary Ellen Dunn, the Board of Selectmen, the School
Committee, the CEC, and the Community Preservation Committee (CPC) We also thank the many other
municipal and school staff, Town officials, and citizens who have contributed to our work in a wide
variety of ways.
1 FY2011 Recommended Budget&Financing Plan—http //www l exi ngtonma gov/budget/fy2011budget cfm
2 Lexington Public Schools budget material—http //l ps l exi ngtonma org/busi nessandfi nance html
Page 4
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Introduction
In this Introduction, we give an overview of financial developments since the 2009 Annual Town
Meeting, the proposed FY2011 budget, the current status of the Town's financial reserves, and comment
bnefly on the financial outlook for FY2012 and beyond. The "Report of the Town Manager" in the
FY2011 Brown Book(see link in the Preface)is useful to read before this introduction.
Developments since adoption of the FY2010 budget
The Lexington Public Schools received a federal grant for FY2010 of $818,090 via the Amencan
Resource and Recovery Act (ARRA) The funds were provided for special education and other purposes
(see the School Budget document for details) The Schools expect to receive a similar grant in the same
amount for FY2011 A major portion of the FY2010 ARRA funds are being used for special education
tuitions and expenses that will not be covered by State circuit breaker funding which was reduced from
the levels of the past few years.
Prior to the Special Town Meeting in November 2009, the Massachusetts Department of Revenue
certified the Town's free cash balance as of July 1, 2009, to be $6,159,509 The DOR also certified the
balances, also known as "retained earnings", in the Water Enterpnse Fund ($2,113,729), the Sewer
Enterpnse Fund ($1,831,967), and the Recreation Enterprise Fund ($1,427,466) The Assessors and the
State determined the final figure for new growth for FY2010, viz., $2,431,902, which is substantially
larger than the amount of$1,900,000 that was assumed for the recommended budget for FY2010 At a
total of $9,017,027, state aid for FY2010 came in slightly below the $9,058,898 estimate used in the
adopted budget, as reported in the 2009 Brown Book. The State's financial situation and the economic
crisis is apparent when one compares these numbers with the State aid that was anticipated in March 2008
for FY2009, $9,963,843 (2009 Brown Book), and that actually received for FY2009, $8,854,044 (2010
Brown Book)
After the 2009 Annual Town Meeting concluded, the State legislature approved the elimination of an
exemption of utility poles and wires from the property tax. This expected to generate approximately
$600,000 to$700,000 per year in revenue starting in the current fiscal year(FY2010)
At the special town meeting in November, several financial articles were approved. A summary of the
actions may be found in Appendix A. Of particular note is the approval of increases in local taxes on
meals and room occupancy per the new provisions in the State FY2010 budget legislation. The increase in
the meals tax became effective on January 1, 2010 while the increase in the room occupancy tax will
become effective on July 1, 2010 These two tax increases are projected to yield a total of roughly
$440,000 per year in additional revenue. We also note the appropriation of$669,843 into the Stabilization
Fund, this amount representing the net change in projected revenues relative to appropriations from the
time of the Annual Town Meeting to the fall.
As of press time, the most recent review by the Town's professional staff of the current fiscal year
(FY2010) reveals only one area that will end the fiscal year in deficit, i.e. snow and ice removal. Snow
removal costs as of March 29, 2010,were approximately$1,476,000 while the formally budgeted amount
is $737,455 (as a component of the DPW budget) In addition to this amount, $300,000 is proposed to be
set aside via a revenue offset in the FY2011 budget to address year-end deficits. Since snow removal
costs increase in a most unpredictable manner,we will present an update orally at Town Meeting.
The Town Manager and staff may request the approval of adjustments to the FY2010 budget to address
the snow removal deficit or other presently unidentified financial issues under Article 24 This will be
done late in Town Meeting. The Reserve Fund can be used, upon approval of this Committee, to address
deficits that anse after the end of this Town Meeting. There is also a mechanism for making limited inter-
Page 5
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
line-item transfers at the end of the year Finally, the Town Manager has recommended setting aside
$200,000 of the Free Cash balance in case it is needed to help cover FY2010 deficits.
As of press time, there have been no transfers out of the Reserve Fund in FY2010, and therefore, the
entire $550,000 that was appropriated is still available, per approval of this Committee, to address
unforeseen and extraordinary expenses.
The Lexington Retirement Fund's investments declined in value from roughly $120,000,000 in early
2008 to roughly $80,000,000 early in 2009 Since then, the stock market has recovered a substantial
fraction(but certainly not all) of its earlier values, and the value of the Retirement Fund's investments has
followed this partial recovery, being $96,600,000 at the end of January, 2010 This may not be sufficient
to fully cover future liabilities. An actuanal evaluation of the Retirement Fund is being done and will lead
to discussions of the amounts of future appropriations needed to reach 100% funding of the liabilities.
However, the need for such appropriations will depend on the future performance of the stock market and
investment returns as well as on other factors that are difficult to forecast. When full funding of the
pension liabilities has been achieved once again, we expect that annual appropriations of amounts similar
to those being appropnated for FY2011 to fund future pension liabilities will then be made to address the
Town's liabilities for future retiree health care costs.
We applaud the completion of the new Public Services facility and the transition of the DPW staff, the
Engmeenng Depaitiuent, and the Public Facilities Depaitiuent into their new location.
FY2011
Every Town budget depends upon an estimate of revenues. While most—those from the property tax and
available funds—are more or less definite (with the exception of new growth) given that there is no intent
to seek approval of a Proposition 2'/2 ovemde, the amounts of state aid and local receipts that will be
received are less certain. New growth, i.e., the property tax on newly constructed buildings and new
commercial equipment, is estimated at $1,500,000 The corresponding number for FY2010 was
$1,900,000 The reduction of the estimate from FY2010 to FY2011 was made in response to a decrease in
construction activity
As has been done for several years, the FY2011 budget earmarks $300,000 to be applied to any snow
removal deficit remaining from FY2010, that amount is camed in the budget as a revenue offset.
The recommended budget assumes that State aid will be level-funded, i.e.,the same as for FY 2010 As of
mid-March, key legislators have suggested that a reduction in the neighborhood of 3% to 5% is likely
The Town Manager recommends that reductions in State aid below the budgeted level be covered by first
reducing uncommitted funds within the budget (about $427,000 as of press time) and then by
appropriation of funds from the Stabilization Fund. The filling of temporary revenue shortfalls is one of
the main purposes of the Stabilization Fund.
In his report in the Brown Book, the Town Manager discusses the development of the recommended
budget. Among other parts of the process, he tells about the allocation of"new" revenue to the schools
and municipal budgets in a 71.5/28 5 ratio Our comment about this last year is worth repeating. Even
though this revenue allocation has now been the practice for several years, it should be regarded as a
starting point for discussions and not as an inviolable end point. If circumstances demand that the new
revenue be allocated in a different way, e.g., because of differing priorities of unfunded programs, then
the revenue allocation should be adjusted accordingly
The Minuteman Regional High School assessment is lower than last year's assessment by about 10%.
Please see the discussion under Article 4 for details.
In regard to health insurance for Town and School employees, the Town's consultant and Blue Cross
have recommended an appropriation sufficient to cover an 11% increase in health care pnces. That,
together with the projection that 65 additional employees will sign up for Town health insurance plans,
Page 6
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
yields an estimated increase of 13.34% in the budgeted FY2011 amount over the FY2010 projected
amount. See the discussion under the health insurance section of Article 4 for further information.
The Town Manager is recommending the use of$3,860,110 of Free Cash for FY2011 operating expenses.
This amount is a bit more than the amount of$3,668,576 that was taken from Free Cash in FY2010 to
support the operating budget. In addition, the recommended budget includes the use of $1,270,000 to
support recommended capital expenditures and/or debt service, the transfer of$350,000 from Free Cash
to the SPED Stabilization Fund, and the transfer of$479,399 from Free Cash to the Post-Employment
Insurance Liability Fund (for details see the discussion under Article 18 below) Given the Town's current
financial situation, there is no plan this year to transfer any funds into the general-purpose Stabilization
Fund. This proposal is summanzed in Table 1
Table 1 Anticipated Free Cash Changes-2010 Annual Town Meeting
Certified Free Cash, as of July 1, 2009 $6,159,509
Set aside for FY2010 (Article 24) ($200,000)
Less use for operating budget(Article 4) ($3,860,110)
Less use for FY2011 debt service or cash capital(vanous articles) ($1,270,000)
Less transfer to Post-Employment Fund(Article 18) ($479,399)
Less transfer to SPED Stabilization Fund(Article 20) ($350,000)
Less transfer to Stabilization Fund (Article 21) ($0)
Remaining balance at end of Town Meeting(see text) $0
The recommended FY2011 budget (with projects proposed for CPA funding) includes approximately
$12,800,000 for capital expenditures in regard to Town projects, this amount is at least $1,000,000 more
than was appropriated for FY2010 (see the FY2010 Brown Book page XI-3 and the FY2011 Brown Book
page XI-4) Note that purchases or work related to LexHAB and Lexington Housing Authonty properties
are not considered to be Town projects and the funding for those projects is not included in the above
totals. The funding sources for FY 2011 capital projects include the tax levy, enterprise funds, CPA
funds, Free Cash, a revolving fund, and state funding(Chap 90)
FY2012 and beyond
This year it seems that the balanced FY2011 budget proposal that will be presented to Town Meeting did
not require any difficult tradeoffs or sacnfices. This was definitely a positive development, but there are
areas of concern for observers of the Town's finances. Two areas in particular that will need concerted
effort and guidance are employee benefits and the growing list of large capital projects required to
maintain and upgrade the Town's infrastructure.
We don't need to elaborate about the need to control the growth of the costs of health insurance for Town
employees and retirees. It is not hard for many to point to aspects of the current program that they don't
like, but it is difficult to make major changes in these benefits because they are contractual matters
requiring the support of both management and unions. Nevertheless, the Town must strive to reach
agreements where the complete picture of compensation and benefits is fair to current and future
employees,to Town retirees, as well as the taxpayers.
In regard to major capital projects the town must consider in the coming years, the list includes street
resurfacing and reconstruction work beyond the usual annual expenditures in order to catch up with that
which has been deferred past the time of due diligence, renovation and expansion of the High School,
renovation or reconstruction of the four older elementary schools, reconstruction or renovation of the Fire
Department's main building on Bedford St., work on the Police Station, a senior and/or community
center, renovation of the Stone Building in East Lexington, and probably other projects. The total cost of
these projects will approach $100,000,000, and most of them will only be feasible if financing is
Page 7
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
approved in debt exclusion referenda. It will be most prudent for the Town to allocate funds at a level
sufficient to address all of the high pnonty capital needs over some reasonable penod of time
In short, we need to plan for a high level of spending on important capital projects over the coming 10 to
15 years. The Town will need all the help it can get, e.g. by taking advantage of state and federal funds
when they are available, from the CPA, and from citizen support of well-formulated debt exclusion
overrides. Clearly Town officials, boards, and committees will need to engage in discussions of strategies
for managing both areas over the coming months and years.
Page 8
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Warrant Article Analysis and Recommendations
Article 4: Appropriate FY2010 Funds Funding Committee
Requested Source Recommendation
Operating Budget
$142,363,311 See motion See below
Each major section of this request is discussed separately below
Description Funds Funding Committee
Requested Source Recommendation
Lexington Public Schools $68,747,426 See motion Approve (8-0)
Overview
The School Committee has approved a school operating budget that comprises $68,747,426 in Town
funds and $818,090 of federal stimulus funds for a total of $69,565,516 The $818,090 represents the
second half of federal stimulus funds (American Reinvestment and Recovery Act or ARRA) received by
the Lexington Public Schools. The first half of the ARRA funds, also in the amount of$818,090, is being
spent in the current fiscal year (FY2010) In light of the continuing economic downturn, this budget
assumes a 15% reduction in non-ARRA federal and state grants except for the federal special education
(IDEA) grant which is anticipated to be level funded. The requested appropriation is 2 67% more than
was appropnated for this line item in FY2010
The bottom-line total is the amount required for a level-services budget that was prepared by the
Superintendent at the request of the School Committee. However, the budget includes internal
adjustments that allow for certain service improvements without requiring any increase in the requested
funding amount. To be specific, needed improvements in technology education, the restoration of a K-5
social studies coordinator and the addition of a math coach are being funded by the elimination of a
vacant position and a speech/language position.
American Recovery and Reinvestment Act of 2009 (ARRA)
The use of ARRA funds is regulated by highly specific rules and guidelines. Due to the rules and
guidelines the district considers these funds to be non-recumng in nature. For these reasons, the district
has designated the funds for special education and professional development. As a result, funds for
Special Education Tuition will need to be appropnated by Town Meeting in FY12, and the source of
funds to continue the professional development program will need to be identified in the existing
appropriation or additional funds sought from Town Meeting. The funds made available through ARRA
are proposed to be used as follows.
ARRA supported expenses Amount 1
AIMSweb (K-5 literacy assessment tool) $25,000
Conference Registrations $10,000
Travel Costs $10,000
Materials & Supplies $30,000
Equipment $10,000
Page 9
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
ARRA supported expenses Amount
Professional Services $50,000
Teacher Stipends $75,000
Technology Integration Specialist $80,150
Prof Devel. Program Admin. Support $11,000
Field Technician $19,500
Out-of-District Tuitions $409,045
Support Staff/Paraprofessional $88,395
Total $818,090
Enrollments
Projected enrollments for FY2010 and FY2011 are as follows
Grades FY2010 Actual FY2011 Projected Change %Change
(as of 10/09)
K-5 2675 2649 -26 -0.97%
6-8 1486 1484 -2 -013%
9-12 1970 1981 11 0.56%
Total 6131 6114 -17 -0.28%
The number of children living at Avalon at Lexington Hills has exceeded the threshold of 111 students
stipulated in the agreement between Avalon and the Town of Lexington. With an anticipated
matriculation of 166 students this year, a transfer from the education trust fund of$390,500 set up for this
purpose by Avalon Bay Communities will be executed. The School Committee has laid out a plan to use a
portion of these funds to offset the FY12, FY13, and FY14 budgets to partially replace the ARRA funds.3
Athletics Fees
The school administration has not been able to restore program or staff cuts from previous years or lower
fees for various programs and services. After the Spring 2006 ovemde was not approved by voters, fees
were instituted or increased in September of 2006 to cover some of the costs of the elementary
instrumental music program, athletics, transportation to school, preschool, full-day kindergarten, and
school lunches. Detailed fee schedules are available on page 19 of the Blue Book.
The Superintendent has recommended a fee increase for Middle School athletics in FY2011 as the
program has not been self-funding and has been subsidized in part by High School athletic fees. If voted
by the School Committee later this spring, fees for Middle School varsity sports would increase to $200
per sport from $100 currently,junior varsity sports would increase to $100 per sport from $65 currently,
and intramural and before school sports would increase to $75 from $65 per session. An increase in an
administrative policy cap on the prices of school lunches is also being considered, and, if approved, could
lead to an increase in costs to students.
Program FY2010 Fee FY2011 Proposed Fee Change
High School $300 for 1't or 2nd sport, $300 for 1't or 2nd sport, No change
Athletics 3rd sport free. 3rd sport free
Family cap of$600 Family cap of$600
Middle School $100 per varsity sport; $200 per varsity sport; +$100 varsity
; http //lps lexingtonma org/Current/FY11bud/2010-01-26LPS3yr-proj pdf
Page 10
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Program FY2010 Fee FY2011 Proposed Fee Change
Athletics $65 per junior varsity sport; $100 per junior varsity sport; +$35 junior varsity
$60 per intramural session $75 per intramural session +$15 per intramural
Family cap of$600
Elementary $65 for Before School $75 for Before School Sports +$15
School Athletics Sports program Program
School Lunch Breakfast: $2 Breakfast: $2 Lunch. +$0.25
Lunch. $3 50 Lunch. $3.75 This is a policy cap
Milk: $0 60 Milk: $0 60 adjustment,not an actual
Elem. Sensible Sides Elem. Sensible Sides lunch pnce increase as yet.
$0.50-$1.25 $0.50-$1.25 It will not be known until
Middle School and High Middle School and High June if the Administration
School. a la carte and School. a la carte and will have to raise lunch
premium. $0 50 -$1.25 premium. $0 50 -$1.25 pnces.
Expenses
Expenses are comprised of supplies, matenals, special education out-of-distract tuition and transportation,
consultants, etc Full details are provided within the Blue Book, p 84 Expenses are projected to increase
4.98% in FY2011 but expenses still comprise only 16 1% of the total budget. Salanes and wages grew at
a more modest 2.23%. Total budgeted costs will grow by an aggregate rate of 3 89%, but because of one-
time ARRA funding the town's FY2011 expenditure for the school budget will only grow by 2 67%.
FY2009 FY2010 FY2011
Type Actual Revised Request %Budget %Change
Salanes and Wages $53,418,882 $56,290,945 $57,548,883 82 7% 2.23%
Expenses $10,410,466 $10,667,348 $11,198,543 161% 4.98%
Appropriation Request $63,829,347 $66,958,293 $68,747,426 2.67%
ARRA $818,090 1.2%
Budget Total $63,829,347 $66,958,293 $69,565,516 3.89%
Special Education Expenses
Special education expenses constitute significantly more than 50% of all expenses in this proposed school
budget. They remain a challenge and major dnver of the school budget and so are discussed more
extensively here.
Major reduction in State 'circuit breaker reimbursements for out-of-district tuition After town meeting
last year, the State reduced the reimbursement rate to all school districts from 72% to 42% for out-of-
distnct placement that exceed four times the foundation budget. In FY2011,the Lexington Public Schools
are projecting a 40% reimbursement rate and anticipate receipt of$1,304,154 based on November 2009
eligible students. Out-of-District tuition increased 16 38%,net of circuit breaker funding.
Out of District Budget FY2010 Revised FY2011 Projected %Change
Total Number of Students 93 98 5.38%
Total Cost $6,957,080 $7,346,252 5.59%
Circuit Breaker $1,720,001 $1,304,154 -27.23%
Net Cost to Town $5,237,079 $6,094,662 +16.38%
'More line item detail is available in the Superintendent's budget document located at
http //lps lexingtonma org/Current/TOC htm
Page 11
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Increases in contracted services,for specialized service delivery to students Annual reviews of individual
education plans have warranted an increase in the need for outside contractors who provide assistance
with regard to specialized services and legal proceedings.
Transportation savings A decrease in special education out-of-distract transportation costs is expected
due to a program that was started recently Lexington collaborates with Arlington, Burlington, Waltham,
and Watertown to enable multiple students who attend the same school to be transported in one vehicle.
This successful program has resulted in $186,166 savings to the town in FY2009 and is anticipated to
yield over $400,000 in savings in FY2010 The FY2011 savings from the collaborative routing is
projected to be $297,000 (see page 118 of the Blue Book) However, a route reconfiguration among the
member communities may be required that could reduce savings slightly
Additional staffing requirements Fiske and the High School intensive learning programs (ILP) and
Clarke's developmental learning program (DLP) will likely need additional staffing due to increases in
the numbers of students served by these programs. This budget holds in reserve two unallocated teaching
positions.
The Committee unanimously(8-0)recommends approval of this request.
Description Funds Funding Committee
Requested Source Recommendation
Minuteman Regional High School Assessment $1,538,811 GF Approve (8-0)
The MRHS School Committee has accepted a budget for FY2011 of$16,238,679, a $1,257,322 or 7 19%
budget decrease over the current year This budget implements programs intended to lower
extraordmanly high per-pupil expenditures and extraordmanly low student/teacher ratios which have
resulted from a declining enrollment. Savings generated will help offset decreases in state aid and are one
factor in a temporary cessation in the escalation in member town assessments.
This budget assumes level out-of-distract enrollment and a small growth of in-distract students. Salanes,
which make up 57% of the budget, decreased $1,094,725 (-10 6%) Staff reductions include 8 teaching
positions, 5 administrators, and up to 6 FTE's of support staff Non-salary expenses decreased $167,401
(2 3%) Two programs, auto body and office technology,have been eliminated, supply budgets have been
reduced 10-20% and numerous adjustments have been made. The school continues its commitment to
infrastructure renewal with an identical annual capital budget of$380,000 An expanded discussion of the
school's capital needs can be found under Article 17, Minuteman Borrowing.
As of October 1, 2009, 621 full-time students were enrolled. Roughly 60% of these students are from in-
distnct towns and 40% are from out-of-distract towns. There are no "Choice" students attending. The in-
distnct enrollment is 7 students (+1.9%) higher and the out-of-distract enrollment is 9 students (-3.5%)
lower than one year earlier Special education students compnse 40% of the FTE enrollment.
Although the State caps the non-resident student tuition rate, that rate is now set using the actual in-
distnct average cost as a factor The non-resident tuition rate for FY2010 was set at $16,500 per student,
and is expected to nse to $16,800 for FY2011 Non-resident SPED tuition assessments will rise to $5,000
per student.
Member towns are assessed for the upcoming year based on their student enrollment in the current year
These assessments are used to fund the portion of this budget that is not funded by the combination of
(1) all other projected revenues, and (2)member towns' State Required Minimum (SRM) per-student
payments. This year's assessments are based on an MRHS budget funded with a projected $2,029,285 of
Chapter 70 money and $360,000 in transportation aid. These estimates are based on the Governor's
budget H-1,which indicates a decrease of$324, 040 in state aid(-$208,383 [-9.3%] in Chapter 70 aid and
-$115,657 [-24.3%] in transportation aid) compared with FY2010 Of course, all of these figures, with the
Page 12
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
exception of the bottom line MRHS total, are preliminary until final approval of the State's FY2010
budget.
The current revenue plan may lead to future financial problems. The other significant revenue source
under item (1) is out-of-distract tuition. Average yearly tuitions collected over the last five years is $3 5
million. Up until FY2002 the school budgeted very conservatively, considering anticipated but
uncollected tuitions to be too speculative, and only applied the tuition collected from the prior year
towards its budget. Starting in FY2003, $280,000 of current year(anticipated)tuition was applied towards
the budget. In FY2008 the amount was $375,000 and in FY2009 it was $382,000 When deteriorating
state finances led to unanticipated cuts in FY2010 state aid, MRHS took the emergency measure of
offsetting lost revenue by increasing the use of current tuition money to $888,000, instead of increasing
already-set district assessments. Prior and current year tuition contributions in FY2010 totaled $4.3
million. This use of FY2010 current year tuition creates a problem for FY2011, since the available prior-
year tuition consequently drops from$3 46 million to$2 9 million. In response, MRHS plans to use $1 63
million in current year tuition as part of the FY2011 budget. However, this number may make up the
shortfall, but increases the total amount of tuition applied to $4.54 million which is far in excess of the
annual tuition collection of$3 4 million. The District has thus reduced the funds it could draw on to make
up for any further decreases in state aid. While this practice has the short-term benefit of reducing in-
district assessments by $240,000, it is not sustainable Future budgets will require either significantly
increased state aid, increased out-of-district tuitions, reduced expenses, or some combination thereof, or
else in-district assessments will increase substantially
Minuteman's Projected Assessment-based on the unapproved House-1 budget
PROGRAM FTE BASIS AVE PER PUPIL ASSESSMENT
ENROLLMENT* CHG
FY10 FY11 FY10 FY11 FY10 FY11
Grades 9-12
Regular Day Students 64.5 62.5 $8,223 $5,808 $530,374 $363 025
Special Education Assessment 26 21 $4,500 $4,500 $117 000 $94,500
State Minimums for Lexington 70 69 $13,579 $13 847 $950,514 $955 450
Totals,grades 9-12(inc. SPED) 64.5 62.5 $24 773 $22,608 $1,597,888 $1 412,975
Special Program.
"Reduced Charge" Pupils 11 11 $4 909 $5 773 $54 000 $63,500
TOTAL OPERATING 75.5 73.5 $21 879 $20,088 $1 651,888 $1 476 475
Capital Assessment(based on enrolled 9-12) $950 $997 $61,275 $62,336
TOTAL ASSESSMENT $22,691 $20,936 $1 713 163 $1,538,811
percentage increase over prior year 18 62% -7 73% 13 41% -10 18%
* -prior year's enrollment as of October 1
A breakdown of the full assessment is given above. The preliminary assessment for Lexington for
FY2011 is $174,352 (-10.2%) less than the FY2010 actual assessment. The main portion of this
assessment is based on Lexington's FY2010 Base Enrollment (as of October 1, 2009) of 62 5 full-time
regular students in grades 9-12, 2 FTE's less than last year Lexington's enrollment has decreased while
the overall MRHS in-district enrollment has increased, lowering our Town's share of in-district
enrollment by 5%. This has decreased our total full-time student operating-share assessment by $167,349
(-31.5%) to $363,025, a per-pupil decrease of 29 4%. In addition, Lexington's total SRM payment
increased$4,936 due to an increase in our per-student SRM payment.
The Committee unanimously(8-0)recommends annroval of this request.
Page 13
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Description Funds Funding Committee
Requested Source Recommendation
Shared Expenses $44,775,186 See motion Approve (8-0)
Shared Expenses encompasses Line 2100, Employee Benefits, Line 2200, Debt Service, Line 2300,
Reserve Fund, and Line 2400, Public Facilities. See pages IV-1 to IV-18 in the Brown Book for more
information.
Employee Benefits (Line 2100) includes the costs for current and future pensions for retired employees,
health (self-insured) and dental (insured through a group policy) insurance for current and retired
employees, premiums for property and liability insurance policies, and potential unemployment and
workers compensation liabilities. It does not include any sums for the funding of health benefits for future
retirees. The latter is covered under Article 18
Health benefits for both municipal and school employees are included in line 2130, a practice that began
with the FY2007 budget. The estimated expense for all health benefits (including health ["medical"] and
dental) to be paid by the Town totals $24,596,032, by far the largest portion of this section. Of that
amount, $23,801,632 is allocated to health insurance, and $794,400 to dental insurance. The health
insurance figure reflects an increase of $2,801,748, or 13.34%, over the restated FY2010 figure
Conversely,the dental insurance cost figure is 7 83% less than in FY2010, a decrease of$57,530
The 13 34% increase in health insurance is not unique to Lexington. As shown in the Special Report
feature in the February 28 and March 1 editions of The Boston Globe, "runaway health costs are rocking
municipal budgets" across the Commonwealth. Lexington is no exception. The projected increase for
FY2011 continues an unbroken stnng of steadily mounting health care costs which have confronted the
Town since 2000 Higher premiums and increasing enrollment of employees and their families in the
various health care plans offered by the Town both contribute to the increase in health costs.
Consistent with the FY2008, FY2009 and FY2010 budgets, the budget for FY2011 identifies the portions
of the projected health benefit costs attributable to municipal, school, and retired employees (see page IV-
6 of the Brown Book) The projected percentage increase of health costs for municipal employees is
15 7%, almost the same percentage increase as in FY2010 The increase for school employees is 14 6%,
compared to an FY2010 increase of 8 7%. The percentage increase in health costs attributable to retired
employees (which includes spouses) is 9 8%. The number of enrollees in each category is expected to
increase, both in individual and in family subscriptions. Most retirees have only individual, as opposed to
family, plans. Individual plans for retirees are less expensive than individual plans for active employees.
The total dollar amounts of the FY2011 estimates for municipal ($4,522,098) and school employees
($12,088,572) differ because a significantly greater number of individuals are employed on the school
side
The total amount budgeted for Line 2130 is $25,714,261 As previously mentioned, employee/retiree
health insurance is $24,596,032 and dental insurance is $794,400 Medicare tax, which the Town pays for
all Town and School Department employees hired after 1986, is $1,097,929, a 10 69% increase over last
year The remaining $20,300 is for life insurance.
The FY2011 budget includes a figure of $198,600 for line 2140, Unemployment Benefits, to fund the
Town's statutory liability for unemployment compensation payments for employees who may be laid off.
Last year the amount budgeted was $267,300 in anticipation of the elimination of a sizeable number of
part-time, benefit-eligible School Department positions (see page IV-4 in the Brown Book) This year's
figure is lower than the FY2010 figure by 25 7% because many fewer positions are expected to be
eliminated.
Page 14
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
The Workers Compensation recommended appropnation in Line 2150, $480,302, is a 19.5% increase
over FY2010, which itself was 19 8% more than the FY2009 appropnation. This reflects actual
expenence and assures an adequate balance in this continuing balance account.
The second largest line in Shared Expenses is line 2110, Contributory Retirement, $3,718,549 This
represents a 2 06%increase over the amount appropnated in FY2010 The sum is paid by the Town to the
Lexington Retirement Trust Fund, which is managed and overseen by the Lexington Retirement Board,to
fund the Town's liabilities for pension payments to retirees in FY2011 as well as to help fund liabilities
for future payments due to current or past obligations. Every three years the Town has consultants make
an actuarial determination of the total amount of the future pension liabilities.
The Commonwealth of Massachusetts had required that municipalities fully fund all such liabilities by
2028 Because of the economic difficulties over the past few years, that deadline was extended to 2030
Based on the annual payments the Town has made, and is projected to continue to make,the Trust Fund is
expected to be fully funded by 2015 "Full funding" is somewhat of a mercunal concept, since it must
necessanly encapsulate a number of disparate and constantly changing factors. Pnmanly due to judicious
investment and management decisions by the Lexington Retirement Trust Fund and a seemingly never-
ending robust economy, the Trust Fund was actually "fully funded" as of January 1, 2008 At that time,
the value of the Trust Fund was approximately $120 Million. However, the economic downturn
dramatically affected the value of the Fund so that, as of January 1, 2009, it had fallen by one-third, to
approximately$80 Million.
Despite that drop,the appropnation request last year, coupled with the resurgence of the stock market and
the Fund's other investments, has restored the Fund to where it is again on track to be fully funded by
2015 This year's appropriation is intended to continue that process.
Funding of the Retirement Trust Fund may be coupled to the funding of health benefits for future retirees.
Once the Lexington Retirement Trust Fund is fully funded, at least a portion of the approximately three
and one-half million plus dollars which annually is appropnated for the Trust Fund can perhaps be
redirected to funding this future liability The final decision whether or not to do that must be deferred
until the Trust Fund is fully funded. See the discussion of Article 18 in this Report.
Debt Service (Line 2200) includes interest and pnncipal payments for within-levy long-term debt (bonds)
and for temporary borrowing. The budgeted debt payment recommended for FY2011 is $4,669,173,
which is $197,740, or 4 42%, higher than in FY2010 The total amount is broken down as follows
temporary-borrowing interest payments of$144,829, long-term debt interest payments of$726,605, and
long-term debt pnncipal payments of$3,797,740 The long-term debt pnncipal payment is 4 84% higher
than in FY2010, which in turn was 16 5% higher than in FY2009, more than offsetting a substantial
decrease in temporary-borrowing payments.
Debt service also includes interest and pnncipal payments for exempt long-term debt and temporary
borrowing. The total of this portion of the budget is $5,871,767, an increase of $125,382, or
approximately 2 18%, over FY2010 Coupled with the figures for within-levy long term debt and
temporary borrowing, the FY2010 recommended total for debt service is $10,540,941, an increase of
$323,123, or 3 16%, over FY2010
The Reserve Fund (Line 2300) acts as a reserve from which the Appropnation Committee approves
transfers for extraordinary and unforeseen expenses. The recommended amount for FY2011 is $550,000
This is the same amount as appropnated in FY2010 Over the past several years, the amount appropnated
to the Reserve Fund has increased from$150,000 in FY2005 to$532,500 in FY2009
This year's recommended appropnation of$550,000 will, in conjunction with other measures, continue
the Town's intent to build sufficient contingency funds into the budget to obviate the need to rely, for
most purposes, upon Free Cash or the Stabilization Fund. The Stabilization Fund is not intended to be a
basic operating reserve, rather it is intended to be a source of funds to offset revenue losses that typically
occur dunng a recessionary penod (see page vi in the Brown Book) The purpose of the Reserve Fund is
Page 15
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
to provide contingency funds in the budget to deal with unexpected and substantial cost overruns without
having to turn to other reserves. The Reserve Fund also relieves individual municipal and school
departments from the need to include reserves in their respective individual budgets.
Public Facilities (Line 2400) In FY2008 a single, unified Department of Public Facilities (DPF) was
created by consolidating municipal and school facilities management and maintenance functions. The
Depaitiuent administers major capital projects, building maintenance, and custodial services. The DPF
operates under the direction and control of a Public Facilities Board which compnses the Town Manager
and the Supenntendent of Schools.
The Department management is now located in the Public Services Building near the Department of
Public Works. This facilitates communication and coordination on projects.
Overall, DPF expenses are projected to decrease by 2 74% from FY2010 This reflects an overall increase
of 0.92%in compensation and a decrease of 5 36%in expenses.
Personal Services (salanes & wages and overtime combined) is expected to increase by approximately
$35,000 Approximately $60,000 of the increase comes from an expected increase in the DPF headcount
by one person, i.e., the LHS Facility Manager, who will be transferred from the School Department. This
increase is offset by a decrease in anticipated overtime as negotiations were undertaken to allow the
department to change the assigned shift of three custodians upon one-day notice. This flexibility, along
with a procedure that requires the custodial supervisor to approve overtime in advance is expected to
result in less overtime Please note that in FY2011 the Public Facilities Revolving Fund budget is
presented as a component of the budget. This affects the comparability of the individual line items of
salaries &wages and overtime from year to year,but, since this is only a presentation issue,has no impact
on the overall budget.
The increase in contracted services results from a change in the outside contractor for custodial services.
Proposals were sought under a State contract versus a proposal process to identify the lowest bidder in an
effort to increase the level of service.
Overall, the utilities budget is projected to decrease by approximately 9% or $313,000 This continues a
trend in savings for the past few years and results from specific and general energy-saving projects
(Clarke Middle School conversion from electric heat to natural gas in FY2009, LHS efficiency
improvements, Estabrook School conversion from oil to natural gas, a full year of reduced contracted
rates, controls upgrades as examples) In general, utility costs are projected based on FY2009 usage and
contracted rates for FY2011 To the extent that a specific project has been undertaken(e.g. conversion of
Estabrook School heating from oil to natural gas) the estimated impact has also been factored into the
estimated usage.
Contracts for electricity (through December 2013), natural gas (through September 2012) and oil (annual
through a consortium including other communities) are in place
We noted last year that the DPF is working toward the goal of reducing the overall energy consumption at
Town-owned buildings for FY2010,but that the estimated savings were not fully factored into the budget.
Indeed, the department is currently projecting actual utility expenses for FY2010 to be an additional
$200,000 under the budgeted amount. We applaud the energy savings that the DPF has achieved.
The Committee unanimously(8-0)recommends approval of this request.
Page 16
APPROPRIATION COMMITTEE REPORT TO 2010 ATM-MARCH 2010
Article 5: Appropriate FY2010 Funds Funding Committee
Requested Source Recommendation
Enterprise Funds Budgets
$6,976,607 Water EF
+$7,669,703 Wastewater EF
Approve (8-0)
+$1 720 088 Recreation EF pp
$16,366,398
A detailed breakdown of the funding request for this article is shown in the following table
Enterprise Fund I FY2009 I FY2010 I FY2011
Actual Appropriated Requested
1. Water
Personal Services $609,985 $640,290 $645,488
Expenses $448,842 $363,186 $385,620
Debt Service $751,641 $1,108,100 $1,200,406
MWRA Assessment $4,565,881 $4,482,551 $4,745,093
Total Requested in Article 5 $6,376,349 $6,594,127 $6,976,607
Indirect Expenses $820,952 $782,176 $743,400
Total Water Enterpnse Budget $7,197,301 $7,376,303 $7,720,007
2. Wastewater
Personal Services $236,450 $270,073 $276,152
Expenses $340,817 $325,600 $330,600
Debt Service $488,135 $633,497 $658,519
MWRA Assessment $5,855,209 $6,245,946 $6,404,432
Total Requested in Article 5 $6,920,611 $7,475,116 $7,669,703
Indirect Expenses $714,536 $691,763 $668,690
Total Wastewater Enterpnse Budget $7,635,147 $8,166,879 $8,338,393
3.Recreation
Personal Services $572,781 $636,560 $631,992
Expenses $871,952 $956,815 $950,896
Debt Service $101,227 $132,600 $137,200
Total Requested in Article 5 $1,545,960 $1,725,975 $1,720,088
Indirect Expenses $106,200 $188,583 $203,583
Total Recreation Enterprise Fund $1,652,160 $1,914,558 $1,923,671
Overview
The Town of Lexington has maintained Water, Wastewater (Sewer), and Recreation Enterpnse Funds
since the state legislature enacted legislation authonzmg such funds, G.L. c 44, § 53F '/, in the late
1980's. An enterpnse fund "establishes a separate accounting and financial reporting mechanism for
municipal services for which a fee is charged in exchange for goods or services. Revenues and expenses
of the service are segregated into a fund with financial statements separate from all other governmental
Page 17
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
activities" and are accounted for on an accrual basis. DOR Enterprise Funds Manual (April 2008) An
enterpnse fund provides management and taxpayers with information to measure performance, analyze
the impact of financial decisions, and determine the cost of providing a service Enterpnse funds may be
operated on a stand-alone basis or subsidized by the General Fund.
The Water and Wastewater Enterprise Funds operate on a completely stand-alone basis. These funds do
not rely on any tax-levy revenues, but cover their complete operating and capital needs with user charges
and fees. The Recreation Enterprise Fund is only partially stand-alone. It covers its operating costs with
user charges and fees and contributes to the debt service on certain recreation capital projects (in
particular,the Lincoln Field restoration project) Most recreation capital costs, however, are subsidized by
the General Fund through a combination of within-levy borrowing, Community Preservation Act (CPA)
funding, and debt exclusion funding.
Establishing the Enterprise Fund Budgets
At the Annual Town Meeting each year, Town Meeting appropnates a budget for each of the three
enterpnse funds for the upcoming fiscal year Later in the year (in the early fall in the case of the Water
and Wastewater Enterpnse Funds), user charges are set that are designed, based on projections of usage
for the fiscal year, to be sufficient to cover the appropnations made by Town Meeting to run the
enterpnses.
Depending on the accuracy of the usage projections, the actual revenue realized by the enterpnse dunng
the year may exceed or fall short of the appropriated amount. Any operating surplus must be retained in
reserve in the enterpnse fund. The funds accumulated in that reserve (referred to as "retained earnings")
may be applied only to meet the capital needs of the enterprise or to reduce user charges. Any operating
loss (after applying any accumulated reserves in the fund), must be made up in the succeeding fiscal
year's appropnation.
Since FY2007, the Annual Town Meeting Warrant has contained a separate Article for the appropnation
of the enterprise fund operating budgets (previously, appropnations for the enterprise funds were
commingled with those for the General Fund) This presentation makes it easier to understand the
operating budgets of the enterprise funds. However, it should be noted that certain indirect costs that are
charged by the General Fund to the enterpnse funds (see discussion below) are still appropriated as part
of the municipal operating budget, this year in Article 4 For the complete operating costs of the
enterpnse funds, including indirect costs, see the Brown Book, pp V-25 (Water), V-29 (Wastewater) and
VII-9 (Recreation)
To present a more meaningful picture of the complete enterpnse fund operating budgets, the tables
included above have been expanded from those presented in the Warrant to show the indirect as well as
the direct costs of the funds. Debt service costs for previously approved capital expenditures are shown in
the enterprise fund operating budgets. However, it should be noted that appropnations for capital needs of
the enterpnses, whether funded by cash or borrowing, are addressed in separate capital warrant articles.
(See Article 11 - Recreation Capital Projects, Article 13 - Water Distribution Improvements, and
Article 14 - Sewer Improvements.)
Water/Wastewater Fund Expense Issues
The largest component of the Water and Wastewater Enterprise Fund budgets is the charge imposed by
the Massachusetts Water Resources Authonty(MWRA) for water and wastewater These assessments are
based on the Town's proportionate share of the total MWRA budget, based on its usage in the pnor
calendar year, and are an expense component over which the Town has no control. The requested
appropriations in the motion for this article have been adjusted downward from the higher "placeholder"
figures in the warrant to reflect the MWRA's preliminary estimates of the assessments for Lexington for
FY2010 for water and sewer issued in February 2010, as shown in the following table
Page 18
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
MWRA Assessments
FY2010 Warrant % FY2011 cyo
Fund Actual Placeholder Change Prelim.Assmt. Change
Water $4,482,551 $4,930,806 10 0% $4,745,093 5.9%
Sewer $6,245,946 $7,182,838 15 0% $6,404,432 2 5%
Combined $10,728,497 $12,113,644 12.9% $11,149,525 3.9%
As can be seen in this table, the anticipated increases in MWRA costs for FY2011 are far less dramatic
than might have seemed the case when the warrant was first published. Final MWRA assessments, which
are published in June, are typically lower than the preliminary assessments, and the costs that will be used
dunng the rate-setting process will be further adjusted accordingly (At last fall's Special Town Meeting,
the ongmal appropriations for MWRA water and wastewater assessments were lowered by approximately
$120,000 and $250,000 respectively to reflect the reduced final assessments.) Consequently, MWRA cost
increases are not likely to create significant pressure for rate increases when rates are set for FY2011 next
fall, as they have in the past.
The Water and Wastewater Fund budgets include direct costs, which are pnmanly for (1) the wages and
salaries of the employees in the DPW's Water and Sewer Divisions, (2) the expenses of the water and
sewer maintenance activities and equipment, and(3) debt service on pnor borrowings for water and sewer
enterpnse capital improvements.
It should be noted that debt service costs have steadily increased over the past several years as most of the
recent capital improvements have been financed exclusively with debt, rather than with a combination of
debt and cash as had been the previous practice. See Tables in discussions of Articles 13 and 14 While
the increased reliance on debt financing helps to better spread the costs of projects over their useful life,
the effect of the transition has been a temporary lowenng of current-year capital costs that are now
beginning to return to the ongmal, higher levels through increases in debt service. In addition, the Water
and Sewer Enterprise Funds' debt service burden has been increased by their assumption of responsibility
for approximately 25% of the debt service costs for the construction of the new DPW facility (17% and
7%respectively, based on their expected usage of the new building) It may be possible to mitigate some
of the rate pressure these increased debt service costs will generate with a judicious application of
retained earnings to capital improvement projects (see discussion below of reserves)
The budgets also include indirect costs for services provided to the Enterprise Funds by other
departments, such as insurance costs (health and liability), retirement funding, engmeenng costs, and the
cost of support services provided by the Comptroller, the Management Information Systems (MIS)
Department, and the Revenue Department. In the fall of 2006, following up on a recommendation made
in the final report of the Water and Sewer Rate Study Committee,the Town staff conducted an analysis of
the basis for the indirect charges, and concluded that the level of indirect expenses charged to the Water
and Wastewater Enterpnse Funds was significantly higher than could be justified. To address this issue
without causing undue disruption to the Town Budget, it was decided to implement a gradual phase-down
of the indirect expenses charged to the Water and Wastewater Funds to the levels supported by the Town
staff's analysis over a penod of five years. Consistent with this multi-year phase-down plan, the
recommended budget for FY2011 contemplates modest reductions in the levels of indirect expenses
charged to the Water and Wastewater Funds for a fourth year, as set forth on pages V-22 and V-26 of the
Brown Book.
Previously, the budgets for the Water and Sewer Enterpnse Fund budgets included charges, recovered in
the water and sewer rates, for payments in lieu of taxes (PILOTs) $500,000 for the Water Enterpnse
Fund and $250,000 for the Sewer Enterprise Fund. From fiscal year 2007 through fiscal year 2010, the
Town phased out these PILOTS at the rate of 25% per year The Water and Sewer Enterprise Fund
budgets no longer include PILOTs.
Page 19
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Water/Wastewater Fund Rate-Setting.Revenue and Reserve Issues
As previously noted, the state statute governing enterpnse funds, G.L. c 44, § 53F1/2, requires that
accumulated surpluses resulting from the operations of an enterprise fund,referred to as retained earnings,
remain with the fund as a reserve, and that they be used only for capital expenditures of the enterprise,
subject to appropriation, or to reduce user charges. Deficits must be funded with existing reserves or, in
the absence of such reserves,made up in the following year's rates.
Dunng the early 2000s, difficulties in forecasting usage and other accounting issues resulted in rates
being set at less than adequate levels in several rate years. This, in turn, reduced the retained earnings in
the Water and Sewer Enterpnse Funds to levels of concern. Since 2005, the Town's ability to measure
and forecast water and sewer usage, and thereby to anticipate revenues and reserve levels, has improved
significantly This has enabled the Town to restore and stabilize the water and sewer enterpnse fund
reserve balances, as shown in the table below
Water/Sewer Enterprise Fund Reserves
6/30/06 6/30/07 6/30/08 6/30/09 Proposed Draw
for FY2011
Water $2,090,334 $2,496,655 $2,537,249 $2,113,729 ($500,000)
Sewer $447,441 $2,137,540 $2,763,179 $1,831,967 ($375,000)
Total $2,537,775 $4,634,195 $5,300,428 $3,945,696 $(875,000)
In view of the steadily increasing levels of reserves, which as of the end of FY2008 had grown to about
35% of the annual budget for each fund, net of indirect costs, this Committee urged that a policy be
adopted defining the appropriate level of retained earnings to be maintained for emergency purposes for
both funds, and setting forth guidelines for the use of such funds either to mitigate future rate increases or
to finance capital projects. Although a definitive policy still has not been adopted, the Town Manager has
recommended an interim target of 15% of the annual budget as a reasonable amount to be maintained in
reserve to cover unanticipated costs and/or revenue shortfalls.
In recognition of the difficult economic climate and its impact on ratepayers, the budget approved last
spnng for FY2010 applied $500,000 of water retained earnings and $600,000 of sewer retained earnings
toward the mitigation of rates. These appropriations, reflected as reductions to the retained earnings
balances as of 6/30/09 set forth above, allowed a reduction in the FY2010 rates when they were set last
fall, of 1 8% in the water rates and 3 8% in the sewer rates (even though enterprise fund costs had
increased) The proposed budget for FY2011 includes a similar,but smaller, appropnation of$450,000 of
water retained earnings and $375,000 of sewer retained earnings to mitigate potential FY2011 rate
increases. While this use of retained earnings should still leave reserve balances well above the 15%
target at the end of FY2011, dependence on such funding is being phased out gradually to avoid the need
for major"catch-up"rate increases down the road when excess reserves are no longer available.
As an alternative to the use of excess reserves to subsidize rates, this Committee has advocated applying
some portion of those reserves to funding the capital needs of the Water and Sewer Enterpnse funds. By
lowenng future debt service costs, such funding would help to provide long-term rate stability instead of
merely short-term rate relief. We are pleased to note that this year's proposed appropnation for Municipal
Capital Projects and Equipment (Article 12) does include some modest capital funding of this nature
$25,000 in funding from water retained earnings for the hydrant replacement program(Article 12(o)) and
$45,000 in funding from sewer retained earnings for the purchase of a Jet Vac on tracks (Article 12(d))
See Brown Book,p XI-16
Recreation Fund Issues
This budget represents a decrease of$5,887 (-0.34%) from last year Wages and salaries have decreased
slightly for five full-time staff and 175+/- seasonal staff The decrease is due to the salary differential of a
Page 20
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
new hire replacing a retired employee. Debt service has grown slightly to cover additional issued debt.
Despite a slight drop in expenses, the proposed budget includes more funding for repair and maintenance
of the Town Pool facilities and for tennis,ballfield and basketball lighting.
Of the total revenue for the Recreation Enterpnse Fund operating budget, 55% or $1,060,526 will come
from user fees for fields and registration fees for programs. All programs offered by the Recreation
Department are designed to be revenue-neutral with charges to users matching the program's operating
costs. The other main source of revenue, $776,800, is from golf course fees and is budgeted at a 3.55%
decrease This adjustment will correct a slightly optimistic estimate from the current fiscal year The
three-year golf course management contract, which runs on a calendar year, will be at the end of its
second and beginning of its third year in FY2011, and it expires December 31, 2011 It has a base fee plus
an additional payment for of 5% of collected course fees for this golf season. The base fee for the second
year (starting January 1, 2010) is $360,000 and increases to $368,000 in the third year There are also
options to extend the contract for two additional years at$374,000 per year
In FY2011, indirect, shared, and capital charges against the Recreation Enterpnse Fund will total
$340,783 Under Article 5 (Enterpnse Funds Budgets), $100,000 of the Enterpnse Fund revenue will be
used to continue funding the Lincoln Field debt service and $37,200 for other debt service. The remaining
$203,583 will be appropnated under Article 4 (Operating Budget) to cover indirect expenses, a $15,000
increase from last year's appropnation.
An ongoing Finance Department analysis has identified over $279,000 of indirect expenses incurred by
the Enterprise Fund, which indicates that the General Fund is subsidizing the Recreation Enterpnse Fund
in the amount of about $75,000 The indirect expenses consist of: over $90,000 to cover DPW services
provided to the aquatics facilities and field maintenance, as well as a minimal amount of work at the golf
course and tennis courts, over $54,000 of apportioned services for payroll, accounting, computing, and
oversight through the Comptroller, MIS and Town Manager's offices, and $134,487 for the depaitiuent's
shared expenses such as employee benefits, insurance and pensions. The long-term goal is to better
understand the Fund's complete operating costs and incrementally adjust the annual appropnation to
cover them (which may, in turn, require adjustment of user fees) The fund's retained earnings balance as
of July 1, 2009 was $1,427,467
The Committee unanimously(8-0)recommends approval of these requests.
Article 6: Appropriate for Senior Funds Funding Committee
Requested Source Recommendation
Service Program
none n/a IP
In the Annual Town Meeting in 2006, the acceptance of the statewide senior property tax work-off
program under Chapter 59, Section 5K of the General Laws was rescinded and a locally controlled
program was put in place. This gave the Town the flexibility to
• Allow participation by persons under age 60, such as the disabled and handicapped,who might be
able to benefit from the program,
• Pay a wage in excess of the minimum wage
• Allow more than$750 to be credited against a participant's property tax bill.
The most recent set of guidelines, which became effective in FY2008, are more advantageous to
participants than the state program in the following respects
• Income eligibility is $46,300 for single taxpayers or $52,950 for a couple (versus $36,750 if
single, $42,000 if mamed under the State program)
Page 21
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
• Hourly rate is $8 50 (versus minimum wage under the State program which is $8 00 as of January
1, 2010)
• Maximum credit of $935 (110 hours) for one participant or up to $1,190 (140 hours) for two
participants per household(versus $750 per participant under the State program)
Although the Board of Selectmen has the authority to expand eligibility to persons under age 60 who are
disabled or handicapped, it has not yet done so
Funding
The Senior Service Program is funded by direct appropnation from the tax levy rather than through the
Town's overlay account. The ongmal funding amount of$25,000 was established at a level which was
slightly higher than the amount that had been expended from the overlay account dunng the 2004-2006
fiscal years.
As applications to the program ongmally exceeded expectations, in the Fall of 2006, Town Meeting voted
to increase the FY2007 appropnation by$11,000 to $36,000 to make it possible for all eligible applicants
to participate. The appropnation for FY2008 was increased to $40,000 and again to $45,000 for FY2009
The appropnation for FY2010 remained at$45,000
This level of funding has been more than sufficient to allow the Town to admit all eligible applicants who
wish to participate in the program. Despite an increase in the advertising of the program in the last two
years, the number of participants decreased from 34 in 2008 to 31 in 2009 and there have been 28
participants in FY2010 as of publication. As a result, the funding appropriated in pnor years has not been
fully expended and the continuing balance account for this program has grown to $72,251 as of February
23, 2010, or more than twice the amount required in either of the last two years.
Because the existing balance in the senior service account is more than adequate to fulfill FY2011 needs,
the Selectmen requested that this article be indefinitely postponed. Future appropnation requests for this
program should be adjusted to reflect realistic funding requirements.
Article 7: Continue and Approve Funds Funding Committee
Requested Source Recommendation
Departmental Revolving Funds
See table RF Approve (8-0)
below
Program or Purpose Authorized Departmental FY2010 FY2011
Representative or Receipts Authorization Authorization
Board to Spend
Building Rental Public Facilities Building Rental Fees $275,000 $275,000
Director
DPW Bunal Containers Public Works Sale of Grave Boxes $35,000 $35,000
Director and Bunal Vaults
DPW Compost Public Works Sale of compost and $315,000 $397,000
Operations Director loam,yard waste
permits
LexMedia Operations Board of Selectmen License fees from $400,000 $400,000
and Town Manager cable TV providers
Trees Board of Selectmen Gifts and fees $20,000 $20,000
Page 22
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Program or Purpose Authorized Departmental FY2010 FY2011
Representative or Receipts Authorization Authorization
Board to Spend
Minuteman Household Public Works Fees paid by $175,000 $175,000
Hazardous Waste Director consortium towns
Program
Health Programs Health Director Medicare $10,000 $10,000
reimbursements
Council on Aging Social Services Program fees and gifts $100,000 $100,000
Programs Director
Tounsm/Liberty Ride Town Manager and Liberty Ride receipts, $166,000 $174,375
Tounsm Committee including ticket sales,
advertising revenue
and charter sales
School Bus School Committee School bus fees $830,000 $830,000
Transportation
Overview
Ordmanly, revenue received by any municipal department must be deposited in the General Fund, and
cannot be expended for any purpose without further appropnation by Town Meeting. A revolving fund
allows Town Meeting to dedicate in advance a specific source of anticipated revenue from fees and
charges, on an ongoing basis and without the need for further appropnation,to pay expenses for rendenng
the services for which those fees and charges are collected.
Revolving funds managed by municipal depaaiuents are generally governed by G.L. c 44, § 53E1/2
(There are also a number of revolving funds managed by the School Depaaiuent, such as the School
Lunch Fund, which are governed by other statutes and are not within the control of Town Meeting.)
Under Section 53E1/2, a municipal revolving fund can be established only by vote of Town Meeting.
That authorization must be renewed pnor to each succeeding fiscal year The authonzation must specify.
• the purpose(s) for which monies deposited in the fund may be used,
• the source(s) of funds to be deposited,
• the board, department or officer authorized to expend monies from the fund, and
• a limit on the total amount that may be expended from the fund in the ensuing fiscal year
Expenditures may not be made,nor liabilities incurred, in excess of the balance of the fund. If a revolving
fund is reauthonzed, any balance in the fund may be camed over to the next fiscal year If a revolving
fund is not reauthonzed, or if the purposes for which the money in the fund may be spent are changed,the
balance in the fund reverts to the General Fund at the end of the fiscal year unless Town Meeting votes to
transfer the funds to another duly established revolving fund.
Requested Reauthorizations
Ten existing municipal revolving funds are proposed to be reauthorized this year as shown in the table
above. The spending limit proposed for each of the funds is based on a reasonable estimate of the fees and
charges likely to be received, as well as of the expenditures likely to be required.
Chances in Authorization Levels from FY2010
The DPW Compost Operations Revolving Fund authonzation request is increasing by$82,000 (26 03%)
This increase is related to the "Secunty Gate & Access Control System" capital improvement project at
the Compost Facility The Town Manager has proposed to fund this project through the revolving fund
Page 23
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
and as a result the $82,000 has been integrated into the FY2011 authonzation. You can find a description
on the Secunty Gate project on page XI-15 of the Brown Book.
The Tounsm/Liberty Ride Fund authonzation request is increasing by$8,375 (5 05%) due to increases in
fees and additional hours of operation for the Liberty Ride.
The final fund balances that will carry over from FY2010 to FY2011 won't be known until the end of the
fiscal year As of December 31, 2009,the fund balances were as follows
Program or Purpose December 31,2009
Balance
Building Rental $2,316
DPW Bunal Containers $71,631
DPW Compost Operations $400,845
LexMedia Operations $343,086
Trees $2,316
Minuteman Household Hazardous Waste Program $(6,036)1
Health Programs $9,636
Council on Aging Programs $20,975
Tounsm/Liberty Ride $31,662
School Bus Transportation $(113,863)2
Notes
1 The current balance in the fund as of March 15 2010 is$23 692.22 The deficit balance shown above as of
12/31/09 was due to timing of anticipated receipts to offset costs incurred.
2 This shortfall will be eliminated by a transfer of expenditures posted to the revolving fund being transferred to the
School Operating Budget.
The Committee unanimously(8-0)recommends annroval of this request.
Article 8: Appropriate the FY2011 CPC Funds Funding Committee
Requested Source Recommendation
Operating Budget and for CPA
Projects Details in CPA See below
table below
Background
The Community Preservation Act (CPA) is a state statute that allows municipalities to raise a surcharge
on property taxes for local use for purposes related to histonc preservation, open space (including
recreation), and affordable housing. The State provides matching funds (the amount depending on monies
available and demand from adopting communities) from fees imposed on real estate transactions,
including mortgage refinancing. While the CPA provides broad guidance on the appropnate use of funds,
it allows for a considerable measure of local control through (1) the establishment of a local Community
Preservation Committee (CPC)to review and make recommendations on candidate CPA projects to Town
Meeting, and (2) the authonty of Town Meeting to vote CPC-recommended projects up or down. Town
Meeting may not increase a CPC-recommended appropriation, but it may amend to decrease a
recommended appropriation.
Communities adopting CPA have each implemented the statute in a way that reflects local opportunities,
pnonties and needs. One of Lexington's opportunities lies in the inventory of municipal and school
buildings that qualify as histonc buildings and therefore are eligible for CPA funding. This is a win for
the taxpayers, who benefit from leverage offered by State matching funds, and a win for the Town, which
Page 24
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
benefits from the availability of an alternative funding source to address a backlog of capital projects that
compete each year for limited resources within the tax levy and might not otherwise get done. The CPA
allows this opportunity to be accommodated, if the CPC and Town Meeting so choose, along with other
opportunities for historic preservation, acquisition and preservation of open space and land for
recreational use, and providing affordable housing.
The State Match
The state match awarded for FY2007, the first year following Lexington's adoption of the CPA, was
100%, as it had been since the CPA was enacted in 2001 (Note that state matching funds are disbursed to
communities in the fall of the fiscal year after the surcharge revenues are raised. For example, Lexington
will receive in the fall of FY2011 state funds to match its FY2010 surcharge revenues.) However, as real
estate transaction revenue has declined with the dwindling economy, and as more communities have
adopted the CPA, the matching level has since gone down. In October 2009, the first round match
awarded to all CPA communities for FY2009 was 34 8%. Because Lexington adopted CPA with a full
3% surcharge, it received additional funding in the second and third round distributions, bnngmg its total
match for FY2009 to 36 17%. The latest estimates released by the DOR in March 2010 anticipate that in
October of 2010 the first round match will fall to 31%.
Funds Available for Annronriation
There is over$10,700,000 in CPA funds available for appropriation at this Town Meeting: $6,600,000 in
cavy-forward reserves and $4,100,000 in FY2011 anticipated revenues. Thee latter includes anticipated
FY2011 surcharge collections of$3,133,886 and a State match of about $938,000 (estimated at 31% of
the collected FY2010 surcharges)
This Year's Requests
As of press time Town Meeting is being asked to appropnate in Article 8 $7,859,482 of the available
CPA funds and $483,043 of general funds. Additionally, Articles 9 and 10 concern the appropriation of
CPA funds for the purchase of two parcels of land, properties off of Marrett Rd. and Farm Rd.,
respectively As of press time, discussion of a land acquisition under Article 9 is ongoing. Article 10 has
been indefinitely postponed. (See the discussion of Article 9 in this report) The projects which the CPC
has recommended for funding in FY2011 under Article 8 are listed in the following table
Project Description Funds Funding Committee
Requested Source Recommendation
8(a)Minuteman Bikeway Preservation [XI-20] $320,000 CPA Approve (8-0)
8(b) Storm Water Mitigation-the Old Reservoir $190,047 CPA Approve (8-0)
[XI-20]
8(c) Center Playground Drainage—Implementation $875,173 CPA Approve (8-0)
Phase [XI-21]
8(d) Greeley Village Siding Replacement [XI-22] $386,129 CPA Approve (8-0)
8(e)Vynebrook Village Drainage—Design Study $10,000 CPA Approve (8-0)
[XI-23]
8(f) LexHAB Purchase of Two Affordable Housing $695,000 CPA Approve (8-0)
Properties [XI-22]
8(g)Archives &Records Conservation and
Preservation [XI-21] $150,000 CPA Approve (8-0)
8(h) Cary Library Preservation Project-Archives
[XI 18] $100,000 CPA Approve (7-0-1)
8(i) Cary Memonal Building Venue Improvements $60,000 CPA Approve (8-0)
Study [XI-20]
Page 25
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
80) Cary Memonal Building Signage [XI-21] $25,000 CPA Approve (8-0)
8(k) Building Envelope [XI-17&19] $161,534 GF
$73,000 CPA Approve (8-0)
8(1) Town Office Building Renovation [XI-20] $321,509 GF
Pending
$1,500,000 CPA
8(m) Cary Memonal Building/TOB HVAC Controls $35,000 CPA Approve (8-0)
Upgrade [XI-19]
8(n) Police Station Ventilation System [XI-19] $31,700 CPA Approve (8-0)
8(o) Muzzey Senior Center Improvements Study $45,100 CPA Approve (8-0)
[XI-19]
8(p) White House Historic Structures Report [XI-20] $18,000 CPA Approve (7-1)
8(q) Stone Building Extenor Stabilization [XI-19] $202,933 CPA Approve (8-0)
8(r) Munroe Tavern Capital Improvements [XI-22] $400,000 CPA Approve (8-0)
8(s) Comprehensive Cultural Resources Survey— $5,300 CPA Approve (6-2)
Supplemental Appropriation [XI-22]
8(t) Battle Green Master Plan Study [XI-18] $25,000 CPA Approve (8-0)
8(u) Busa Farm Debt Service $2,562,100 CPA Approve (8-0)
8(v)Administrative Budget $150,000 CPA Approve (8-0)
Cross-references to the Fiscal Year 2011 Recommended Budget & Financing Plan (the "Brown Book")
are given in square brackets.
Article 8(f) LexHAB Purchase of Two Affordable Units $695 000 - LexHAB recently purchased, with the
Selectmen's permission, two existing housing units and has funded those purchases with interest-only
loans. They are requesting CPA funds to pay the full pnncipal of the loans though not any interest
(interest will be paid by LexHAB using its other funds) The closings have occurred and the purchases of
the properties are complete. If the Town Meeting does not support this article, LexHAB would pay part of
the pnncipal of each interest-only loan using its cash reserves and convert the remaining outstanding
amounts to traditional mortgages. Therefore, this article does not address whether LexHAB should
purchase these properties. Rather, the requested funds would essentially enable LexHAB to preserve its
existing reserves for use in future purchases or in projects to build housing on available Town land.
Our Committee is supportive of LexHAB's efforts to increase the state-qualified affordable rental stock
within the town. We are also aware that the timing of the opportunity to purchase existing properties most
likely will not coincide with Town Meeting. However, as stated above, articles such as this one and
similar ones that were approved at the 2008 and 2009 Annual Town Meetings do not give Town Meeting
the ability to approve or disapprove LexHAB's pnor purchases.
We believe that it is time to consider changing this practice At this moment, we favor a model in which
there would be an annual appropriation of CPA funds, placed under the CPC's control, for LexHAB to
use for purchasing existing housing stock; with the amount of such appropriation sufficient to fund
anticipated purchase opportunities for the upcoming year If such a model is adopted, we believe it would
be important for LexHAB to notify the community of its intent to purchase a property using CPA funds
with sufficient time to reasonably allow finance committee members, Town Meeting members, and others
to be able to give meaningful input to the CPC and Board of Selectmen pnor to their decision to approve
or disapprove of the purchase.
Article 8(g) Archives and Records Conservation and Preservation $150 000 — This request will provide
funding for Year 3 of a projected 5-year project for conservation and preservation of historic municipal
documents and records. The project will include conservation/preservation, equipment and supplies,
microfilming and/or digitization, consulting services, computenzation and data migration.
Page 26
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Article 8(h) Can'Library Preservation Project—Archives $ 100 000—This project will convert part of an
existing storage room into a fireproof, climate-controlled room for valuable, irreplaceable histonc
matenals owned by the Library A recent preservation study has found that temperature and humidity
levels fluctuate significantly in the areas of the library housing histonc collections placing the matenals at
nsk.
Article 8(i) Can' Memorial Building Venue Improvements Study $60 000 — This study will examine the
state of the facility in meeting its current uses as a public venue. A previous study authonzed in 2007 was
not conducted due to a determination that expanding public performances in the Cary Memonal Building
as an economic engine for the center district was not practical. In conjunction with the White House
Assessment (Article 8(p)) and the completion of the studies in progress on the facilities of the Fire and
Police Departments, this study will provide the basis to produce a Master Plan and pnontize capital
spending over the next several years on municipal facilities.
Article 80) Can' Memorial Building Signage $25 000 — This project will install directional information
signage inside and outside the Cary Memonal Building. Extenor signage will include a "campus" sign
and identification signs on all three buildings. Police Station, Cary Memorial Building, and Town Office
Building. Cary Hall interior signage will include directories on columns in front lobbies, ADA-compliant
room signs,hallway and stairway signs where needed, and miscellaneous regulatory signs.
Article 8(k) Building Envelope $234 534 - Funds requested for the Municipal Building Envelope project
total $234,534, of which $73,000 for 4 items is requested through CPA funding (see page XI-18 in the
Brown Book) The remaining $161,534 is for projects to be identified and will be funded from the tax
levy This amount follows from an override that included $150,000 for municipal building envelope work
in 2006
Article 8(1) Town Office Building Renovation $1 823 881 - The project is dnven by the need to make the
building accessible — the entrances as well as the mtenor (counters, restrooms, aisle widths, water
fountains) and up to code from a safety perspective This work is required to be done, there is leeway in
terms of the timing. The vacancy created by the move of the Engmeenng Department to the new Public
Services Building affords an opportunity to perform the work with minimal relocation of departments to
other buildings during construction. Additionally, it is a favorable time to engage in construction as
pncmg is competitive in the current economic environment. Prior to the CPC voting on this project, this
Committee voted to recommend approval of this project with full CPA funding. We understand,
however, that the CPC voted to recommend this project at a funding level of$1,500,000 rather than the
full amount requested. It is our intent to obtain more information on the details of how the remainder of
the project will be funded and we will make a new recommendation on the floor of Town Meeting as we
had insufficient time to address this project as currently proposed prior to the printing of this report.
Article 8(p) White House Historic Structures Report$18 000-This will fund a histonc structure report on
the "White House" to study the building and its history so that a determination of what
repairs/maintenance is warranted may be made. One Committee member feels that using these CPA funds
will escalate the histonc status of the building, forcing preservation and ultimately limiting the options
that the town will have when it comes time to reuse the site.
Article 8(q) Stone Building Stabilization $202 933 — This funding will enable additional stabilization
work to the Stone Building to be completed dunng the summer of 2010 The work includes a new roof,
gutters,removal of aluminum siding,repair and painting of wood siding, and reglazmg of windows.
Article 8(r) Munroe Tavern Capital Improvements $400 000 - The Lexington Historical Society was
awarded $50,000 in CPA funds last year for a historic structures report and building needs assessment for
Munroe Tavern. This year's request would fund a portion of the project cost of$820,000 (the remaining
funds will come from the Histoncal Society and will be raised from pnvate individuals) This is a non-
governmental use of CPA funds. In its deliberations, the Committee considered the importance of the
Page 27
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Munroe Tavern to the history of Lexington, its impact in terms of attracting tounsts to Lexington, and the
resulting benefits to the Town.
Article 8(s) Comprehensive Cultural Resources Survey — Supplemental Appropriation $5 300 — Two
Committee members were ongmally opposed to the expansion of the historical designation to homes of
this recent penod without out an opt-in clause for the owners, and continue to oppose additional funding,
which will serve to further strengthen the protected status of these properties.
Article 8(t) Battle Green Master Plan $25 000 — This proposal will fund development of a master plan
document for the Battle Green Area with the assistance of a professional consultant. This master plan will
develop a design that represents the expectation and needs of all stakeholders and will provide a suitable
stewardship framework to oversee the Green's future care.
Article 8(zi)Busa Farm Debt Service$2 562 100-The Busa Farm property was purchased for$4,197,000
under Article 6 of the 2009 spnng Special Town Meeting. At the time of purchase the method of
payment, cash or bonding, was under debate and it was agreed to temporanly fund the Article using Bond
Anticipation Notes (BAN) and that a final decision on the funding mechanism would be discussed and
brought forward the 2010 Annual Town Meeting. Discussions held in the fall between the Board of
Selectmen and the Appropriation, Capital Expenditures and Community Preservation Committees yielded
a consensus to bond the entire purchase using a three year bond with a high principal payment in the first
year This funding mechanism will help maintain the Community Preservation Trust Fund balance while
not encumbenng the taxpayers with long term debt service The three-year note has a first year payment
of$2,562,100, second year payment of$974,000 and final payment of$930,000 The total interest paid
will be $270,000 This article appropnates money for the first payment. Each additional payment will
require a new appropnation.
Article 8(v) CPC Administrative Budget- This year's request of$150,000 for administrative expenses is
identical to the amount requested and appropriated in FY2010 The CPC's anticipated expenses include
3/5 of a staff member's salary and benefits (this full-time employee is shared with other depaiIntents),
dues for membership in the Community Preservation Coalition, and office supplies, and total less than
$50,000 Another $50,000 is allocated to fund due diligence, surveys and appraisals, of potential land
purchases. The amount is that estimated to be needed in the course of preparation for the possible
purchase of two parcels. The remaining funds are reserved for legal expenses. The CPC necessanly relies
on legal counsel for rulings on project eligibility, drafting conservation and deed restrictions, drafting
grant agreements for historic and affordable housing projects, and interpreting court rulings on CPA
issues, and this budget attempts to cavy sufficient funding for legal opinions on many items. In FY2009,
the CPC's legal expenses were $36,600 Current year-to-date legal expenses are$17,835
The CPA statute permits the appropnation of up to 5% of the anticipated CPA revenue for the year, i.e.,
$200,599 for FY2011, to be appropnated for administrative expenses to pay for staff salaries, mailings,
public notices, overhead, legal fees, membership dues, and other miscellaneous expenses related to CPC
projects. Any funds that are not expended close to the undesignated CPA account at the end of the fiscal
year
The Committee, by a vote of 8-0, supports items (a), (b), (c), (d), (e), (f), (g), (i), (j), (k), (m), (o), (q),
(r), (t), (u),and(v) of this request.
The Committee.by a vote of 7-0-1. supports item (n) of this request.
The Committee,by a vote of 7-1, supports item (p) of this request.
The Committee,by a vote of 6-2, supports item (s) of this request.
Page 28
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Article 9: Land Purchase — Off Funds Funding Committee
Requested Source Recommendation
Marrett Road
$4,000,000 CPA Pending
The negotiations on the purchase of a portion of the Cotton Farm together with other provisions
concluded in mid-March. The CPC's public heanng on this purchase has not yet been held. Hence our
report and recommendation on this article will be provided later under separate cover
Article 10: Land Purchase — Off Funds Funding Committee
Requested Source Recommendation
Farm Road
none n/a IP
This article was indefinitely postponed because the Town had not reached an agreement with the owners
of the property
Article 11: Appropriate for Funds Funding Committee
Recreation Capital Projects Requested Source Recommendation
Park Improvement—Athletic Fields [XI-17] $50,000 GF Approve (8-0)
Town Pool Renovation [XI-17] $25,000 Recreation EF Approve (8-0)
Cross-references to the Fiscal Year 2011 Recommended Budget & Financing Plan (the "Brown Book")
are given in square brackets.
Both projects are described in page XI-17 of the Brown Book. Part(a) is phase one of a multi-year capital
plan for the renovation of the town's athletic fields. This year's project requests that it be paid for with
$50,000 from the General Fund. A review of field permit fees show an estimated $230,000 of anticipated
revenue offset by an equivalent amount of field-associated expenses (including an annual $100,000
annual payment against the Lincoln St. fields bond) Part (b) is the first and least expensive phase of a
three-phase project to renovate the pool facility Each phase is a stand-alone project which does not rely
on future work. This project will be funded with$25,000 from the Recreation Enterpnse Fund.
The Committee unanimously(8-0)recommends approval of this request.
Page 29
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Article 12: Appropriate for Municipal Funds Funding Committee
Capital Projects and Equipment Requested Source Recommendation
12(a) Replace Self Contained Breathing Apparatus
[XI 5] $260,000 GF(debt)
12(b) Street Intersections Improvements and
Easements [XI 5] $125,000 GF(debt)
12(c) Comprehensive Storm Management
Watershed Study [XI-5] $110,000 GF(debt)
12(d) DPW Equipment [XI-6,XI-16] $45,000 Wastewater EF
+$91,429 Free Cash
+366,375 GF(debt)
$502,804
12(e) Head End Equipment [XI-6] $240,000 GF(debt)
12(f) Reconstruct and Equip Town Office Building $170,000 GF(debt)
Server Room [XI-6]
12(g) Sidewalk Improvements and Easements $200,000 GF(debt)
[XI-7]
12(h) Storm Drainage Improvements [XI-7] $260,000 GF(debt)
12(i) Marrett/Waltham Intersection Traffic Signal
Poles [XI-7] none IP
120) Dam Repair [XI-15] $10,000 Free Cash
12(k) Traffic Mitigation [XI-15] $50,000 Free Cash Approve (8-0)
12(1) Hayden Avenue/Spring Street Traffic Master
Plan [XI 15] $125,000 TMSF
12(m) Concord Avenue Sidewalk Preliminary
Design [XI-15] $90,000 TMSF
12(n) Central Business Distnct Sidewalks Master
Plan/Engmeenng [XI-15] $50,000 Free Cash
12(o) Hydrant Replacement Project [XI-16] $25,000 Water EF
+$25 000 Free Cash
$50,000
12(p) Pedestrian Signal Improvements [XI-16] $42,000 Free Cash
12(q) Cary Library Material Handling and
Workflow Study [XI-16] $25,000 Free Cash
12(r) Fire Headquarters Alarm Receiver [XI-16] $30,000 Free Cash
12(s) Replace Town Buildings Phone Systems
[XI 17] $55,000 Free Cash
12(t) MUNIS Upgrades [XI-17] $55,000 Free Cash
12(u) Street Improvements and Easements [XI-18] $551,578 Tax Levy
TOTAL FUNDS REQUESTED $3,001,382
Cross-references to the Fiscal Year 2011 Recommended Budget & Financing Plan (the "Brown Book")
are given in square brackets.
Page 30
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Appropnations for FY2010 municipal capital projects summanzed by funding source
Funding Source Amount
General Fund(debt) $1,731,375
Free Cash $433,429
Transportation Mitigation Stabilization Fund $215,000
Water Enterpnse Fund $25,000
Sewer Enterpnse Fund $45,000
Tax Levy $551,578
The Brown Book and the TMMA Warrant Information Book provide a wealth of detail about these
requests which we try to avoid repeating in this report. Many items in this request represent a single phase
in multi-year programs. The comments below attempt to place these individual requests in their full
context.
12(c) Comprehensive Storm Management Watershed Study — This is phase 2 of 3 to be used for a
Shawsheen River watershed study The final phase next year will request$110,000
12(d) DPW Equipment—The annual cost of replacing equipment vanes based on the expected life of the
equipment and the actual wear and tear Estimates for the next five years are show here
FY 2011 2012 2013 2014 2015
Amount $502,804 $453,700 $533,700 $531,000 $427,000
12(e) Head End Equipment — This is phase 3 of 3 in a process to relocate, replace, and upgrade the
equipment used to implement the Town's wide area network. The Town will begin a new 3-phase
replacement cycle in 2013
12(f) Reconstruct and Equip Town Office Building Server Room—This is phase 1 of a 5 year program to
upgrade the Town Office Building Server Room. Projected costs
FY 2011 2012 2013 2014 2015 5 Year Total
Amount $170,000 $220,000 $120,000 $0 $64,000 $574,000
12(g) Sidewalk Improvements and Easements — This is an ongoing program to repair sidewalks
throughout the town. Note that in FY2010 to the Town did not spend any money on this program. The
recent history and projected spending are summarized here
FY 2008 2009 2010 2011 2012 2013 2014 2015
Amount $100,000 $275,000 $0 $200,000 $200,000 $300,000 $400,000 $400,000
12(h) Storm Drainage Improvements — This is part of a multi-phase program to address issues with out-
dated storm drain systems and to comply with new EPA and DEP regulations. The projected costs are
shown here
FY 2011 2012 2013 2014 2015
Amount $260,000 $210,000 $210,000 $210,000 $210,000
12(k) Traffic Mitigation — This is the fourth of four annual requests for the Traffic Mitigation Group
Potential study areas for FY20011 are the southern Waltham St. corridor, town-wide signal compliance
study, as well as evaluation of traffic calming requests.
12(1) Hayden Avenue/Spring Street Traffic Master Plan & 12(m) Concord Avenue Sidewalk Preliminary
Design —The Traffic Mitigation Stabilization Fund (TMSF) is supported by payments made to the Town
Page 31
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
under provisions of Memoranda of Understanding between the Town and developers of certain properties
that have been commercially re-zoned, including Beal Companies, Patriot Partners and Cubist
Pharmaceuticals.
12(n) Central Business District Sidewalks Master Plan/Engineering—This request will begin the process
of a significant re-design of the pedestnan walkways in this area, which will involve changes to lighting,
bnngmg ramps into ADA compliance, and possibly closing off the alley next to the Bank of Amenca
branch. There is no estimate available for the cost of the implementation phase
12(o) Hydrant Replacement Project — The town expects to spend $50,000 to replace 25 hydrants each
year for at least the next five years.
12(q) Can' Library Material Handling and Workflow Study — This is phase 1 of a 3 phase program to
study existing conditions and recommend improvements. Phases 2 and 3 will be for design and
construction,respectively There are no estimates available for phases 2 and 3
12(r) Fire Headquarters Alarm Receiver — Install an alarm receiver at Fire Headquarters capable of
receiving radio box and telegraph signals. The town really does maintain underground telegraph wires
between dispatch and the stations as a backup communication system.
12(s) Replace Town Buildings Phone Systems — This is phase one of a two-year project. This year's
request covers $10,000 in design/engmeer costs and $45,000 for equipment. Next year's request for phase
2 will total $750,000, including $100,000 for design/engmeer, $50,000 for construction, and $600,000 for
equipment.
12(t) MUNIS Upgrade— This is a mandatory software and hardware upgrade for the MUNIS installation
used by the Town.
12(u) Street Improvements and Easements — The $551,578 appropnated in this item will be combined
with$700,000 the Town receives as State Aid (Chapter 90) funds. Town Meeting must vote to accept the
Chapter 90 funds,but they are not actually subject to appropriation by Town Meeting.
The amount appropnated from the tax levy for this item is treated as a set-aside following from the
approval of the FY2001 Proposition 2'// Ovemde that included $500,000 for annual road maintenance.
Each year,this set-aside is increased by 2 5%.
The Committee unanimously(8-0)recommends annroval of this request.
Article 13: Appropriate for Water Funds Funding Committee
Requested Source Recommendation
Distribution Improvements
$1,060,000 Water EF(debt) Approve (8-0)
This Article addresses proposed capital expenditures to be made dunng FY2011 to upgrade and keep
current the assets of the Water Enterprise Fund. For general background on the Enterprise Funds, and the
relationship between the budget process and the water rate setting process,please see the discussion under
Article 5,which addresses the Enterpnse Fund operating budgets.
13(a) — As part of a multi-year project to upgrade aging water infrastructure, a total of $900,000 is
requested this year to replace approximately 5,800 linear feet of unlined or inadequate water main and
deteriorated service connections, and to eliminate dead ends in water mains.
13(b) —An additional $160,000 is requested to drain, clean and rehabilitate water storage tanks to comply
with a new"disinfection by-product"rule issued by the EPA and to help maintain the quality of the stored
water The details of the projects, including the locations where work is expected to be done in FY2011,
can be found in the Brown Book(p XI-9-10)
Page 32
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
The costs of this year's capital projects will be funded entirely by borrowing, although part of the funding
for the pipe replacement project may come from an MWRA loan. The costs of the debt service will be
borne by the operating budgets for the Water Enterpnse Fund in FY2011 and future years until the debt is
retired (see the debt service schedule contained on the same page in the Brown Book), and will be
included each year as an element of the water rates.
Capital appropnations for similar purposes, have been made in most years since the Water Enterpnse
Fund was established (except for FY2006 when engineering studies were not completed in time), as
illustrated in the table below The goal is to keep the system current so the Town can assure dependable
high water quality, pressure, and volume for domestic needs, commercial needs, and fire protection as
well as minimization of water main breaks.
Fiscal Year Purpose Cash Borrowing Total
2003 Water Dist. Improvements $340,000 $560,000 $900,000
2004 Water Dist. Improvements $400,000 $500,000 $900,000
2005 Water Dist. Improvements $400,000 $450,000 $850,000
2006 None $0 $0 $0
2007 Water Dist. Improvements $0 $900,000
Water Meters $0 $250,000 $1,150,000
2008 Water Dist. Improvements $0 $1,800,000 $1,800,000
2009 Water Dist. Improvements $0 $1,800,000 $1,800,000
2010 Water Dist. Improvements $0 $900,000
Equipment $0 $119,000 $1,019,000
2011 Water Dist. Improvements $0 $900,000
Water Tank Rehab $0 $160,000 $1,060,000
Prior to FY2007, as shown in the table above, capital expenditures for water distribution and related
improvements were funded by a combination of Enterpnse Fund cash capital and borrowing. Since then,
there has been a transition to funding these ongoing improvements exclusively with debt. As the
Committee has previously noted, this transition to exclusive debt financing has helped to mitigate the
need for rate increases in the short term, however, it has also increased, and will continue to increase, the
future debt service costs of the Water Enterpnse Fund—as illustrated in the Brown Book, p XI-9, Table
II and summanzed below—which in turn is likely to create greater rate pressure in the future.
Water Enterprise Fund Debt Service Costs
Fiscal Year 2008 2009 2010 2011 2012
Amount $490,833 $850,350 $1,108,100 $1,200,406 $1,495 365
Recent borrowings, including the water fund's 17% contribution to the financing of the new DPW
facility, have nearly tnpled the annual debt service costs since FY2008 to a level that represents a
significant portion of the overall Water Enterprise Fund operating budget (currently about $7 million)
Future borrowings for water distribution improvements will continue to increase the annual debt service
costs of the Water Enterprise Fund, until a new equilibrium between issuance and retirement of debt is
reached. As noted in the discussion of Article 5,judicious use of some of the fund's accumulated retained
earnings could help defray the impact of these growing capital costs and help to maintain long-term rate
stability
It should be noted that one additional capital expenditure proposed to be funded by the Water Enterprise
Fund, the planned purchase of an emergency response box truck for$57,240 for use by the DPW's Water
Division as described in the Brown Book (p XI-10), is not included in Article 13 but is addressed under
Page 33
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Article 12 (Appropnate for Municipal Capital Projects and Equipment) Borrowing for this purpose will
add to the water fund's growing debt burden.
13(c) — The proposed appropnation of$707,250 to fund the first phase of a three-year program to install
an automated water meter reading system is expected to be indefinitely postponed. Weston & Sampson
Engineers, Inc recently delivered a draft report (funded by a $50,000 appropnation at last year's Annual
Town Meeting) recommending the installation of such a system. However, because the Weston &
Samson report does not address a critical element — the operating budget impacts of migrating to an
automated meter reading system — Town Staff has concluded that it is premature to move this project
forward for consideration at the 2010 ATM and will defer this proposal to a future Town Meeting.
The Committee unanimously(8-0)recommends annroval of this request.
Article 14: Appropriate for Sewer Funds Funding Committee
Requested Source Recommendation
Improvements
$100,000 Wastewater EF Approve (8-0)
(debt)
This Article addresses proposed capital expenditures to be made during FY2011 to upgrade and keep
current the assets of the Wastewater Enterprise Fund. For general background on the Enterpnse Funds,
and the relationship between the budget process and the water rate setting process, please see the
discussion under Article 5,which addresses the Enterpnse Fund operating budgets.
A total of just $100,000 is requested to fund year four of a five-year program to upgrade Lexington's ten
sewer pumping stations. The details of the project, including the locations where the work is expected to
be done, can be found in the Brown Book (p XI-10) This year's appropnation request does not include
funding for the ongoing rehabilitation of sanitary sewer infrastructure for which significant amounts were
appropriated in Fiscal Years 2008-2010
The costs of the pumping station upgrade will be funded entirely by borrowing. The costs of the debt
service for this borrowing will be borne by the operating budgets for the Wastewater Enterpnse Fund in
FY2011 and in future years until the debt is retired (see Brown Book, p XI-10, Table III), and will be
included each year as an element of the sewer rates.
Capital appropriations for similar purposes have been made in most years (except for FY2006 when
engmeenng studies were not completed in time) since the Wastewater Enterprise Fund (formerly the
Sewer Enterpnse Fund)was established, as illustrated in the table below
Fiscal Year Purpose Cash Borrowing Total
2003 Storm Sewer Improvements $100,000 $0 $100,000
2004 San./Storm Sewer Improvements $225,000 $0 $225,000
2005 San./Storm Sewer Improvements $750,000 $0 $750,000
2006 None $0 $0 $0
2007 Sewer Improvements $0 $300,000 $0
Water Meters $0 $250,000 $550,000
12008 Sewer Improvements $0 $1,300,000 $1,300,0001
2009 Sewer Improvements $0 $1,300,000 $1,300,000
2010 Sewer Improvements $0 $1,300,000
Equipment $0 $263,000 $1,563,000
2011 (rec) Pump Station Upgrades $0 $100,000 $100,000
Page 34
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Prior to FY2007, as shown in the table above, capital expenditures for sewer distribution improvements
were funded primarily by enterpnse-fund cash capital. Since then, there has been a transition to funding
these ongoing improvements exclusively with debt. As the Committee has previously noted, this
transition to exclusive debt financing has helped to mitigate the need for rate increases in the short term,
however, it will also increase the future debt-service costs of the Wastewater Enterpnse Fun, as illustrated
in the Brown Book,p XI-10, Table III and summanzed below
Wastewater Enterprise Fund Debt Service Costs
Fiscal Year 2008 2009 2010 2011 2012
Amount $473,256 $569,971 $633,497 $658,519 $785,074
As can be seen, recent borrowings, including the sewer fund's 7% contribution to the financing of the
new DPW facility, have increased debt service costs to a level that represents a more significant portion
of the overall Wastewater Enterprise Fund operating budget (currently about $8.5 million, net of indirect
expenses) Future borrowings for sewer improvements will continue to increase the annual debt service
costs until a new equilibnum between newly incurred and retired debt is reached. However, because the
capital improvements proposed this year are significantly reduced from pnor years, the increase to future
debt service resulting from this year's appropriations will be minimal.
One additional capital expenditure proposed to be funded by the Sewer Enterpnse Fund, the planned
purchase of a Jet Vac on tracks for $45,000 for use by the DPW's Sewer Division, as described in the
Brown Book (p XI-9), is not included in this article but is addressed under Article 15 (Appropnate for
Municipal Capital Projects and Equipment) Because this expenditure would be funded exclusively from
retained earnings, it would not add to the Wastewater Fund's debt service burden.
The Committee unanimously(8-0)recommends approval of this request.
Article 15: Appropriate for School Funds Funding Committee
Capital Projects and Equipment Requested Source Recommendation
$951,071 GF(debt) Approve (8-0)
Details of the capital request are shown here
Proj ect Description Funds
Requested
15(a) School Technology [XI-6] $696,000
15(b) Food Service Equipment [XI-16] $99,500
15(c) Time Clock/Time Reporting System[XI-16] $97,000
15(d) Classroom Furniture [XI-16] $58,571
An informative and detailed description of these requests, approved by the School Committee and
submitted for Town Meeting approval, can be found in the "School Capital Plan" section of the Blue
Book and also in Section XI (Capital Investment) of the Brown Book (pages XI-8, XI-9 and XI-13)
Additionally,the TMMA Warrant Information Report contains a comprehensive review of Article 15
In short, the technology request is a continuation of a five-year plan designed to purchase equipment
described in detail in the School Depaitiuent's long range technology plan. The plan includes upgrading
network equipment, information delivery systems for administration and instruction programs, desktop
and mobile computing, pnnters/peripherals and LCD projectors. The request for the replacement of
kitchen equipment is the third annual request and will replace the walk-in refrigerator and freezer at the
Page 35
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Bowman School and a walk-in freezer at Lexington High School. The purchase and implementation of
the KRONOS Time Keeper System will bring the school system into compliance with the Fair Labor
Standards Act, and improve accuracy, and efficiency in the determination, reporting and compensation of
employees' actual work time This is the third year of a multi-year request to replace worn, aging and
unsafe classroom furniture and other furnishings throughout the school system. This year's request will
benefit the Bowman, Clarke, Diamond, Estabrook and Hastings schools.
The Committee unanimously(8-0)recommends annroval of this request.
Article 16: Public Facilities Capital Funds Funding Committee
Requested Source Recommendation
16(a) School Building Roofing Program $147,400 GF(debt)
16(b) Clarke Middle School Auditorium Safety
and Technology Upgrade $174,000 GF(debt) Approve (8-0)
16(c) Bndge and Bowman Schools Renovation
Design, Development and Engmeenng $750,000 GF(debt)
16(d) School Improvement Projects (details
below) $378,000 Free Cash
16(e) School Building Envelope Program $125,000 Free Cash
16(f) Cary Library Energy Management Approve (8-0)
Systems $50,000 Free Cash
16(g) School Grounds Improvement Projects
(details below) $175,000 Free Cash
16(h) Municipal Building Envelope Program $73,000 CPA
+161,534 Tax Levy Approve (8-0)
$234,534
TOTAL $2,033,934
Article 16(d) School Improvement Projects Funds Requested
16(d)(i) School Accessibility Improvements $30,000
16(d)(ii) Relocation of Modular Classrooms from School Administration $30,000
Building
16(d)(m)Hastings School Modular Classroom Upgrade $75,000
16(d)(iv) Hastings School Cabinetry Replacement $38,000
16(d)(v) School Building Floonng Program $100,000
16(d)(vi) Diamond Middle School Boiler Controls $30,000
16(d)(vn) High School Independent Learning Space Program $75,000
16(g) School Grounds Improvement Projects Funds Requested
16(g)(i) Hastings School Parking Area Improvements $50,000
16(g)(n) Estabrook School Playground Replacement $125,000
Page 36
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Ten of the requests in Article 16 are for single year allocations, while the remaining five are part of multi-
year projects. Town Meeting will only be voting to approve the current fiscal year's expenditure, but it is
helpful to consider these projects in their full context. The estimated future costs for these five items are
detailed here
Multi-Year Projects in Article 16
Item Description 2011 2012 2013 2014 2015 5 YR.
TOTAL
16(a) School Building $147,400 $532,507 $527,882 $570,500 $550,000 $2,328,289
Roofing Program
16(b) Clarke Middle School $174,000 $167,000 $100,000 $60,000 $0 $501,000
Auditorium Safety
and Technology
Upgrade
16(d)(v) School Improvement $100,000 $100,000 $100,000 $100,000 $100,000 $500,000
Projects -Floonng
16(e) School Building $125,000 $125,000 $125,000 $125,000 $132,000 $632,000
Envelope Program
16(h) Municipal Building $234,534 $165,572 $169,711 $173,954 $178,302 $922,073
Envelope Program
Item 16(a), School Building Roofing, addresses a senous maintenance issue with our school buildings
and the Committee sees this as a crucial need.
Item 16(b) — This is a 4-year project to restore and expand the auditorium facilities at Clarke Middle
School. Currently the auditorium is not serving the needs of the school's or the town's users very well.
There are also elements of the original technology that have completely failed and should be replaced.
Item 16(d)(v) is part of a multi-year program to repair and/or replace major floonng systems throughout
the school.
Item 16(e) covers the ongoing maintenance and repair for the exteriors of our school buildings.
Item 16(h) does the same for other municipal buildings. Some portions of this work qualify for CPA
funding,therefore this item will be funded by a combination of CPA funds and the Tax Levy As a result,
this item will be voted on pnor to Article 16 when Town Meeting considers Item 8.k in Article 8 The
motion for 8.k will specify$73,000 from the CPC budget and$161,534 from the tax levy
Item 16(c), the Bndge and Bowman Schools Renovation, is the precursor to a major renovation of these
two school buildings. This will likely require a debt exclusion ovemde in 2011 to fund all or part of an
estimated$12,325,000 in costs for that work($6,490,573 for Bowman and$5,135,152 for Bndge)
All of these items are detailed and justified to the satisfaction of the Committee in the Recommended
Budget&Financing Plan (the "Brown Book")
The Committee unanimously(8-01 recommends annroval of this request.
Page 37
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Article 17: Approve Minuteman Funds Funding Committee
Requested Source Recommendation
Regional Vocational Technical
School District Borrowing none n/a Approve (8-0)
The Minuteman Career and Technical High School (MCTHS) is attempting to undertake a renovation
program that will address multiple issues that exist in the 30+year old facility including, but not limited
to, areas of learning, accessibility, and building plant and envelope updates. The MCTHS submitted a
Statement of Interest to the Massachusetts School Building Authonty(MSBA) in an attempt to qualify for
40%reimbursement. The MSBA evaluated the statement and leapfrogged the project over other distracts'
requests, asking MCTHS to conduct a feasibility study The study is estimated to cost $725,000 before
reimbursement. The study will be paid for with a 5-year bond issued by MCTHS and the bond costs will
be allocated to member towns according to annual enrollments as well as to the number of tuition
students. Minuteman may only move forward as long as no town votes against funding the feasibility
study
This article asks Town Meeting to approve borrowing to conduct the feasibility study In order to proceed,
the study must be approved by all member towns, and then the first payments would be due in FY2012.
At current enrollment levels, Lexington's share would total approximately $76,000 paid out in five
payments ranging from about $2,500 to $19,000 It is not anticipated that a request for permission to
proceed with the project implementation would be put forward by MCTHS before FY2013 MCTHS has
formed a project oversight committee to assist in defining and evaluating the study and, when the time
comes, to oversee the project. Member towns have been asked to provide citizens and staff Lexington
will be represented by Public Facilities Director Pat Goddard and Selectman Norman Cohen.
The Committee unanimously(8-0)recommends approval of this request.
Article 18: Appropriate for Post Funds Funding Committee
Requested Source Recommendation
Employment Benefits
$479,399 Free Cash Approve (8-0)
Retired Lexington employees receive two types of post-employment benefits a pension and health
insurance School teachers' pensions are paid by the State pension fund. All other Town employees
receive their pensions from the Lexington Retirement Trust Fund. Health benefits for all retirees,
including teachers, are funded through the Town's health plans. Annual appropriations to the pension
fund and to the health care trust fund, under the Shared Expenses portion of the operating budget (see the
discussion of Article 4 and its constituent elements, including Shared Expenses, in this Report) cover the
costs of these benefits for current retirees.
There is a future liability, in the case of both types of benefits, for current employees and for past
employees who have not yet reached retirement age. The annual appropriation for pensions, made to the
Lexington Retirement Trust Fund (line 2110 of the operating budget), includes an amount for the funding
of the future pension liability It does not, however, include any amount for the future health benefit
liability
As of FY2008, the Government Accounting Standards Board (GASB) Statement 45 (GASB-45) required
municipalities to determine and report the unfunded liability for retiree health benefits in the annual audit.
Based on a 30-year funding schedule,the Town's unfunded liability approximates $100 Million.
There is as yet no mandate that this future liability be funded. However, in preparation to do so, Town
Meeting had voted to request the Massachusetts General Court to pass special legislation to establish a
Page 38
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
trust fund for that purpose. The Trust Fund was established by Chapter 317 of the Massachusetts Acts and
Resolves of 2002
Starting in FY2009, the Town began to fund this liability, appropnating the sum of$400,000 to the trust
fund. In FY2010, $440,690 was appropnated by Town Meeting. This article requests that $479,399 be
appropriated in FY2011, bringing the total amount, including interest, set aside for this future liability to
approximately $1,324,000 This figure pales in comparison to the palpably astronomical $100,000,000
unfunded liability As a practical matter, however, until the Lexington retirement Trust Fund is fully
funded, now estimated to occur in 2015, larger sums are not available to be appropnated to this Post
Employment Insurance Liability Fund.
The funding for this appropnation is from Free Cash. Pnncipally, if not totally, the source of these funds
is the Federal Government, which partially reimburses the Town for the prescnption drug benefits it
provides retirees in place of Medicare Part D prescnption coverage. Under current law, this Federal
Government annual reimbursement will continue so long as the Town offers this prescnption drug benefit
to retirees.
The Committee unanimously(8-0)recommends approval of this request.
Article 19: Rescind Prior Borrowing Funds Funding Committee
Requested Source Recommendation
Authorizations
none n/a IP
This article will be indefinitely postponed because there are no known pnor borrowing authorizations that
need to be rescinded at this time
Article 20: Establish and Appropriate Funds Funding Committee
Requested Source Recommendation
to Specified Stabilization Funds
See below See below Approve (8-0)
This article requests Town Meeting to appropnate funds from developer payments and other sources, to
the extent available, into some or all of six specified stabilization funds.
The Specified Stabilization Funds
The state statute authonzmg towns to create and maintain a stabilization fund, G.L. c 40, section 5B,was
amended in 2003 to permit the creation of multiple, separate stabilization funds for specified purposes.
The creation of such funds, the specification of their purpose, any alteration of their purpose, and any
appropriation into or out of the funds, must be approved by a two-thirds vote of Town Meeting at an
annual or special town meeting. To supplement its general stabilization fund, which is addressed in
Article 30,Lexington has created several specified stabilization funds,which are described below
At the 2007 Annual Town Meeting, four specified stabilization funds were established to replace certain
pre-existing special revenue accounts. Monies in the special revenue accounts, funded by negotiated
payments from developers, had previously been spent without specific appropriation. In order to comply
with Massachusetts Depaitiuent of Revenue guidelines, and to make the existence and use of the funds
more transparent, monies in the special revenue accounts were transferred to the following specified
stabilization funds,where they are now subject to review and appropnation by Town Meeting:
• Transportation Demand Management/Public Transportation (TDM/PT) Stabilization Fund
Contains payments negotiated with developers to support the operations of Lexpress.
Page 39
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
• Traffic Mitigation (TM) Stabilization Fund Contains payments negotiated with developers to
support traffic mitigation projects, such as improvements to signals and pedestrian access at
intersections, including funds previously contained in the Avalon Bay TDM special revenue
account.
• School Bus Transportation Stabilization Fund Supports daily school bus operations, and was
ongmally funded with $200,000 contained in the Avalon Bay School Bus Transportation special
revenue account.
• Section 135 Zoning By-Law Stabilization Fund Created to finance public improvements using
monies contributed by developers pursuant to Section 135 of the Code of Lexington.
At the 2008 Annual Town Meeting, a Special Education Stabilization Fund was created to provide a
vehicle for setting aside reserves to help cover unexpected out-of-distract special education expenses that
exceed budget. A related goal was to create greater transparency around the out-of-distract special
education budget component by segregating this expense item and bringing budget overruns to Town
Meeting for its approval. The Special Education Stabilization Fund was funded in FY2009 with an initial
appropriation of$350,000 The ultimate goal is to build a $1,000,000 reserve to help buffer the regular
education budget from extraordinary and unforeseen increases in out-of-distract special education
expenses. Another$350,000 was added to the Fund by an appropnation at the spnng 2009 Annual Town
Meeting.
At the 2009 Annual Town Meeting the Center Improvement District Stabilization Fund was created and
was funded by a $100,000 payment received from the developer of Lexington Place in FY2010 The
funds may be used for projects such as tree planting, sidewalk improvements to the abutting connector
between the parking lot and the sidewalk. Decisions as to uses of the funds have not yet been made
Proposed Additions to Funds
The current balances of, the amounts of funds currently available for appropriation into, and the amounts
proposed to be withdrawn from,the respective stabilization funds (SF), are as follows
• TDM/PT SF Current balance is $216,361 The Town is expecting a payment of$50,000 from
Cubist Pharmaceuticals, Inc., and if it is received pnor to this Article being discussed at Town
Meeting, it will be included as an amount available for contribution. An appropnation of$83,000
from the Fund is requested under Article 4 to support the operations of Lexpress ($78,000) and
membership in the 128 Business Council($5,000)in FY2011
• TM SF Current balance is $284,235 There are amounts expected to be received from Patnot
Partners ($80,000 - $65,000 for traffic planning for the Spring Street and Hayden Avenue
comdors and $15,000 for a traffic calming study on Shade Street) and Cubist Pharmaceuticals
($25,000 for traffic planning for the Spnng Street and Hayden Avenue comdors) If these
amounts are received pnor to this Article being discussed at Town Meeting,they will be included
as available for contribution.
• School Bus Transportation SF Current balance is $4,599 No funds are available for
appropriation into the Fund. An appropriation of$4,587 is requested under Article 4 to support
school bus transportation.
• Section 135 Zoning SF Current balance is 0 No funds are available for appropnation into the
Fund.
• Special Education SF Current balance is $709,880 It is proposed that $350,000 of Free Cash be
appropriated into the Fund.
• Center Improvement Distnct SF Current balance is $100,285 No funds are available for
appropriation into the Fund.
The Committee unanimously(8-0) recommends approval of this request.
Page 40
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Article 21: Establish and Funds Funding Committee
Requested Source Recommendation
Appropriate to Debt Service
Stabilization Fund none n/a IP
It is our understanding that the motion under this article will be for indefinite postponement, i.e. there is
no plan to add to the Fund's balance, about $7,497,000 as of December 31, 2009, at this town meeting.
The Town Manager and Board of Selectmen have proposed the following strategy that pertains to the
Stabilization Fund. At press time, the FY2011 budget includes approximately $427,000 in assumed
revenue that is not committed to particular uses. If State aid to Lexington is reduced below the level
assumed in building the FY2011 budget, as indicated by leaders in the State legislature, the uncommitted
revenue will be reduced accordingly up to the full amount. State aid reductions beyond the full amount of
the uncommitted revenue will be covered (at this or a future town meeting depending on the timing) by
withdrawal via appropriation from the Stabilization Fund for use in the operating budget. The
Appropnation Committee concurs with this strategy
Article 22: Appropriate from Debt Funds Funding Committee
Requested Source Recommendation
Service Stabilization Fund
$124,057 DSSF Approve (8-0)
The 2009 Annual Town Meeting voted to establish a new specified stabilization fund under G.L. c 40
Section 5B called the Debt Service Stabilization Fund(DSSF) The purpose of the fund is to provide a
vehicle to allow the Town to invest bond proceeds beyond the one-year arbitrage limit that would
otherwise apply
An initial appropriation of $1,739,894 was approved at the 2009 Annual Town Meeting with funds
remaining from a set-aside in FY2007 when the monies were initially received. In August 2006,the Town
received reimbursement of approximately $14 million from the Massachusetts School Building Authonty
for construction projects completed at Clarke and Diamond Middle Schools and Lexington High School.
The funds were in excess of the amount necessary to repay a note that was due and were set aside as
reimbursement for the exempt costs of the High School project per a directive from the Massachusetts
Department of Revenue The balance is to be drawn down over the life of the bond related to the High
School construction project,payable through 2023
This article requests that $124,057 be appropriated from the Debt Service Stabilization Fund to offset the
debt service in fiscal year 2011 for this same High School construction project.
The Committee unanimously(8-0)recommends annroval of this request.
Article 23: Appropriate for Prior Funds Funding Committee
Requested Source Recommendation
Years' Unpaid Bills
none n/a IP
This article will be indefinitely postponed because no unpaid bills from pnor years for which no funds
were encumbered have been identified.
Page 41
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Article 24: Amend FY2010 Operating Funds Funding Committee
Requested Source Recommendation
Budget
unknown unknown Pending
This article is pending. Town staff have not identified any concrete need to amend the current year budget
as of press time, but the article will not be acted upon until close to the end of this Town Meeting in case
some need for emendation anses.
Article 25: Appropriate for Funds Funding Committee
Requested Source Recommendation
Authorized Capital Improvements
none n/a IP
As of press time,we know of no need for action under this article.
Article 26: Amend Bylaw — Length of Funds Funding Committee
Requested Source Recommendation
Contracts
none n/a Approve (8-0)
This article would amend Chapter 32, § 32-4, of the Code of the Town of Lexington regarding limits on
the lengths of contracts specific to community television services. Currently there is a five-year limit on
community television services contracts. This article, which was submitted per the request of the
Communication Advisory Committee, would permit contracts for community television services to
extend to as long as ten years. If Town Meeting approves this article, the Town intends to sign with the
selected access provider a 10 year contract - consisting of an initial three-year term, followed by a three-
year extension and then a final four-year extension.
The extended contract length would bnng Lexington's practices in line with other nearby communities
(see the table below) and it would lessen the frequency with which resources are devoted to the RFP
process. It would also allow the access provider to undertake longer term initiatives.
Town Length of Contract with Community
Television Provider
Arlington 10 yrs (renewal at yrs three and six yrs)
Bedford 5 yrs
Burlington 4 yrs
Cambridge 10 yrs (five yrs with five yr renewal)
Concord/Carlisle 10 yrs
Medford 10 yrs
Somerville 10 yrs
Stoneham 10 yrs
Waltham 10 yrs
Sozrrce LexMedia
The Committee unanimously(8-0)recommends approval of this request.
Page 42
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Article 28: Amend Bylaw — Town Funds Funding Committee
Requested Source Recommendation
Meeting Procedure
none n/a Disapprove(0-8)
The motion under Article 28 seeks to streamline Town Meeting procedure by changing when a notice of
reconsideration may be made. This is not a financial article and we would normally not comment on it,
but we were asked to do so as the process that is proposed to be changed is routinely used by the finance
committees.
Reconsideration is a parliamentary procedure which allows a motion that has been decided by Town
Meeting to be revisited. This process is typically used for financial articles to make sure that the budget is
balanced at the conclusion of Town Meeting. Members of the Appropriation Committee routinely nse to
serve notice of reconsideration on completed financial articles, so the need for a change in this by-law is
not urgent. However, we applaud the aim to streamline the process and reduce interruptions arising from
these notices.
In reflecting on the value of allowing a notice of reconsideration to be delayed to a later session of Town
Meeting, the Committee notes that a motion to adjourn the meeting at the end of a night is sometimes
greeted with great enthusiasm and can be passed before notice of reconsideration can be issued for other
motions that were completed late in the evening. We also note that sometimes reflection on the
consequences of a motion a day or two after it has been decided can create legitimate misgivings. As a
result, the Committee supported the proposed amendment to the bylaw as it appeared on the blue motion
sheets provided to Town Meeting on Monday, March 22
The motion that is to be brought to the floor of Town Meeting, however, changes the threshold for
reconsideration from a simple majority to a super majonty of 2/3 when notice is delayed. The Committee
believes that this change in threshold is unnecessary, that the current majority vote requirement is
adequate for detemng fnvolous attempts at reconsideration. Further, this change in threshold for delayed
notices of reconsideration defeats the stated aim of the motion as the finance committees should be
expected to continue to issue timely notices of reconsideration to avoid difficulty in meeting the higher
threshold specified in this motion. Finally we note that the effect of changing procedural rules can be
subtle and we would like to see a deeper investigation of this change and how it interacts with other rules
for reopening articles conducted by a broader cross section of affected committees and Town Meeting.
The Committee unanimously(0-8) recommends disapproval of this article.
Article 30: Establish Qualifications Funds Funding Committee
Requested Source Recommendation
for Tax Deferrals
none n/a Approve (8-0)
This article seeks to raise the income threshold for participation by seniors in the Town's 41A tax deferral
program from$50,000 to $51,000 The change is authonzed by recently enacted home rule legislation for
which the Town petitioned in 2007
Background
In early 2004,the Board of Selectmen created an ad hoc Tax Deferral and Exemption Study Committee to
explore ways in which the property tax relief available to senior citizens and other needy residents could
be enhanced and made more accessible. Since then, Town Meeting has taken a succession of steps to
Page 43
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
expand such relief, for the most part maximizing the options that the Town is allowed to adopt under
existing State law The principal programs now available to Lexington homeowners are
• a tax exemption program, under which homeowners age 65 or over with limited income and
limited assets other than the value of their home may deduct $1,000 from their annual property
tax, G.L. c 59, § 5, cl. 41C ("the 41C Program"),
• a Community Preservation Act surcharge exemption program, under which low-to-moderate
income homeowners age 60 or over, and low-income homeowners under age 60, may obtain a
100%exemption from the CPA surcharge on their property tax,
• a locally-controlled Senior Service program, adopted by Town Meeting in 2006 to replace the
preexisting state program, under which low-income seniors may perform volunteer work for the
Town in exchange for a reduction in their property tax, currently up to a maximum credit of
$935or a maximum credit of$1,190 for a two person household,
• an exclusively State-run program called the `Circuit Breaker program under which low- and
moderate-income homeowners age 65 and over, whose homes have an assessed valuation not
greater than a specified ceiling ($788,000 for tax year 2009), may obtain a tax credit on their state
tax returns (up to $960 for tax year 2009) for the amount that their property tax, plus half their
annual water and sewer bill, exceeds 10% of their annual income, G.L. c 62, § 6(k), and
• a tax deferral program, under which homeowners age 65 or over with a household income of not
more than $50,000 may defer any or all of their property tax due, after applying any available
exemptions, up to half the value of their house, at an interest rate equal to the Town's cost of
funds ( 68% for FY2010 deferrals), until the house is sold or transferred, G.L. c 59, § 5, cl. 41A
("the 41A Program")
The 41A Deferral Program
The 41A deferral program, although it has not been widely used, is an important tool in the tax-relief
toolbox because it offers immediate and substantial property tax relief to cash-strapped seniors. Those
who qualify may defer any part or all of their property tax for a given year,until the property is ultimately
disposed of, at an interest rate that is now quite reasonable The interest rate, formerly pegged at 8%, is
now based on a floating Treasury rate equivalent to Lexington's cost of funds in the year of deferral, but
not to exceed 8%,which remains in effect for the life of each year's deferral. The interest rate for FY2008
deferrals was 4 77%, for FY2009 deferrals was 1 66%, for FY2010 deferrals was 0 68%, and for FY2011
deferrals will be just 0.34%.
At the same time, the 41A deferral program is an attractive form of tax relief from the Town's point of
view because it is essentially revenue-neutral. While the unlikely event of a significant increase in the
number of participants in any particular year could potentially create a short-term cash flow problem, the
Town is in effect making well-secured loans. The Town should eventually be repaid all the funds that are
deferred with interest, and over time an equilibrium should be reached under which as many deferral
agreements are repaid as are entered into
The Home Rule Amendment
In 2007, Town Meeting approved a citizen's article calling for a petition to the State legislature to enact a
home rule amendment to 41A that would allow the Town to expand eligibility beyond that permitted
under the existing state law The special act, signed into law on July 22, 2008, permits the Town, by vote
of Town Meeting and with the approval of the selectmen, to set its own income limit for deferrals, to
Page 44
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
lower the age limit(which would otherwise be 65 years of age), and to condition eligibility for deferral by
those under 65 on objective cntena of hardship or disability 5
Proposed Increase in Income Threshold
Last year, Town Meeting approved an increase in the income limit for deferrals from$40,000 to $50,000
This year the Tax Deferral and Exemption Study Committee (TDESC) has recommended that the Town
increase the income threshold for the 41A deferral program from $50,000 to $51,000, an income level
consistent with the state Circuit Breaker limit.
Although the number of households eligible to defer property taxes is now substantial (approximately
1,350) and might increase slightly with this change, it is unlikely that the proposal will result in a large
number of additional deferrals or have any matenal impact on the Town's finances. Utilization of the
program has traditionally been very low because senior citizens who have paid off their mortgages have
traditionally been reluctant to place a new lien on their home and accumulate debt, or to reduce the value
of an asset that can be passed on to their heirs. After the increase approved by the 2009 Annual Town
Meeting which made approximately 180 additional households eligible for the program, utilization levels
remained fairly constant. When the interest rate for 41A deferrals was changed several years ago from 8%
to a lower, floating rate based on Lexington's cost of funds, participation increased somewhat, but not
substantially, as shown in the table below
Fiscal Year Interest Rate Number of Deferrals Amount Deferred
2002 8 00% 24 $99,582
2003 8 00% 21 $80,459
2004 8 00% 23 $80,459
2005 8 00% 16 $75,000
2006 8 00% 16 $74,000
2007 4 77% 15 $73,578
2008 4.92% 20 $101,832
2009 1 66% 26 $154,380
2010 0 68% 276 not vet available
2011 0.34%
The Committee unanimously(8-0) recommends approval of this request.
Article 31: Support and Petition Funds Funding Committee
Requested Source Recommendation
for Municipal Utility Act
none n/a Approve (8-0)
The 2005 Annual Town Meeting approved, in Article 14, the submission of a home rule petition to the
state legislature that would enable the Town to establish a municipal utility company Because that home
rule petition was not acted on dunng the legislature's following two-year session, the 2008 Annual Town
Meeting, in Article 44, voted to reaffirm the petition as a prerequisite to its continued consideration. At
Prior to 2008,the highest income threshold towns could adopt under the 41A program was$40 000 In 2008,the
legislature amended Clause 41A generally to permit towns to adopt an income limit equal to the Circuit Breaker
threshold for an individual. That threshold was$49 000 for tax year 2008 and will be$51 000 for tax year 2009
6 27 residents have applied for the program as of February 2010 Residents may apply for the program until three
months after the final(generally the third quarter)tax bill is mailed.
Page 45
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
the 2009 Annual Town Meeting Article 38 called for Town Meeting once again to reaffirm its desire for a
home rule petition, as well as to support related bills working their way through both houses that would
enable any municipality state-wide to establish a municipal utility company This year's article seeks to
provide similar support. The Appropnation Committee supported the above articles and continues its
support of legislation that would give the Town the option to create a municipal utility
The Committee unanimously(8-0) recommends approval of this request.
Article 36: Resolution on Munroe Funds Funding Committee
Requested Source Recommendation
School
none n/a Disapprove(0-7-1)
In early March, the Committee discussed the motion to be presented under this article as drafted at that
time (hereafter the "motion") That draft consisted of two parts concerning the disposition of the former
Munroe School building and land. The first part was entitled `Terms of Request for Proposal ("RFP")'
and the second was entitled `Terms of Agreement'
Committee members expressed support for the idea that ample time needs to be made available for Town
Meeting representatives and citizens to become informed in regard to all aspects of any proposed sale of
Town property and to be able to express their opinions on the sale or other action in connection with the
long-term disposition of Town property It was generally agreed that the process last fall was far from
ideal in these respects.
Committee members also support fuller exploration of the range of possible arrangements, such as leases.
However, a number of objections were raised to the motion under discussion. In the opinions of some
members, the motion is mappropnately focused on a presumptive RFP stage of the process, and
furthermore, appears to aim to limit the possible decisions to come out of future discussions about the
disposition of the former Munroe School property Under Item 1(a) any RFP in connection with the
property must allow for either purchase or lease (the intent that both possibilities be allowed for in any
RFP is a bit ambiguous in the present wording) Item 2 states "The RFP shall contain no restrictions or
preference as to the future use of the property" Such limitations could be problematic when it comes to
giving guidance to proposers with regard to the Town's real preferences including the preferences of the
Board of Selectmen. In regard to process, there has not been adequate discussion of the issue to allow
proper decisions on limitations of the decisions to be made at present. In our view, it is preferable to allow
for a fully free exploration and discussion of the possibilities followed by consensus building on the best
course of action. Such a course could but doesn't necessanly involve the issuance of another RFP
The Committee by a vote of (0-7-1) recommends disapproval of the motion as drafted in early
March.
Note we have received late notice that the motion may be revised. In that case, we will reconsider our
position.
Page 46
APPROPRIATION COMMITTEE REPORT TO 2010 ATM—MARCH 2010
Appendix A
Summary of Financial Actions at the November 2009 Special Town Meeting
Please see the Committee's "Report to the November 9, 2009 Special Town Meeting" for background
information on the actions taken(this report and others are available at http.//www.lexmgtontmma.org/or
at http.//www.lexmgtonma.gov/towngovernment/2009fallstm.cfiu)
Article 6 An increase of 0 75% in the meals tax was approved effective January 1, 2010 Lexington will
receive the revenue from this increase.
Article 7 An increase of 2% in the room occupancy tax was approved effective July 1, 2010 Lexington
will receive the revenue from this increase
Article 10 The amount of $35,000 received from a developer for traffic mitigation purposes was
appropriated into the Traffic Mitigation Stabilization Fund in accordance with Department of Revenue
regulations.
Article 11 The amount of $669,843, representing the net change in projected revenues relative to
appropriations from the time of the Annual Town Meeting to the fall, was appropnated into the
Stabilization Fund.
Article 12 The amount of, $25,000 was appropnated from the Traffic Mitigation Stabilization Fund for
use in the design of a pedestnan crossing on Waltham St.
Article 13 The actions included changes in various line items in the FY2010 operating budget shown in
the table below that net out to a decrease of$8,274
Approved Changes to the FY2010 Operating Budget
Line Item Program From To
2150 Worker's Compensation $351,625 $401,625
3100-3500 DPW Expenses $4,732,743 $4,747,743
6100-6200 Social Services Personal Services $409,285 $294,840
6100-6200 Social Services Expenses $171,578 $121,749
8400 Finance Expenses $301,328 $342,328
8500 Town Clerk Personal Services $269,513 $291,413
8500 Town Clerk Expenses $84,000 $112,100
Article 14 The Water Enterpnse Fund operating budget was changed from $6,711,570 to $6,594,121
because the estimate of the MWRA water assessment was changed from$4,600,000 to the final figure of
$4,482,551 The Sewer Enterpnse Fund operating budget was changed from $7,729,170 to $7,475,116
because the estimate of the MWRA sewage assessment was changed from $6,500,000 to the final figure
of$6,245,946
Page 47