Loading...
HomeMy WebLinkAbout2026-09-29-ConCom-min.pdf Meeting broadcasted by LexMedia PUBLIC MEETING MINUTES Conservation Commission ___________________________________________________________________________ AGENDA Tuesday, September 29th, 2026, 6:30 p.m. This Conservation Commission meeting was held remotely via Zoom, an online meeting platform. Public participation via calling in or using a computer was encouraged. Commissioners Present: Kevin Beuttell (acting chair), Hope Dehmlow Dunne, Philip Hamilton, Jason Hnatko, Ruth Ladd (Chair), Thomas Olivier and Thomas Whelan; Staff Present: Karen Mullins, Conservation Director, Evan Paige, Assistant Conservation Director, and Megan Guardado, Department Assistant; 6:30 PM New Business/Pending Matters Approve Minutes: 08/18/2026 On a motion by Mr. Hamilton and seconded by Mr. Hnatko, the Commission voted 7-0 by roll call vote to approve the 8/18/2026 minutes. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Conservation Plan Modification: 292 Waltham St, CPM-26-4 Mr. David Corey, Northeast Venture Group, stated that applicant is requesting a patio underneath the previously approved deck and is amenable to the patio being constructed of permeable pavers. Mr. Corey also noted that a retaining wall is proposed to the rear of the infiltration system. Mr. Beuttell asked to clarify that the proposed retaining wall will not compromise the integrity of the infiltration system. Mr. Corey stated that the project engineer noted that the retaining wall needs to be ten feet away from the infiltration system. Ms. Ladd asked if additional fill will be brought onsite behind the retaining wall. Mr. Corey stated that no additional fill is proposed. Ms. Ladd asked if the inspection ports will be raised to be above ground level. Ms. Mullins asked for clarity on the grading onsite. Mr. Corey noted that they are proposing to level out the backyard. Mr. Whelan asked if the existing soil would be re-graded. The applicant is proposing to re-grade with the existing soil onsite. The Commission requested that the applicant return with a plan that includes engineering details such as elevations, the height, the width, and the location of the proposed retaining wall. Request for Certificate of Compliance: 127 North St, DEP #201-1137, Bylaw #1094, OpenGov COC-23-5, Full Ms. Mullins stated that a Partial Certificate of Compliance has been issued for the construction work onsite and the complete certificate was outstanding based on the required restoration survivability. The Commission recently visited the site for the Notice of Intent request for this property and found portions of the restoration area to be mowed. Mr. Richard Kirby, LEC, stated that replacement plantings have been installed to mitigate for plants that did not survive. Mr. Kirby asked for clarity on the portion of the site that still required further restoration. The homeowner, Ms. Malavika Singh, stated that the disturbed area is outside of the Feno bounds, not maintained by the owners, and is often accessed by the public. Mr. Kirby asked to review the site in the spring for the purpose of compliance and continue with presenting the Notice of Intent application at this time. The Commission agreed. 7:00 PM New Public Meetings/Hearings Notice of Intent: 17 Stedman Road (Jonas Clarke Middle School) OpenGov Permit# CNOI-26-22, DEP #201-1401 Applicant/Property Owner: John Livsey (applicant), Town of Lexington (owner) Project: Stormwater management infrastructure improvements within Bordering Vegetated Wetlands (BVW), Bank-Mean Annual High-Water Line, Land Under Waterbodies, Bordering Land Subject to Flooding, the 200-foot Riverfront Area, and the 100-foot Buffer Zone to BW and Bordering Land Subject to Flooding (Lexington Code). Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: Jonas Clarke Middle School, 17 Stedman Road, Lexington, MA; Prepared for: John Livsey, Town of Lexington Engineering Department; Prepared by: Nicole Ferrara, LEC Environmental Consultants, Inc.; Date: 09/04/2026 ⎯ Notice of Intent Application and Wetland Resource Area Analysis; Locus: Jonas Clarke Middle School, 17 Stedman Road, Lexington, MA; Prepared for: John Livsey, Town of Lexington Engineering Department; Prepared by: LEC Environmental Consultants, Inc.; Date: 09/08/2026 ⎯ Stormwater Memorandum; Locus: Jonas Clarke Middle School, Lexington, MA; Prepared by: Carly Quinn, PE, Woodard & Curran; Signed and Stamped by: Carly Quinn, Civil PE No. 58891; Date: September 2026 ⎯ Jonas Clarke Middle School Retrofit Design: Sheet G-000, “General Cover Sheet”, Sheet C-001, “Civil Legend & Abbreviations”, Sheet C-002, “Civil Notes”, Sheet C-100, “Civil Existing Conditions”, Sheet C-101, “Civil Site Preparation and Demolition Plan”, Sheet C-200, “Civil Site Plan”, Sheet C-900, “Civil Details”, Sheet C-901, “Civil Details”; Locus: Jonas Clarke Middle School, 17 Stedman Rd, Lexington, MA; Prepared for: Town of Lexington Department of Public Works; Prepared by: Woodard & Curran; Signed and Stamped by: Carly Quinn, Civil PE No. 58891; Date: September 2026 ⎯ Riverfront Area & Buffer Zone Restoration Plan; Locus: Jonas Clarke Middle School, Lexington, MA; Prepared by: LEC Environmental Consultants, Inc.; Date: 06/01/2026; Revised: 09/08/2026 ⎯ Engineering Comments; Date: 09/24/2026 Ms. Nicole Ferrara, LEC Environmental, presented and Ms. Carly Quinn, Woodard and Curran, and Ms. Marissa Martel, Town of Lexington Engineering were present for the hearing. Ms. Ferrara stated that the project includes removal of existing drainage infrastructure and the installation of an enhanced biofiltration basin within the lawn area which is proposed to be vegetated with native plantings. Roughly 175 square feet of vegetation will be temporarily disturbed during this project. Lexington is subject to the EPA’s MS4 General Permit, municipal separate storm sewer system, and the proposed project will bring the site into compliance with the requirements of that permit. Mr. Beuttell asked if it is possible to keep the existing pipe and flared end. Ms. Quinn stated that the existing pipe is slightly back pitched, which requires the replacement of the pipe and flared end. Mr. Olivier asked what the Commission’s typical practice is regarding the approval of temporary disturbance within the 25-foot buffer zone. Mr. Beuttell stated that the temporary impacts outweigh the long-term ecological benefits to the site. On a motion by Ms. Ladd and seconded by Mr. Olivier, the Commission voted 7-0 by roll call vote to close the hearing. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 127 North Street OpenGov Permit# CNOI-26-19, DEP #201-1398 Applicant/Property Owner: Malavika Singh Project: Installation of a fence and landscaping within Bordering Land Subject to Flooding and within the 100-foot Buffer Zone to Bordering Vegetated Wetlands. Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: 127 North St, Lexington, MA; Prepared for: Malavika Singh; Prepared by: Richard Kirby, LEC Environmental Consultants, Inc.; Date: 09/04/2026 ⎯ Fence Plan; Locus: 127 North St, Lexington, MA; Prepared by: Gala Simon Associates Inc.; Signed and Stamped by: Alberto M. Gala, Civil PE No. 36434; Date: 09/04/2026 ⎯ Drainage As Built Plan; Locus: 127 North St, Lexington, MA; Prepared by: Gala Simon Associates Inc.; Signed and Stamped by: Alberto M. Gala, Civil PE No. 36434; Date: 12/15/2022; Revised: 01/30/2023 ⎯ List of Plants; Not Dated ⎯ Image of Proposed Fence; Not Dated Mr. Richard Kirby, LEC Environmental, presented and stated that the proposal includes enclosing the applicant’s backyard with a fence to address privacy and trespassing concerns in the rear of the property. Mr. Kirby stated that the fence is proposed to be installed in front of the Feno markers onsite. A swing set is proposed within the backyard as well. Mr. Beuttell stated that the fence would help prevent encroachment into the restoration area and that the fence should be permeable to allow water to flow. Ms. Ladd asked for clarification on the mitigation plantings. Mr. Kirby stated that additional native plantings are proposed as result of comments from the Commission during their site visit. Ms. Ladd suggested larger plantings that would help prevent the public from walking through the restored area. Mr. Olivier expressed concern for the height of the fence preventing passage of larger animals and asked if a lower fence was considered. Mr. Kirby stated that a shorter fence was considered and that the concentrated habitat for wildlife is near the pond close by and minimal impacts would occur for the wildlife in the area. On a motion by Mr. Hamilton and seconded by Mr. Olivier, the Commission voted 7-0 by roll call vote to close the hearing. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 44 Earl St OpenGov Permit# CNOI-26-23, DEP #201-1400 Applicant/Property Owner: Andrew Berryman and Laura Peeke Project: Raze and rebuild of an existing deck within the 100-foot Buffer Zone to a Bordering Vegetated Wetland. Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: 44 Earl St, Lexington, MA; Prepared for: Andrew Berryman and Laura Peeke; Prepared by: Nicole Ferrara, LEC Environmental Consultants, Inc.; Date: 09/08/2026 ⎯ Notice of Intent Application and Wetland Resource Area Analysis; Locus: 44 Earl St, Lexington, MA; Prepared for: Andrew Berryman and Laura Peeke; Prepared by: LEC Environmental Consultants, Inc.; Date: 09/08/2026 ⎯ Conservation Plan; Locus: 44 Earl St, Lexington, MA; Prepared for: Andrew Berryman and Laura Peeke; Prepared by: Rober Survey; Signed and Stamped by: Scott C. Lynch, PLS No. 51636; Scale: 1” = 20’; Date: 12/01/2025 Ms. Nicole Ferrara, LEC Environmental, presented and stated that the proposal includes the demolition of the existing deck and construction of a larger deck, to be built on sono tube footings with a small concrete landing at the bottom of the proposed stairs. Gravel is proposed under the deck for infiltration. Ms. Ferrara also stated that the applicant is proposing a native seed mix to restore the areas on lawn on town property, and Feno bounds are proposed along the restored area. Mr. Beuttell stated there are pipes that extend onto the town owned parcel and asked if the owner would be amenable to pulling these pipes back and scouring in the area. Ms. Ferrara stated that the owner would prefer the pipes remain as is. Mr. Beuttell noted that the Commission has questions regarding the wetland line and asked if the Commission would agree to approve the project independently from the wetland line. Ms. Ladd agreed to not approve the wetland line and asked if the stairs could continue left rather than towards the 50-foot buffer zone. Ms. Ferrara stated that the stairs would be directed uphill if built away from the wetlands. Mr. Olivier stated that the deck should be narrowed or configuration should be changed in order to meet the Commission’s regulations. Mr. Whelan agreed. Mr. Hamilton stated that he is comfortable with the deck itself as it is a second-story deck and expressed concern for the staircase being configured towards the 50-foot buffer zone. Mr. Beuttell suggested including language in the approval that the deck configuration does not establish an approved location for future construction onsite. On a motion by Ms. Ladd and seconded by Mr. Hamilton, the Commission voted 7-0 by roll call vote to continue the hearing to 10/20/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 27 Valleyfield Street OpenGov Permit# CNOI-26-16, DEP #201-1397 Applicant/Property Owner: Surya Lamichhane Project: Construction of an addition to a single-family dwelling and associated site appurtenances within the 100-foot Buffer Zone to Bordering Vegetated Wetlands. Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: 27 Valleyfield St, Lexington, MA; Prepared for: Surya Lamichhane; Prepared by: Robert Marini, Nativetec; Date: 08/17/2026 ⎯ Notice of Intent; Locus: 27 Valleyfield St, Lexington, MA; Submitted to: Lexington Conservation Commission; Prepared for: Surya Lamichhane; Prepared by: Nativetec; Date: 08/17/2026 ⎯ Limited Existing Conditions Plan; Locus: 27 Valleyfield St, Lexington, MA; Property owner: Surya P. Lamichhane and Shrestha Sabina; Prepared by: Scott Cerrato, Signed and Stamped by: Scott M. Cerrato, PLS 50049; Scale: 1” = 10’; Date: 07/23/2026 ⎯ Proposed Zoning Plan; Locus: 27 Valleyfield St, Lexington, MA; Property owner: Surya P. Lamichhane and Shrestha Sabina; Prepared by: Scott Cerrato; Signed and Stamped by: Scott M. Cerrato, PLS 50049; Scale: 1” = 10’; Date: 07/23/2026 ⎯ N.O.I. Plan; Locus: 27 Valleyfield St, Lexington, MA; Prepared by: NATIVEtec; Signed and Stamped by: Robert Marini, Civil PE No. 48762; Scale: 1” = 10’; Date: 08/17/2026; Revised: 09/10/2026 *Applicant has requested a continuance of the hearing without testimony from 9-29-2026 to 10- 20-2026 On a motion by Mr. Whelan and seconded by Mr. Hamilton, the Commission voted 7-0 by roll call vote to continue the hearing to 10/20/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 44 Grassland Street OpenGov Permit# CNOI-26-18, DEP #201-1399 Applicant/Property Owner: Michael Walsh, 44 Grassland LLC Project: Raze and rebuild of a single-family dwelling and associated site appurtenances within the 100-foot Buffer Zone to Bordering Vegetated Wetlands. Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: 44 Grassland St, Lexington, MA; Prepared for: Michael Walsh, 44 Grassland, LLC; Prepared by: Seth Donohoe, Dillis & Roy Civil Design Group; Date: 08/31/2026 ⎯ Notice of Intent; Locus: 44 Grassland St, Lexington, MA; Prepared for: Michael Walsh, 44 Grassland, LLC; Prepared by: Dillis & Roy Civil Design Group; Date: 09/03/2026 ⎯ Drainage Report; Locus: 44 Grassland St, Lexington, MA; Prepared for: Eycon Builders, LLC; Prepared by: Dillis & Roy Civil Design Group; Date: 08/26/2026; Revised: 09/24/2026 ⎯ Stormwater Operation and Maintenance Manual; Locus: 44 Grassland St, Lexington, MA; Prepared for: Eycon Builders, LLC; Prepared by: Dillis & Roy Civil Design Group, Inc.; Date: 08/26/2026 ⎯ Notice of Intent Plan Set; Locus: 44 Grassland St, Lexington, MA; Prepared for: 44 Grassland LLC; Prepared by: Dillis & Roy Civil Design Group; Signed and Stamped by: Kyle T. Merchant, Civil PE no. 61073; Date: 08/31/2026; The applicant has requested a continuance to the 10/20/2026 meeting. On a motion by Ms. Ladd and seconded by Mr. Whelan, the Commission voted 7-0 by roll call vote to continue the hearing to 10/20/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 7 Conestoga Road OpenGov Permit# CNOI-26-20, DEP #201-1403 Applicant/Property Owner: Vinicius Silva, 7 Conestoga Road LLC Project: Raze and rebuild of a single-family dwelling and associated site appurtenances within the 100-foot Buffer Zone to a Bordering Vegetated Wetland and Bordering Land Subject to Flooding (Lexington Code). Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: 7 Conestoga Road, Lexington, MA; Prepared for: Vinicius Silva, 7 Conestoga Road LLC; Prepared by: Maureen Herald, Norse Environmental Services, Inc.; Date: 07/23/2026 ⎯ Notice of Intent; Locus: 7 Conestoga Road, Lexington, MA; Prepared for: 7 Conestoga Road LLC; Prepared by: Norse Environmental Services, Inc.; Date: September 2026 ⎯ Stormwater Management Report; Locus: 7 Conestoga Road, Lexington, MA; Prepared for: 7 Conestoga Road LLC; Prepared by: Amoskeag Engineering Consultants, PLLC; Signed and Stamped by: Patrick L. Bower, Civil PE No. 48026; Date: 06/23/2026; Revised: 09/03/2026 ⎯ Operation & Maintenance Plan; Locus: 7 Conestoga Road, Lexington, MA; Prepared for: 7 Conestoga Road LLC; Prepared by: Amoskeag Engineering Consultants, PLLC; Signed and Stamped by: Patrick L. Bower, Civil PE No. 48026; Date: 06/23/2026; ⎯ Proposed Site Plan Set: Locus: Locus: 7 Conestoga Road, Lexington, MA; Prepared for: 7 Conestoga Road LLC; Prepared by: AEC, PLLC; Signed and Stamped by: Patrick L. Bower, Civil PE No. 48026; Date: 06/08/2026; Revised: 7/20/2026, 7/22/2026, and 09/02/2026 ⎯ Plan for Proposed Building; Locus: 7 Conestoga Road, Lexington, MA; Prepared by: Framingham Survey Consultants Inc.; Signed and Stamped by: William Tirrell, PLS No. 49930; Date: 07/20/2026; Revised: 08/13/2026, 08/18/2026, and 08/19/2026 *Applicant has requested a continuance of the hearing without testimony from 9-29-2026 to 10- 20-2026 On a motion by Mr. Whelan and seconded by Mr. Hamilton, the Commission voted 7-0 by roll call vote to continue the hearing to 10/20/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 29 Pearl Street OpenGov Permit# CNOI-26-21, DEP #201-XXXX Applicant/Property Owner: Earl and Lourdes Ada (applicants), Sudhir Takurela and Rachita Yadav (property owners) Project: Removal of the existing brick walkway and installation of a permeable paver walkway within the 100-foot Buffer Zone to a Bordering Vegetated Wetland and Bordering Land Subject to Flooding (Lexington Code). Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: 29 Pearl Street, Lexington, MA; Prepared for: Earl and Lourdes Ada; Property Owners: Sudhir Takurela and Rachita Yadav; Prepared by: David Sperduto, Sperduto Land Survey; Date: 09/08/2026 ⎯ Notice of Intent; Locus: 29 Pearl St, Lexington, MA; Prepared by: David Sperduto, Wetlands Identification; Date: 09/08/2026 ⎯ Topographic Plan of Land; Locus: 29 Pearl St, Lexington, MA; Record Owner: Sudhir Takurela and Rachita Yadav; Prepared by: Stamski and McNary, Inc.; Signed and Stamped by: Joseph March, PLS No. 36384; Scale: 1” = 10’; Date: 06/20/2023; Revised: 10/18/2023 and 07/24/2026 ⎯ Restoration Plan; Locus: 29 Pearl St, Lexington, MA; Prepared for: Earl Ada and Lourdes Ada; Prepared by: Sperduto Land Survey/Wetlands Identification; Signed and Stamped by: David Sperduto, PLS No. 38719; Scale: 1” = 10’; Date: 07/11/2026 ⎯ Drainage Plan; Locus: 29 Pearl St, Lexington, MA; Prepared by: Gala Simon Associates Inc.; Signed and Stamped by: Alberto M. Gala, Civil PE No. 36434; Date: 09/02/2026 ⎯ Engineering Drainage Calculations; Locus: 29 Pearl St, Lexington, MA; Prepared by: Gala Simon Associates, Inc.; Signed and Stamped by: Alberto M. Gala, Civil PE No. 36434; Date: 07/07/2026 ⎯ Engineering Comments; Date: 09/24/2026 Mr. David Sperduto, Wetlands Identification, presented and stated that the applicant proposes replacing the existing brick walkway with a permeable paver walkway. Mr. Sperduto stated that an updated delineation has been done onsite in 2026. The site came before the Commission in 2011, and the deck was approved roughly 10 feet from the wetlands for passage area. The updated delineation shows the wetland is now closer to the existing house. Mr. Sperduto stated that the applicant is requesting passage near the house for maintenance and a walking path. The applicant is proposing replicated wetlands at the rear of the site to mitigate for the passage. Mr. Beuttell stated that the information provided on the floodplain mitigation is unclear and the site is not in compliance with the originally approved permit. Ms. Mullins stated that an enforcement order would be issued by the Commission for the noncompliance of the walkways having been built without approval and associated fill onsite. Mr. Sperduto stated that the homeowner would be interested in pruning or removing the tree along the sloped passageway. Mr. Beuttell stated that Commission approval would be needed for removal of this tree as it is within the 25-foot buffer zone. Mr. Beuttell also stated that Feno bounds would be needed to demarcate the wetlands. On a motion by Mr. Olivier and seconded by Mr. Hnatko, the Commission voted 7-0 by roll call vote to continue the hearing to 10/20/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 3 Goffe Road OpenGov Permit# CNOI-26-24, DEP #201-1402 Applicant/Property Owner: Frank Hsieh and Lily Li, Lily Y Li Family Trust Project: Raze and rebuild of a single-family dwelling and associated site appurtenances within the 100-foot Buffer Zone to Bordering Vegetated Wetlands and Bordering Land Subject to Flooding (Lexington Code). Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: 3 Goffe Road, Lexington, MA; Prepared for: Frank Hsieh and Lily Li, Trustees; Prepared by: Maureen Herald, Norse Environmental Services, Inc.; Date: 09/08/2026 ⎯ Notice of Intent Report; Locus: 3 Goffe Rd, Lexington, MA; Prepared for: Lily Y Li Family Trust, Frank Hsieh and Lily Li, Trustees; Prepared by: Norse Environmental Services, Inc.; Date: September 2026 ⎯ Plot Plan of Land; Locus: 3 Goffe Rd, Lexington MA; Prepared for: Lily Y. Li and Frank Y. Hsieh; Prepared by: Sullivan Engineering Group, LLC; Signed and Stamped by: John D Sullivan III, Civil PE No. 41586, and Paul Anocchio, PLS No. 36115; Scale: 1” = 20’ and Not to Scale; Date: 09/07/2026 ⎯ Stormwater Analysis; Locus: 3 Goffe Rd, Lexington, MA; Prepared by: John (Jack) D Sullivan III, PE, Sullivan Engineering Group, LLC; Signed and Stamped by: John D Sullivan III, Civil PE No. 41586; Date: 09/08/2026 ⎯ GFA Calculation’s Revised; Date: 09/23/2026 *Applicant has requested a continuance of the hearing without testimony from 9-29-2026 to 10- 20-2026 On a motion by Mr. Olivier and seconded by Mr. Whelan, the Commission voted 7-0 by roll call vote to continue the hearing to 10/20/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Continued Public Meetings/Hearings Notice of Intent: 21 Valleyfield Street OpenGov Permit# CNOI-26-11, DEP #201-1392 Applicant/Property Owner: Nazar Vincent, Avatar Design & Construction (applicant), Joshua and Rachel Riojas (property owners) Project: Raze and rebuild of a single-family dwelling and associated site appurtenances within the 100-foot Buffer Zone to Bordering Vegetated Wetlands. Previous Hearing Date: 08/18/2026, 09/08/2026 Supplemental Documentation Submitted: ⎯ Stormwater Report; Locus: 21 Valleyfield St, Lexington, MA; Prepared for: Avatar Construction; Prepared by: FODERA Engineering; Signed and Stamped by: Patrick F. O’Reilly IV, Civil PE no. 60003; Date: 07/27/2026; Revised: 08/25/2026, 09/04/2026, and 09/17/2026 ⎯ Site Plan Set: Sheet C-1, “Existing Conditions Plan”, Sheet C-2, “Proposed Site Plan”, Sheet C-3, “Details”; Locus: 21 Valleyfield St, Lexington, MA; Prepared for: Avatar Design & Construction; Prepared by: Fodera Engineering; Signed and Stamped by: David Philip Terenzoni, Civil PE no. 38720; Date: 07/27/2026; Revised: 08/10/2026, 08/25/2026, 09/04/2026, and 09/18/2026 ⎯ Sheet C-1, Driveway “Visual”, Locus: 21 Valleyfield St, Lexington, MA; Prepared for: Avatar Construction; Prepared by: FODERA Engineering; Date: 09/17/2026 ⎯ Supplemental Information Memorandum; To: Lexington Conservation Commission; From: LEC; Date: 09/21/2026 ⎯ Engineering Comments 4; Date: 09/24/2026 Ms. Nicole Ferrara, LEC Environmental Consultants, presented and stated that revised plans have been provided, reducing activity within the 50-foot buffer zone and increasing the proposed restoration. Ms. Ferrara stated that the driveway width has been reduced to the minimum required turnaround width. To address remaining comments from the engineering department, Ms. Ferrara noted that the existing manhole rim will remain at its current elevation. Mr. Beuttell stated the applicant has made efforts to address the Commission’s request to decrease the footprint of the proposed driveway. Mr. Beuttell stated that there does not appear to be extraordinary circumstances to permit allowing the driveway expansion within the 50-foot buffer zone. Mr. Olivier asked for clarity of the reasons why further reduction of the driveway would be impracticable. Mr. Rob Paccione, project architect, stated that the owner has concerns to make the site accessible for long-term use. The Commission asked the applicant if they wished to make changes to the plans based on the Commission’s concerns and the applicant stated there would be no further changes to the proposed plan. On a motion by Mr. Hamilton and seconded by Ms. Ladd, the Commission voted 7-0 by roll call vote to close the hearing. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 14 Barberry Road OpenGov Permit# CNOI-26-12, DEP #201-1394 Applicant/Property Owner: Roseanna Loring and Joseph Elias Project: Construction of a carport, deck, and patios, and associated site appurtenances within the 100-foot Buffer Zone to Bordering Vegetated Wetlands. Previous Hearing Date: 08/18/2026, 09/08/2026 Supplemental Documentation Submitted: ⎯ Drainage Plan; Locus: 14 Barberry Road, Lexington, MA; Prepared by: Gala Simon Associates Inc.; Signed and Stamped by: Alberto M. Gala, Civil PE No. 36434; Date: 07/28/2026; Revised: 08/13/2026, 08/26/2026, and 09/21/2026 Ms. Nicole Ferrara, LEC Environmental Consultants, presented and stated that the applicant has revised the plans and that the deck proposed to be outside of the 50-foot buffer zone and partially located where the existing deck is located. The landscape area beside the driveway has been reduced to allow for two cars in the driveway and additional mitigation area is proposed. Ms. Ladd stated she objects to the small portion of lawn extended down to the wetland line and suggested the feno bounds be extended to cross at the 25-foot buffer zone. Mr. Olivier expressed concern for the pavement proposed within the 50-foot buffer zone. Ms. Ferrara stated that the driveway will be overlayed on the existing base. Mr. Beuttell stated that this proposed driveway change would qualify as maintenance. Ms. Ferrara stated that she will follow up with the applicant regarding the Commission’s comments. On a motion by Ms. Ladd and seconded by Mr. Olivier, the Commission voted 7-0 by roll call vote to continue the hearing to 10/20/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Amendment to Order of Conditions: 4 Trotting Horse Drive OpenGov Permit# AOOC-26-9, DEP #201-1339 Applicant/Property Owner: Arthur Chang Project: Plan modifications including a change in the infiltration chambers and updated stormwater management within the 200-foot Riverfront Area and the 100-foot buffer zone to Bordering Vegetated Wetlands. Previous Hearing Date: 09/08/2026 Supplemental Documentation Submitted: ⎯ Engineering comments via email; Date: 09/16/2026 Mr. Thomas Hughes, Hughes Environmental, presented and stated that the groundwater onsite was found to be higher than anticipated and has resulted in the request for plan modification to the stormwater management. Mr. Hughes stated that all comments that remain from the Town Engineering Department have been addressed. Mr. Hughes stated that the proposed restoration area is in the rear of the lot, outside of street view, and includes invasive species removal. Mr. Hughes stated that the applicant is amenable to the Commission conditioning the deed in regard to the stormwater management in perpetuity. Mr. Jonathan Feld, 6 Trotting Horse Drive, asked where the drain easement is directing runoff to. Mr. Hughes stated that the stormwater drains flow into a catch basin and outlets into the nearby stream. On a motion by Mr. Hamilton and seconded by Mr. Whelan, the Commission voted 7-0 by roll call vote to close the hearing. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 213 East Street OpenGov Permit# CNOI-26-17, DEP #201-1404 Applicant/Property Owner: Mallikarjun Sundaram Project: Construction of an addition, deck and driveway, and associated site appurtenances within the 100-foot Buffer Zone to a Freshwater Wetland. Previous Hearing Date: 09/08/2026 Supplemental Documentation Submitted: ⎯ None *Applicant has requested a continuance of the hearing without testimony from 9-29-2026 to 10- 20-2026 On a motion by Mr. Olivier and seconded by Ms. Ladd, the Commission voted 7-0 by roll call vote to continue the hearing to 10/20/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Request for Determination of Applicability: 1 Lillian Road OpenGov Permit# CDOA-26-8 Applicant/Property Owner: Nora O’Keefe, NSTAR Electric dba Eversource Energy (applicant), Boston Edison Company, c/o Eversource Tax Department (property owner) Project: The installation of spare autotransformer pads, exploratory test pits and soil borings in the existing substation, within the 200-foot Riverfront Area and the 100-foot buffer zone to Bordering Vegetated Wetlands and 100-foot buffer zone from Bordering Land Subject to Flooding (Local Code). Previous Hearing Date: 08/18/2026, 09/08/2026 Supplemental Documentation Submitted: ⎯ None The Commission did not receive a continuance request or other communications from the applicant and issued a positive determination under the bylaw. On a motion by Mr. Olivier and seconded by Mr. Hamilton, the Commission voted 7-0 by roll call vote to issue a positive determination under the bylaw. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 19 Peacock Farm Road OpenGov Permit# CNOI-26-7, DEP #201-1391 Applicant/Property Owner: Susannah and Mark Castrovini Project: Construction of an addition, driveway, stormwater management infrastructure, and other site appurtenances within the 100-foot buffer zone to Bordering Vegetated Wetlands. Previous Hearing Date: 08/18/2026, 09/08/2026 Supplemental Documentation Submitted: ⎯ None *Applicant has requested a continuance of the hearing without testimony from 9-29-2026 to 10- 20-2026 On a motion by Ms. Ladd and seconded by Mr. Whelan, the Commission voted 7-0 by roll call vote to continue the hearing to 10/20/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye New Business/Pending Matters, Continued Request for Certificate of Compliance: 12 Ledgelawn Ave, DEP #201-1235, OpenGov CNOI- 21-32, COC-24-28, Full Ms. Mullins stated that this site is in compliance. Ms. Mullins noted the abutting property has recent violations including tree removal in the 200-foot Riverfront Area and a couple of these trees were on 12 Ledgelawn Ave. The violation at the abutting property does not impact the compliance status of this application. On a motion by Mr. Hamilton and seconded by Mr. Olivier, the Commission voted 7-0 by roll call vote to issue the Certificate of Compliance. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Request for Certificate of Compliance: 320 Concord Ave, DEP #201-1300, OpenGov CNOI-23- 23, AOOC-24-5, COC-26-11, Full Ms. Mullins stated that this item is has compliance issues requiring follow up prior to issuance of the Certificate of Compliance. Request for Certificate of Compliance: 232 Lincoln St, DEP #201-1349, OpenGov CNOI-25-1, COC-26-13, Partial Ms. Mullins stated that this item is has compliance issues requiring follow up prior to issuance of the Certificate of Compliance. Request for Certificate of Compliance: 609-611 Massachusetts Ave, DEP #201-1281, OpenGov CNOI-23-2, COC-26-17, Partial Ms. Mullins stated that this item is has compliance issues requiring follow up prior to issuance of the Certificate of Compliance. Request for Certificate of Compliance: 18 Bacon St, DEP #201-1337, OpenGov CNOI-24-29, COC-26-18, Full Ms. Mullins stated that the Assistant Conservation Director Evan Paige has visited the site and found it to be in compliance. On a motion by Mr. Whelan and seconded by Mr. Hamilton, the Commission voted 7-0 by roll call vote to issue the Certificate of Compliance. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye Request for Certificate of Compliance: 52 Turning Mill Rd, DEP #201-1331, OpenGov CNOI- 24-23, COC-26-19, Partial Ms. Mullins stated that staff have not been able to visit the site yet for compliance review. Request for Certificate of Compliance: 16 Middleby Rd, DEP #201-1382, OpenGov CNOI-25- 30, COC-26-20, Full Ms. Mullins stated that follow up is needed for this request. Wetland Protection Code 130 Rules, Proposed Updates Discussion Mr. Hamilton stated that the subcommittee met in May 2026 to discuss the regulations to bring them into conformity with the State Act. Proposed changes include revisions to the definitions section of the regulations, to change the language of the definition of vernal pool with language from the state definition and to include vernal pool habitat. Mr. Hamilton also stated that the changes include reorganization of the definitions. Ms. Ladd suggested minor grammatical edits that will be forwarded to the Commission for review and approval. Schedule site visits: 10/20/2026 Meeting There will be one site visit scheduled for Monday October 19th, 2026, starting at 5:00pm. Reports: Bike Advisory, Community Gardens, Community Preservation Committee, Enforcement Updates, Greenway Corridor Committee, Land Acquisition, Land Management, Land Steward Directors, Tree Committee Mr. Whelan provided an update from the Greenway Corridor Committee (GCC) and stated that the High School construction is obstructing trail access. The Concord Avenue parcel is waiting on a survey. On a motion by Mr. Hnatko and seconded by Mr. Olivier, the Commission voted 7-0 by roll call vote to adjourn the meeting. Record of Vote as Follows: Kevin Beuttell – Aye Hope Dehmlow Dunne – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd – Aye Thomas Olivier – Aye Thomas Whelan – Aye 9:30pm Respectfully Submitted, Megan Guardado LUHD Department Assistant Approved: 10/20/2026 Archived: 10/26/2026