HomeMy WebLinkAbout2774 Report, H.P. Cummings Company to High School House Building Committee, July 22, 1902 iggigil M LEXINGTOTT HIGH SCHOOL BUILDING, LEXINGTON, TIJASS. 7-oston, July 22, 1902. Alteration 174t). 2 Adding ( see detail below) $4,774. 50 Amount of Contract of Oct. 231 1901 ) as -110dified by Alteration No. 1, dated Jan. 12;'11 10029 4(31308. 60 Amount of Additions, 11�X, 774. 50 Amount of Contract as modified hereby , 51,083. 10 For extra excavations and. stonework in fotm-dations, made necessary in going to sound, hard bottom.,add 767.00 For changes in connection with side entrances and coal pocket under front- steps , shown, by details Nos. 26 , 28, 31 , 33 and 38, 50. 00 For changes in brickwork, depth of basement, addition- al iron beams, etc. , due to chap-ging froz grav- ity to combination heatinr, system, shown by details "Tos. 269 27 , 34� 35 and Q37Y 20-7. 00 For engine and ptmD foundations 40. 00 For oxtra depth of coal pocket 17. 00 For additional iron beams over coal- pocket 15. 00 For changes in overhead lights, 3rd floor, substituting two large for three small ceiling lights , and PuI-.tin[-; in I-IlIxee addition-al copper skylig-Tits 345. 60 For fixtures in Physic,-3.1 zaurid Chemical Laboratories as shown by detail 7o . 49 , and for the plumbing -_--ind &.18 fittilig in connection with same, ar-d for Lec- ture room, includirr, also 11� rdware ng and painti 11603. go a For sanding all OUTtside wood finish 35. 00 For plastering the ceilings of basement on wood lath 2420. 00 For additional electric outlets 35. 20 For changing doors to fresh air rooms in accordance with directions of State inspectors 72. 00 For cutting for an additional door in brick wall be- hind boilers and bricking up Jambs, 15. 00 For changes in stairs, and for extra partitions, doors, plastering, granolithic floors , etc. , in connee- tion. with finishing the east and west ends of base- ment corridor, as shown_ by detail ',No. 48 , and for sheathing the back of said partitions with yellow pine sheathing $11127. 20 For building rising platforms in Lecture Room, as silown. by detail No. 50 134.60 $4t774. 50 The foregoing changes are hereby approved as represented and described, and this day ordered to be attached to the contract. All claims for extension of time within which to complete the building, based upon alterations , changes and additions already ordered (including those embraced herein) are hereby adjusted amd agreed to as entitling the contractor to twenty-two days, and only twenty-two days. beyond August 15, 19029 i. e. to Sept. 6. 1902; it being the intent hereof to provide that all parts of the work heretofore and now respectively contracted for shall be completed, not later than said sixth day of September, and that the fifty dollars ($60) per day liquidated dwwages stipulated in the inain contract shall accrue as to each and every day, if any, beyond September 6, on which eiV of said work shall remain uncom- pleted. As a part of this provision as to extension of time, it is mutually agreed that the deliveries of kiln-dried finish shall be withheld until Thursday, J,%.Ily 31st current, and that the work of putting such finish in place (to be suspended until then) may be begun on Said Thursday and prosecuted without interruption thereafter. In case the Architects or Committee should order any further suspension of the work, the Contractor shall be entitled to an extension of time beyond said sixth day of September, for such nimber of days as the Architects hall Mudge ax?d certify to be reasonable. The Contractor hereby acknowledges the receipt of the speci- fications and drawings representing and describing the above men- tioned alterations, charges and additions. 11. P. CUM NGS COMPARY. B� Ua HIGH SCHOOL HOUSE BUILDING COMITTEE. By Cha i ~man. ` Seci-e taxy. It is mutually underc tool and agreed that the s}bove al terat torx nc?J�r No. S doesno; include extra items of 4U. fear plastering the. tiles►ator welZ_s an of $1.25 per foot :for basement trenches, nor deduction items of $85. for cesspool (and §50 . foil two 50 feet drains. No work connect— ed with the above items shall constitute a claJ.rs for additional time for comolet my the bui.ldi no, beyond Se )t ember 6th, 1902.