Loading...
HomeMy WebLinkAbout2782 Memorandum, J. Lawrence Carney to Building Committee of the Lexington High School, concerning work to be done on the grounds, October 18, 1902 Boston, Oct. 18, 1902. 'i'o the Buildin_!- Comuittee of the Lexington_ High School. Gentlemen: - Confiz�ing the understanding reached with your Committee at its meeting last evening, I beg to say that for the sure of three hundred dollars (%;;300) in addition_ to the twelve hundred dollars (�' )1200) specified in my existing grading and planting contract with the town_, I will waive all claims for extra work already done in connection_ with the job , and all claims for extra compensation_ based upon errors in the locating of the grade stakes , and will also do the following extra work: (1) Convert the octagonal shaped turning-places in th e ,driveways at the ends of the building into circular or oblong turning-places; to this end enlarging and shaping them substan- tially in accordance with the outline traced on the ground yester- day in the presence of the Architect, 111r. Clapp and myself. If, In order to Make the proper en_la�rger ent of the turning-place at the southeasterly end of the building , it is necessary to put in additional filling on the outer edge of the driveway or turning- Cm,I will do so. (2) Grade , properly dress with loam, and seed: down the space between the edge of the sidewalk and the edge of the travelled way across the front of the school-house lot; including in this work one row of sods placed next to the sidewalk s edge . (3) Raise the surface of the grade in the central front portion of the lot , so that the finished surface , instead of slight- ly descending from the edge of the sidewalk toward the school-Douse, shall gently rise; it being understood that the Architects stake now set about twelve feet from the sidewalk shall be raised so as to call for a finished grade about four and one-half inches higher than at present. The necessary amount of good loam to produce this rise in grade shall be furnished and spread by myself. In correcting inequalities and raising low places found by the Architect in the portions of the graded work that are already substantially finished, and generally in completing the job , I am to conform to what shall be pointed out or_ the ground by !,.,Ir. Coop- er as the true grade lines, rather than to the stakes heretofore set by Peirce & Barnes. The rear portion_ of the lot , and the ends , are to be treated as required by stir. Cooper, and in other respects the job is to be completed in accordance with the require- ments of the existing contract and specifications. The above mentioned three hundred dollars covers also the work which I have done in building a new dry well , and connecting the same with the foot of conductor pipe. For this I was to re- ceive twenty-five dollars (�25) ; but this is now included in the above three hundred. dollars. It is understood, finally , that I ais not to be required to i extend the macadam driveway further` than the edge of the sidewalk. Respectfully subb itted, 7r-� The foregoing is correct and accepted. Chairman_ ) Building Committee. Secretary ) ZZ