HomeMy WebLinkAbout2020-02-10-CONCOM-min 1
Ov5 MOROVI"
Off` OP
aw PUBLIC MEETING MINUTES
APRIL 19- Conservation Commission
Meering broadcasted by LexMedia
AGENDA Monday, February 101h, 2020 6:30 p.m., Parker Room, Town Office Building,
1625 Massachusetts Avenue 02421
Commissioners Present: Phil Hamilton, Duke Bitsko, Kevin Beuttell, Alex Dohan, Ruth Ladd
and Holly Samuels
Staff Present: Karen Mullins, Conservation Director and Katie Luczai, Dept. Assistant
6:30 pm
New Business/Pendine Matters
Request for Certificate of Compliance: 2 Diana Lane (formerly 0 Diana Ln) DEP 201-1104 BL
1062
The request for certificate of compliance for 2 Diana Lane is not ready.
Request to Extend an Order of Conditions: Rangeway Extension DEP 201-968 BL 926 (from
2/15/2020 until 2/15/2021)
On a motion by Ms. Dohan and seconded by Ms. Ladd, the Commission voted 6-0 to extend the
order of conditions by one year.
Request for Plan Modification: 288 Concord Avenue DEP 201-1045 BL 1002
Mr. Dave Crossman, wetland scientist for the project presented before the Commission. The
applicant had removed four large trees on the property. The applicant proposes to plant four
native trees to replace those that were removed.
On a motion by Ms. Samuels and seconded by Ms. Ladd, the Commission voted 6-0 to approve
the plan modification pending receipt of tree species details.
Ratify Enforcement Order: 39 Woodpark Circle
On a motion by Ms. Dohan and seconded by Mr. Beuttell, the Commission voted 6-0 to ratify the
enforcement order.
Approve Minutes: 1/13/2020 and 1/27/2020
2
Minutes will be voted on at the following meeting.
Site Visit Schedule for 2/24/2020 Meeting
The Commission will not be conducting formal site visits for filings for the 2/24/20 meeting and
instead will be walking the GCC proposed trail.
7:00 pm
New Public Meetings/Hearings
ViewPoint Cloud Permit 4CDOA-20-4
Request for Determination of Applicability, Adams Street Right of Way from Burlington Town
Line to North Street intersection
Applicant: Town of Burlington
Project: Installation of water main
Submitted Information:
- MassDEP Determination of Applicability Application with associated attachments,
prepared Town of Burlington Engineering Division
- Plans, "Adams Street Water Main", prepared by the Town of Burlington, signed and
stamped by Stephen J. Hildreth, PE455344, dated January 8, 2020
- Engineering Memorandum, "0 Adams St RDA Comments", to Karen Mullins, from
Michael Sprague, dated February 6, 2020
Mr. Tom Hayes, Mr. Steve Hildreth, project engineers and Assistant Town Administrator, Mr.
John Unesio, with the Town of Burlington presented before the Commission. The applicants are
proposing to install a water main stretching from the Adams Street right of way in Burlington to
the intersection at North Street in Lexington which is within the 100 foot buffer zone of a
bordering vegetated wetland. All the work will be completed within the existing roadway. No
new fill will be brought in.
On a motion by Mr. Beuttell and seconded by Ms. Dohan, the Commission voted 6-0 to issue a
negative determination with conditions.
ViewPoint Cloud Permit 4CDOA-20-5
Request for Determination of Applicability, 33 Drummer Boy Way
Applicant: Drummer Boy Homes Association
Project: Installation of EV charging stations and associated activities
Submitted Information:
Chairman Phil Hamilton recused himself from the filing for 33 Drummer Boy Way. Mr. Bitsko
was appointed as Chairperson for the hearing.
Ms. Marsha Good presented before the Commission. The applicant is proposing to install
electrical vehicle charging stations in the parking lot which is outside of the 100 foot buffer zone
of a bordering vegetated wetland. They will be installing three concrete pads and a light pole.
3
Concerns of the Commission:
• The applicant needs to submit a revised plan showing the light pole.
• The Commission is not confirming any wetland delineation.
Responses of the Applicant:
• The applicant will submit the revised plan.
On a motion by Mr. Beuttell and seconded by Ms. Dohan, the Commission voted 5-0 to issue a
negative determination with conditions.
Chairman Hamilton re joined the Commission.
7:11pm
ViewPoint Cloud Permit 4CNOI-20-1
DEP 201-1171
Notice of Intent, 45 Fouler Avenue
Applicant: Marina and Igor Balk
Project: Raze and rebuild of a garage
Submitted Information:
- MassDEP Notice of Intent Application, prepared by Stamski and McNary, Inc., dated
January 2, 2020
- Plans, "Wetland Permitting Plan", prepared by Stamski and McCary, Inc., signed and
stamped by Joseph March, PLS and George D'Makarakos, PE, dated January 2, 2020
- Stormwater Narrative/Drainage Calculations, prepared by Stamski and McCary, Inc.,
dated January 2, 2020
Mr. Paul Kirchner, engineer with Stamski and McNary presented before the Commission. The
applicant is proposing to demolish an existing single car garage and construct a two car garage
within the 100 foot buffer zone of a bordering vegetated wetland and 200 foot riverfront area.
The driveway will be expanded and cause an increase in impervious surface area. A drip edge is
proposed along the east side of the garage. The applicant is going before the Zoning Board of
Appeals to get approval for the front yard setback.
Concerns of the Commission:
• The test pit locations have been conducted on an adjacent lot considerable distance from
the proposed garage and several years ago.. Can the applicant conduct test pits on the
property at large in order to understand at what elevation the seasonal high ground water
is?
• The applicant is encroaching onto the Town of Arlington's land. Permanent markers and
signage should be installed to show the property line which indicates where the abutting
conservation area begins. The markers and signage will be added to the Order of
Conditions as a condition.
• Will any trees have to be removed? Is anything proposed to replace the vegetation?
• The engineering calculations need to be revised because they inaccurately take into
account pre- and post-development conditions.
4
Responses of the Applicant:
• The applicant will conduct additional test pits.
• The applicant will be removing a Japanese maple tree as well as shrubs. A planting plan
will be submitted.
• The engineering calculations will be revised.
On a motion by Ms. Samuels and seconded by Mr. Beuttell, the Commission voted 6-0 to
continue the hearing until February 24, 2020 at the applicant's request.
ViewPoint Could Permit 4AOOC-20-3
DEP 201-1155
Request to Amend Order of Conditions, 453 Concord Avenue
Applicant: Cotting School
Project: Driveway and walkway access modifications
Submitted Information:
On a motion by Mr. Beuttell and seconded by Ms. Ladd, the Commission voted 6-0 to continue
the hearing until February 24, 2020 at the applicant's request.
Continued Public Meetings/Hearings
ViewPoint Cloud Permit 4CORD-19-2
DEP 201-X
Abbreviated Notice of Resource Area, 1050 Waltham Street
Applicant: BH GRP 1050 Waltham Owner LLC c/o Greatland Realty Partners
Project: Confirmation of resource area delineation
Additional Information:
- Revised Plans, "1050 Waltham Street Planned Development District PD-5", prepared by
VHB, signed and stamped by Nicholas J. Skoly PE 52677, dated February 10, 2020
- Plans, "Regulatory Plans Sketch Plan Submission", prepared by VHB, dated February 5,
2020
Nick Skoly, project engineer presented before the Commission. Mr. Olsen, the project wetland
scientist conducted additional tests and revised the wetland delineation accordingly, which
expands the wetland delineation further into the property. The applicant presented their informal
plans for the proposed building but will be coming before the Commission in the future with a
Notice of Intent for the structures.
On a motion by Mr. Beuttell and seconded by Ms. Dohan, the Commission voted 6-0 to continue
the hearing until February 24, 2020 at the applicant's request while they wait to obtain a DEP
filing number.
ViewPoint Cloud Permit 4AOOC-20-1
DEP 1042
Amendment to Order of Conditions, 7 Crosby Road
5
Hastings School
Applicant: Ameresco, Inc. o/b/o Town of Lexington
Project: Installation of solar carport
On a motion by Ms. Ladd and seconded by Mr. Beuttell, the Commission voted 6-0 to continue
the hearing until February 24, 2020 at the applicant's request.
ViewPoint Cloud Permit 4AOOC-20-2
DEP 201-1082
Amendment to Order of Conditions, 20 Pelham Road
Lexington Children's Place
Applicant: Ameresco, Inc. o/b/o Town of Lexington
Project: Installation of solar carport
On a motion by Ms. Samuels and seconded by Ms. Dohan, the Commission voted 6-0 to
continue the hearing until February 24, 2020 at the applicant's request.
DEP 1154 BL 1109
ViewPoint Cloud 4CNOI-19-16
NOI, 4 Tidd Circle
Applicant: Maliha Karim
Project: Landscaping and construction of a retaining wall at a single family dwelling
On a motion by Mr. Beuttell and seconded by Ms. Ladd, the Commission voted 6-0 to continue
the hearing until March 9, 2020 at the applicant's request.
ViewPoint Cloud Permit 4CNOI-19-32
DEP 201-1170
NOI, 72 Kendall Road
Applicant: Denny Zheng
Project: Addition to a single family dwelling
Submitted Information:
- Revised Plan, "Site Plan for 72 Kendall Road", prepared by Hardy+Man Design Group,
PC, dated January 31, 2020
Mr. Lane Goldberg, attorney and Mr. Chi Man, engineer presented before the Commission. The
applicant has revised the wetland delineation and the project plans. The wetland has been
delineated to be significantly closer to the existing dwelling. The applicant has scaled back from
prosing two addition to only expanding vertically over the existing dwelling footprint. There will
be no excavation. There may be an additional footing constructed in the basement of the
dwelling. There will be no increase in impervious surface area. There will be no expansion of the
driveway. Six signs notating the conservation and protected resource areas will be installed.
Concerns of the Commission:
6
• In the past the Commission has been reluctant to allow continued mowing of wetland that
is treated as lawn area but since the revised wetland delineation has shortened the lawn
area they are willing to allow future mowing.
• The Commission would like an isolated infestation of oriental Bittersweet (Celastrus
orbiculatus) removed from the North side of the dwelling within the managed yard area
of the property.
Responses of the Applicant:
• The applicant agreed to the proposed conditions.
On a motion by Ms. Dohan and seconded by Mr. Beuttell, the Commission voted 6-0 to close the
hearing.
8:02pm
DEP 201-1137 BL 1094
NOI, 127 North Street
Applicant: Ying Chen and Katherine Van Stry o/b/o Bull Realty, LLC
Project: Raze and rebuild of a single family dwelling
Submitted Information:
- Revised Stormwater Management Report/Engineering Drainage Calculations, prepared
by Gala Simon Associates, Inc., date revised January 21, 2020
- Revised Plans, "Drainage/Grading Plan Existing and Proposed Conditions", prepared by
Gala Simon Associates, January 18, 2020
- Engineering Memorandum, "127 North St NOI Engineering Comments 3", to Michael
Sprague, to Karen Mullins, dated January 24, 2020
- Retaining Wall Plan Details, "Retaining Wall for Driveway", dated February 11, 2020
Mr. Rich Kirby, wetland scientists from LEC Environmental and Mr. Al Gala, project engineer
presented before the Commission. The project has now been approved by the Zoning Board of
Appeals. The dwelling is now closer to the delineated wetlands and is proposed to be a smaller
size. The driveway has decreased in size and will be comprised of pervious pavers.
Concerns of the Commission:
• At the point of contact from the porous asphalt to the segmental retaining wall, should
there be additional drainage functions installed to help keep the water circulating?
• Will any additional trees proposed to be removed?
Responses of the Applicant:
• The applicant can install a poly sheet and detailing to ensure successful drainage.
• Only the originally proposed five trees are to be removed.
On a motion by Ms. Dohan and seconded by Mr. Beutell, the Commission voted 6-0 to close the
hearing.
7
On a motion by Ms. Dohan and seconded by Ms. Ladd, the Commission voted 6-0 to adjourn the
meeting.
8:15pm