Loading...
HomeMy WebLinkAbout2026-11-09-SBC-STM1-rpt IIS E0EIWIC; LEXINGTON 6:52 airn,Nov 033 2026 S C II II 0 (D I.- S TOWN C''11.1 RIIK L.E X 11 N G TO N N11 A November 2, 2026 Dear Town Meeting Members: On behalf of the School Building Committee (SBC), I am pleased to share an update on the Lexington High School project. After an eight-year planning journey, Lexington residents said "yes" to a new high school. On December 8, 2025, approximately 62% of voters approved the debt exclusion for the $659.7 million project and endorsed the Bloom design, clearing the way for a building designed around the needs of our students. Then, in October 2026, the project reached another major milestone- the Massachusetts Department of Environmental Protection (DEP) issued its Superseding Order of Conditions, allowing full construction to begin. The project remains on track for substantial completion in mid-July 2029, with a September 2029 move-in date being planned. PROJECT TIMELINE The project is now advancing on two fronts at once- the design team is completing detailed design while construction is underway on site. This overlap is possible because the project uses the Construction Manager at Risk (CM at Risk) delivery method, which allows construction to start before every construction document is finalized. Production piling, the operational phase of installing deep foundational elements, is underway. Because the DEP permitting process took longer than anticipated, the project team is also exploring controlled blasting as a way to recover lost time and protect the schedule. Key upcoming milestones: • Nov. 2026: Production piling begins • May 2027: 90% construction documents submitted to the MSBA • July 2027: 100% construction documents submitted to the MSBA • Mid-July 2029: Substantial completion • September 2029: Students and staff move into the new high school RECENT SCHOOL BUILDING COMMITTEE ACTIONS September 2026 — The SBC debriefed the DEP site walkthrough and voted to keep the existing concrete slab and banking for the Field House track. Avoiding the cost of a new slab frees up funds to strip the old track surface down to the concrete, abate and repair the existing flooring, and install new flooring throughout. October 2026 —The SBC reviewed construction progress, DEP updates, and project finances. Members also reviewed approved building materials that are free of Red List chemicals; these selections are not expected to affect the overall project budget. The Committee continues to review project expenditures monthly as part of its ongoing financial oversight. Agendas, minutes, presentations, and recordings for all SBC meetings are available on the School Building Committee meeting page. MSBA MODULES, MILESTONES & MEETINGS The Massachusetts School Building Authority (MSBA) guides every project it funds through nine modules, from eligibility through post-occupancy evaluation. Lexington High School is currently in Modules 6 (Detailed Design) and 7 (Construction). These phases usually happen one after the other. Because the project uses the Construction Manager at Risk (CM at Risk) delivery method, detailed design and construction are moving forward at the same time. Module 6 — Detailed Design The District and its Project Team are completing detailed design and preparing construction documents while construction moves forward on site. The project is on track to submit 90% construction documents to the MSBA in May 2027 and 100% construction documents in July 2027. All design, documentation, and scheduling work follows the scope, budget, and schedule set in the Project Funding Agreement. Module 7 — Construction With the DEP's Superseding Order of Conditions in hand, construction is now underway. The Project Team is coordinating day-to-day construction with the ongoing design work to keep the project on schedule and within the scope and budget of the Project Funding Agreement. The MSBA monitors progress throughout to confirm the project stays on track. LOOKING AHEAD Module 6 ® Comleting the Pro ect With the DEP's Superseding Order of Conditions in hand, construction is now underway. The Project Team is coordinating day-to-day construction with the ongoing design work to keep the project on schedule and within the scope and budget of the Project Funding Agreement. The MSBA monitors progress throughout to confirm the project stays on track. Module 9 — Post Occu2222y Evaluation 2 After the building has been occupied for at least three years, MSBA staff collect data on how the building and site are performing. These findings are shared to help school districts, architects, and builders design better schools in the future. LHS PROJECT RESOURCES The SBC meets once a month, typically on the third Monday at noon. Community members are welcome to provide input at every meeting. Agendas, meeting minutes, video recordings, reports, and presentations are available on our website. For more information about the project, please visit the Lexington H h School Building Project website. Additional resources include: • LHS Project Website • LFiS Project FAQs • LHS Virtual Flyover • 2026 ATM SBC Report • 2025 Fall Town eetin Presentation • 2024 Town Summit Presentation • Existing Conditions Re ort • Cost Comparison with Other Schools • Total Project Bud. et • Tax�a�er Calculator • High Cost of Doing Nothing We appreciate your continued support and partnership as we move into the next exciting phase of this important project that will serve the needs of our children for many years to come. Sincerely, Kathleen Lenihan Chair, School Building Committee 3