HomeMy WebLinkAbout2026-09-29-ConCom-min.pdf
Meeting broadcasted by LexMedia
PUBLIC MEETING MINUTES
Conservation Commission
___________________________________________________________________________
AGENDA Tuesday, September 29th, 2026, 6:30 p.m.
This Conservation Commission meeting was held remotely via Zoom, an online meeting
platform. Public participation via calling in or using a computer was encouraged.
Commissioners Present: Kevin Beuttell (acting chair), Hope Dehmlow Dunne, Philip Hamilton,
Jason Hnatko, Ruth Ladd (Chair), Thomas Olivier and Thomas Whelan;
Staff Present: Karen Mullins, Conservation Director, Evan Paige, Assistant Conservation
Director, and Megan Guardado, Department Assistant;
6:30 PM New Business/Pending Matters
Approve Minutes: 08/18/2026
On a motion by Mr. Hamilton and seconded by Mr. Hnatko, the Commission voted 7-0 by roll
call vote to approve the 8/18/2026 minutes.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Conservation Plan Modification: 292 Waltham St, CPM-26-4
Mr. David Corey, Northeast Venture Group, stated that applicant is requesting a patio underneath
the previously approved deck and is amenable to the patio being constructed of permeable
pavers. Mr. Corey also noted that a retaining wall is proposed to the rear of the infiltration
system. Mr. Beuttell asked to clarify that the proposed retaining wall will not compromise the
integrity of the infiltration system. Mr. Corey stated that the project engineer noted that the
retaining wall needs to be ten feet away from the infiltration system. Ms. Ladd asked if
additional fill will be brought onsite behind the retaining wall. Mr. Corey stated that no
additional fill is proposed. Ms. Ladd asked if the inspection ports will be raised to be above
ground level.
Ms. Mullins asked for clarity on the grading onsite. Mr. Corey noted that they are proposing to
level out the backyard. Mr. Whelan asked if the existing soil would be re-graded. The applicant
is proposing to re-grade with the existing soil onsite. The Commission requested that the
applicant return with a plan that includes engineering details such as elevations, the height, the
width, and the location of the proposed retaining wall.
Request for Certificate of Compliance: 127 North St, DEP #201-1137, Bylaw #1094, OpenGov
COC-23-5, Full
Ms. Mullins stated that a Partial Certificate of Compliance has been issued for the construction
work onsite and the complete certificate was outstanding based on the required restoration
survivability. The Commission recently visited the site for the Notice of Intent request for this
property and found portions of the restoration area to be mowed.
Mr. Richard Kirby, LEC, stated that replacement plantings have been installed to mitigate for
plants that did not survive. Mr. Kirby asked for clarity on the portion of the site that still required
further restoration. The homeowner, Ms. Malavika Singh, stated that the disturbed area is outside
of the Feno bounds, not maintained by the owners, and is often accessed by the public.
Mr. Kirby asked to review the site in the spring for the purpose of compliance and continue with
presenting the Notice of Intent application at this time. The Commission agreed.
7:00 PM New Public Meetings/Hearings
Notice of Intent: 17 Stedman Road (Jonas Clarke Middle School)
OpenGov Permit# CNOI-26-22, DEP #201-1401
Applicant/Property Owner: John Livsey (applicant), Town of Lexington (owner)
Project: Stormwater management infrastructure improvements within Bordering Vegetated
Wetlands (BVW), Bank-Mean Annual High-Water Line, Land Under Waterbodies, Bordering
Land Subject to Flooding, the 200-foot Riverfront Area, and the 100-foot Buffer Zone to BW
and Bordering Land Subject to Flooding (Lexington Code).
Documentation Submitted:
⎯ WPA Form 3 – Notice of Intent; Locus: Jonas Clarke Middle School, 17 Stedman Road,
Lexington, MA; Prepared for: John Livsey, Town of Lexington Engineering Department;
Prepared by: Nicole Ferrara, LEC Environmental Consultants, Inc.; Date: 09/04/2026
⎯ Notice of Intent Application and Wetland Resource Area Analysis; Locus: Jonas Clarke
Middle School, 17 Stedman Road, Lexington, MA; Prepared for: John Livsey, Town of
Lexington Engineering Department; Prepared by: LEC Environmental Consultants, Inc.;
Date: 09/08/2026
⎯ Stormwater Memorandum; Locus: Jonas Clarke Middle School, Lexington, MA;
Prepared by: Carly Quinn, PE, Woodard & Curran; Signed and Stamped by: Carly Quinn,
Civil PE No. 58891; Date: September 2026
⎯ Jonas Clarke Middle School Retrofit Design: Sheet G-000, “General Cover Sheet”, Sheet
C-001, “Civil Legend & Abbreviations”, Sheet C-002, “Civil Notes”, Sheet C-100, “Civil
Existing Conditions”, Sheet C-101, “Civil Site Preparation and Demolition Plan”, Sheet
C-200, “Civil Site Plan”, Sheet C-900, “Civil Details”, Sheet C-901, “Civil Details”;
Locus: Jonas Clarke Middle School, 17 Stedman Rd, Lexington, MA; Prepared for:
Town of Lexington Department of Public Works; Prepared by: Woodard & Curran;
Signed and Stamped by: Carly Quinn, Civil PE No. 58891; Date: September 2026
⎯ Riverfront Area & Buffer Zone Restoration Plan; Locus: Jonas Clarke Middle School,
Lexington, MA; Prepared by: LEC Environmental Consultants, Inc.; Date: 06/01/2026;
Revised: 09/08/2026
⎯ Engineering Comments; Date: 09/24/2026
Ms. Nicole Ferrara, LEC Environmental, presented and Ms. Carly Quinn, Woodard and Curran,
and Ms. Marissa Martel, Town of Lexington Engineering were present for the hearing. Ms.
Ferrara stated that the project includes removal of existing drainage infrastructure and the
installation of an enhanced biofiltration basin within the lawn area which is proposed to be
vegetated with native plantings. Roughly 175 square feet of vegetation will be temporarily
disturbed during this project. Lexington is subject to the EPA’s MS4 General Permit, municipal
separate storm sewer system, and the proposed project will bring the site into compliance with
the requirements of that permit.
Mr. Beuttell asked if it is possible to keep the existing pipe and flared end. Ms. Quinn stated that
the existing pipe is slightly back pitched, which requires the replacement of the pipe and flared
end.
Mr. Olivier asked what the Commission’s typical practice is regarding the approval of temporary
disturbance within the 25-foot buffer zone. Mr. Beuttell stated that the temporary impacts
outweigh the long-term ecological benefits to the site.
On a motion by Ms. Ladd and seconded by Mr. Olivier, the Commission voted 7-0 by roll call
vote to close the hearing.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Notice of Intent: 127 North Street
OpenGov Permit# CNOI-26-19, DEP #201-1398
Applicant/Property Owner: Malavika Singh
Project: Installation of a fence and landscaping within Bordering Land Subject to Flooding and
within the 100-foot Buffer Zone to Bordering Vegetated Wetlands.
Documentation Submitted:
⎯ WPA Form 3 – Notice of Intent; Locus: 127 North St, Lexington, MA; Prepared for:
Malavika Singh; Prepared by: Richard Kirby, LEC Environmental Consultants, Inc.;
Date: 09/04/2026
⎯ Fence Plan; Locus: 127 North St, Lexington, MA; Prepared by: Gala Simon Associates
Inc.; Signed and Stamped by: Alberto M. Gala, Civil PE No. 36434; Date: 09/04/2026
⎯ Drainage As Built Plan; Locus: 127 North St, Lexington, MA; Prepared by: Gala Simon
Associates Inc.; Signed and Stamped by: Alberto M. Gala, Civil PE No. 36434; Date:
12/15/2022; Revised: 01/30/2023
⎯ List of Plants; Not Dated
⎯ Image of Proposed Fence; Not Dated
Mr. Richard Kirby, LEC Environmental, presented and stated that the proposal includes
enclosing the applicant’s backyard with a fence to address privacy and trespassing concerns in
the rear of the property. Mr. Kirby stated that the fence is proposed to be installed in front of the
Feno markers onsite. A swing set is proposed within the backyard as well. Mr. Beuttell stated
that the fence would help prevent encroachment into the restoration area and that the fence
should be permeable to allow water to flow.
Ms. Ladd asked for clarification on the mitigation plantings. Mr. Kirby stated that additional
native plantings are proposed as result of comments from the Commission during their site visit.
Ms. Ladd suggested larger plantings that would help prevent the public from walking through the
restored area.
Mr. Olivier expressed concern for the height of the fence preventing passage of larger animals
and asked if a lower fence was considered. Mr. Kirby stated that a shorter fence was considered
and that the concentrated habitat for wildlife is near the pond close by and minimal impacts
would occur for the wildlife in the area.
On a motion by Mr. Hamilton and seconded by Mr. Olivier, the Commission voted 7-0 by roll
call vote to close the hearing.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Notice of Intent: 44 Earl St
OpenGov Permit# CNOI-26-23, DEP #201-1400
Applicant/Property Owner: Andrew Berryman and Laura Peeke
Project: Raze and rebuild of an existing deck within the 100-foot Buffer Zone to a Bordering
Vegetated Wetland.
Documentation Submitted:
⎯ WPA Form 3 – Notice of Intent; Locus: 44 Earl St, Lexington, MA; Prepared for:
Andrew Berryman and Laura Peeke; Prepared by: Nicole Ferrara, LEC Environmental
Consultants, Inc.; Date: 09/08/2026
⎯ Notice of Intent Application and Wetland Resource Area Analysis; Locus: 44 Earl St,
Lexington, MA; Prepared for: Andrew Berryman and Laura Peeke; Prepared by: LEC
Environmental Consultants, Inc.; Date: 09/08/2026
⎯ Conservation Plan; Locus: 44 Earl St, Lexington, MA; Prepared for: Andrew Berryman
and Laura Peeke; Prepared by: Rober Survey; Signed and Stamped by: Scott C. Lynch,
PLS No. 51636; Scale: 1” = 20’; Date: 12/01/2025
Ms. Nicole Ferrara, LEC Environmental, presented and stated that the proposal includes the
demolition of the existing deck and construction of a larger deck, to be built on sono tube
footings with a small concrete landing at the bottom of the proposed stairs. Gravel is proposed
under the deck for infiltration. Ms. Ferrara also stated that the applicant is proposing a native
seed mix to restore the areas on lawn on town property, and Feno bounds are proposed along the
restored area.
Mr. Beuttell stated there are pipes that extend onto the town owned parcel and asked if the owner
would be amenable to pulling these pipes back and scouring in the area. Ms. Ferrara stated that
the owner would prefer the pipes remain as is. Mr. Beuttell noted that the Commission has
questions regarding the wetland line and asked if the Commission would agree to approve the
project independently from the wetland line.
Ms. Ladd agreed to not approve the wetland line and asked if the stairs could continue left rather
than towards the 50-foot buffer zone. Ms. Ferrara stated that the stairs would be directed uphill if
built away from the wetlands.
Mr. Olivier stated that the deck should be narrowed or configuration should be changed in order
to meet the Commission’s regulations. Mr. Whelan agreed.
Mr. Hamilton stated that he is comfortable with the deck itself as it is a second-story deck and
expressed concern for the staircase being configured towards the 50-foot buffer zone. Mr.
Beuttell suggested including language in the approval that the deck configuration does not
establish an approved location for future construction onsite.
On a motion by Ms. Ladd and seconded by Mr. Hamilton, the Commission voted 7-0 by roll call
vote to continue the hearing to 10/20/2026, at the applicant’s request.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Notice of Intent: 27 Valleyfield Street
OpenGov Permit# CNOI-26-16, DEP #201-1397
Applicant/Property Owner: Surya Lamichhane
Project: Construction of an addition to a single-family dwelling and associated site
appurtenances within the 100-foot Buffer Zone to Bordering Vegetated Wetlands.
Documentation Submitted:
⎯ WPA Form 3 – Notice of Intent; Locus: 27 Valleyfield St, Lexington, MA; Prepared for:
Surya Lamichhane; Prepared by: Robert Marini, Nativetec; Date: 08/17/2026
⎯ Notice of Intent; Locus: 27 Valleyfield St, Lexington, MA; Submitted to: Lexington
Conservation Commission; Prepared for: Surya Lamichhane; Prepared by: Nativetec;
Date: 08/17/2026
⎯ Limited Existing Conditions Plan; Locus: 27 Valleyfield St, Lexington, MA; Property
owner: Surya P. Lamichhane and Shrestha Sabina; Prepared by: Scott Cerrato, Signed
and Stamped by: Scott M. Cerrato, PLS 50049; Scale: 1” = 10’; Date: 07/23/2026
⎯ Proposed Zoning Plan; Locus: 27 Valleyfield St, Lexington, MA; Property owner: Surya
P. Lamichhane and Shrestha Sabina; Prepared by: Scott Cerrato; Signed and Stamped by:
Scott M. Cerrato, PLS 50049; Scale: 1” = 10’; Date: 07/23/2026
⎯ N.O.I. Plan; Locus: 27 Valleyfield St, Lexington, MA; Prepared by: NATIVEtec; Signed
and Stamped by: Robert Marini, Civil PE No. 48762; Scale: 1” = 10’; Date: 08/17/2026;
Revised: 09/10/2026
*Applicant has requested a continuance of the hearing without testimony from 9-29-2026 to 10-
20-2026
On a motion by Mr. Whelan and seconded by Mr. Hamilton, the Commission voted 7-0 by roll
call vote to continue the hearing to 10/20/2026, at the applicant’s request.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Notice of Intent: 44 Grassland Street
OpenGov Permit# CNOI-26-18, DEP #201-1399
Applicant/Property Owner: Michael Walsh, 44 Grassland LLC
Project: Raze and rebuild of a single-family dwelling and associated site appurtenances within
the 100-foot Buffer Zone to Bordering Vegetated Wetlands.
Documentation Submitted:
⎯ WPA Form 3 – Notice of Intent; Locus: 44 Grassland St, Lexington, MA; Prepared for:
Michael Walsh, 44 Grassland, LLC; Prepared by: Seth Donohoe, Dillis & Roy Civil
Design Group; Date: 08/31/2026
⎯ Notice of Intent; Locus: 44 Grassland St, Lexington, MA; Prepared for: Michael Walsh,
44 Grassland, LLC; Prepared by: Dillis & Roy Civil Design Group; Date: 09/03/2026
⎯ Drainage Report; Locus: 44 Grassland St, Lexington, MA; Prepared for: Eycon Builders,
LLC; Prepared by: Dillis & Roy Civil Design Group; Date: 08/26/2026; Revised:
09/24/2026
⎯ Stormwater Operation and Maintenance Manual; Locus: 44 Grassland St, Lexington,
MA; Prepared for: Eycon Builders, LLC; Prepared by: Dillis & Roy Civil Design Group,
Inc.; Date: 08/26/2026
⎯ Notice of Intent Plan Set; Locus: 44 Grassland St, Lexington, MA; Prepared for: 44
Grassland LLC; Prepared by: Dillis & Roy Civil Design Group; Signed and Stamped by:
Kyle T. Merchant, Civil PE no. 61073; Date: 08/31/2026;
The applicant has requested a continuance to the 10/20/2026 meeting.
On a motion by Ms. Ladd and seconded by Mr. Whelan, the Commission voted 7-0 by roll call
vote to continue the hearing to 10/20/2026, at the applicant’s request.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Notice of Intent: 7 Conestoga Road
OpenGov Permit# CNOI-26-20, DEP #201-1403
Applicant/Property Owner: Vinicius Silva, 7 Conestoga Road LLC
Project: Raze and rebuild of a single-family dwelling and associated site appurtenances within
the 100-foot Buffer Zone to a Bordering Vegetated Wetland and Bordering Land Subject to
Flooding (Lexington Code).
Documentation Submitted:
⎯ WPA Form 3 – Notice of Intent; Locus: 7 Conestoga Road, Lexington, MA; Prepared
for: Vinicius Silva, 7 Conestoga Road LLC; Prepared by: Maureen Herald, Norse
Environmental Services, Inc.; Date: 07/23/2026
⎯ Notice of Intent; Locus: 7 Conestoga Road, Lexington, MA; Prepared for: 7 Conestoga
Road LLC; Prepared by: Norse Environmental Services, Inc.; Date: September 2026
⎯ Stormwater Management Report; Locus: 7 Conestoga Road, Lexington, MA; Prepared
for: 7 Conestoga Road LLC; Prepared by: Amoskeag Engineering Consultants, PLLC;
Signed and Stamped by: Patrick L. Bower, Civil PE No. 48026; Date: 06/23/2026;
Revised: 09/03/2026
⎯ Operation & Maintenance Plan; Locus: 7 Conestoga Road, Lexington, MA; Prepared for:
7 Conestoga Road LLC; Prepared by: Amoskeag Engineering Consultants, PLLC; Signed
and Stamped by: Patrick L. Bower, Civil PE No. 48026; Date: 06/23/2026;
⎯ Proposed Site Plan Set: Locus: Locus: 7 Conestoga Road, Lexington, MA; Prepared for:
7 Conestoga Road LLC; Prepared by: AEC, PLLC; Signed and Stamped by: Patrick L.
Bower, Civil PE No. 48026; Date: 06/08/2026; Revised: 7/20/2026, 7/22/2026, and
09/02/2026
⎯ Plan for Proposed Building; Locus: 7 Conestoga Road, Lexington, MA; Prepared by:
Framingham Survey Consultants Inc.; Signed and Stamped by: William Tirrell, PLS No.
49930; Date: 07/20/2026; Revised: 08/13/2026, 08/18/2026, and 08/19/2026
*Applicant has requested a continuance of the hearing without testimony from 9-29-2026 to 10-
20-2026
On a motion by Mr. Whelan and seconded by Mr. Hamilton, the Commission voted 7-0 by roll
call vote to continue the hearing to 10/20/2026, at the applicant’s request.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Notice of Intent: 29 Pearl Street
OpenGov Permit# CNOI-26-21, DEP #201-XXXX
Applicant/Property Owner: Earl and Lourdes Ada (applicants), Sudhir Takurela and Rachita
Yadav (property owners)
Project: Removal of the existing brick walkway and installation of a permeable paver walkway
within the 100-foot Buffer Zone to a Bordering Vegetated Wetland and Bordering Land Subject
to Flooding (Lexington Code).
Documentation Submitted:
⎯ WPA Form 3 – Notice of Intent; Locus: 29 Pearl Street, Lexington, MA; Prepared for:
Earl and Lourdes Ada; Property Owners: Sudhir Takurela and Rachita Yadav; Prepared
by: David Sperduto, Sperduto Land Survey; Date: 09/08/2026
⎯ Notice of Intent; Locus: 29 Pearl St, Lexington, MA; Prepared by: David Sperduto,
Wetlands Identification; Date: 09/08/2026
⎯ Topographic Plan of Land; Locus: 29 Pearl St, Lexington, MA; Record Owner: Sudhir
Takurela and Rachita Yadav; Prepared by: Stamski and McNary, Inc.; Signed and
Stamped by: Joseph March, PLS No. 36384; Scale: 1” = 10’; Date: 06/20/2023; Revised:
10/18/2023 and 07/24/2026
⎯ Restoration Plan; Locus: 29 Pearl St, Lexington, MA; Prepared for: Earl Ada and
Lourdes Ada; Prepared by: Sperduto Land Survey/Wetlands Identification; Signed and
Stamped by: David Sperduto, PLS No. 38719; Scale: 1” = 10’; Date: 07/11/2026
⎯ Drainage Plan; Locus: 29 Pearl St, Lexington, MA; Prepared by: Gala Simon Associates
Inc.; Signed and Stamped by: Alberto M. Gala, Civil PE No. 36434; Date: 09/02/2026
⎯ Engineering Drainage Calculations; Locus: 29 Pearl St, Lexington, MA; Prepared by:
Gala Simon Associates, Inc.; Signed and Stamped by: Alberto M. Gala, Civil PE No.
36434; Date: 07/07/2026
⎯ Engineering Comments; Date: 09/24/2026
Mr. David Sperduto, Wetlands Identification, presented and stated that the applicant proposes
replacing the existing brick walkway with a permeable paver walkway. Mr. Sperduto stated that
an updated delineation has been done onsite in 2026. The site came before the Commission in
2011, and the deck was approved roughly 10 feet from the wetlands for passage area. The
updated delineation shows the wetland is now closer to the existing house. Mr. Sperduto stated
that the applicant is requesting passage near the house for maintenance and a walking path. The
applicant is proposing replicated wetlands at the rear of the site to mitigate for the passage.
Mr. Beuttell stated that the information provided on the floodplain mitigation is unclear and the
site is not in compliance with the originally approved permit. Ms. Mullins stated that an
enforcement order would be issued by the Commission for the noncompliance of the walkways
having been built without approval and associated fill onsite.
Mr. Sperduto stated that the homeowner would be interested in pruning or removing the tree
along the sloped passageway. Mr. Beuttell stated that Commission approval would be needed for
removal of this tree as it is within the 25-foot buffer zone. Mr. Beuttell also stated that Feno
bounds would be needed to demarcate the wetlands.
On a motion by Mr. Olivier and seconded by Mr. Hnatko, the Commission voted 7-0 by roll call
vote to continue the hearing to 10/20/2026, at the applicant’s request.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Notice of Intent: 3 Goffe Road
OpenGov Permit# CNOI-26-24, DEP #201-1402
Applicant/Property Owner: Frank Hsieh and Lily Li, Lily Y Li Family Trust
Project: Raze and rebuild of a single-family dwelling and associated site appurtenances within
the 100-foot Buffer Zone to Bordering Vegetated Wetlands and Bordering Land Subject to
Flooding (Lexington Code).
Documentation Submitted:
⎯ WPA Form 3 – Notice of Intent; Locus: 3 Goffe Road, Lexington, MA; Prepared for:
Frank Hsieh and Lily Li, Trustees; Prepared by: Maureen Herald, Norse Environmental
Services, Inc.; Date: 09/08/2026
⎯ Notice of Intent Report; Locus: 3 Goffe Rd, Lexington, MA; Prepared for: Lily Y Li
Family Trust, Frank Hsieh and Lily Li, Trustees; Prepared by: Norse Environmental
Services, Inc.; Date: September 2026
⎯ Plot Plan of Land; Locus: 3 Goffe Rd, Lexington MA; Prepared for: Lily Y. Li and Frank
Y. Hsieh; Prepared by: Sullivan Engineering Group, LLC; Signed and Stamped by: John
D Sullivan III, Civil PE No. 41586, and Paul Anocchio, PLS No. 36115; Scale: 1” = 20’
and Not to Scale; Date: 09/07/2026
⎯ Stormwater Analysis; Locus: 3 Goffe Rd, Lexington, MA; Prepared by: John (Jack) D
Sullivan III, PE, Sullivan Engineering Group, LLC; Signed and Stamped by: John D
Sullivan III, Civil PE No. 41586; Date: 09/08/2026
⎯ GFA Calculation’s Revised; Date: 09/23/2026
*Applicant has requested a continuance of the hearing without testimony from 9-29-2026 to 10-
20-2026
On a motion by Mr. Olivier and seconded by Mr. Whelan, the Commission voted 7-0 by roll call
vote to continue the hearing to 10/20/2026, at the applicant’s request.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Continued Public Meetings/Hearings
Notice of Intent: 21 Valleyfield Street
OpenGov Permit# CNOI-26-11, DEP #201-1392
Applicant/Property Owner: Nazar Vincent, Avatar Design & Construction (applicant), Joshua
and Rachel Riojas (property owners)
Project: Raze and rebuild of a single-family dwelling and associated site appurtenances within
the 100-foot Buffer Zone to Bordering Vegetated Wetlands.
Previous Hearing Date: 08/18/2026, 09/08/2026
Supplemental Documentation Submitted:
⎯ Stormwater Report; Locus: 21 Valleyfield St, Lexington, MA; Prepared for: Avatar
Construction; Prepared by: FODERA Engineering; Signed and Stamped by: Patrick F.
O’Reilly IV, Civil PE no. 60003; Date: 07/27/2026; Revised: 08/25/2026, 09/04/2026,
and 09/17/2026
⎯ Site Plan Set: Sheet C-1, “Existing Conditions Plan”, Sheet C-2, “Proposed Site Plan”,
Sheet C-3, “Details”; Locus: 21 Valleyfield St, Lexington, MA; Prepared for: Avatar
Design & Construction; Prepared by: Fodera Engineering; Signed and Stamped by:
David Philip Terenzoni, Civil PE no. 38720; Date: 07/27/2026; Revised: 08/10/2026,
08/25/2026, 09/04/2026, and 09/18/2026
⎯ Sheet C-1, Driveway “Visual”, Locus: 21 Valleyfield St, Lexington, MA; Prepared for:
Avatar Construction; Prepared by: FODERA Engineering; Date: 09/17/2026
⎯ Supplemental Information Memorandum; To: Lexington Conservation Commission;
From: LEC; Date: 09/21/2026
⎯ Engineering Comments 4; Date: 09/24/2026
Ms. Nicole Ferrara, LEC Environmental Consultants, presented and stated that revised plans
have been provided, reducing activity within the 50-foot buffer zone and increasing the proposed
restoration. Ms. Ferrara stated that the driveway width has been reduced to the minimum
required turnaround width. To address remaining comments from the engineering department,
Ms. Ferrara noted that the existing manhole rim will remain at its current elevation.
Mr. Beuttell stated the applicant has made efforts to address the Commission’s request to
decrease the footprint of the proposed driveway. Mr. Beuttell stated that there does not appear to
be extraordinary circumstances to permit allowing the driveway expansion within the 50-foot
buffer zone.
Mr. Olivier asked for clarity of the reasons why further reduction of the driveway would be
impracticable. Mr. Rob Paccione, project architect, stated that the owner has concerns to make
the site accessible for long-term use. The Commission asked the applicant if they wished to make
changes to the plans based on the Commission’s concerns and the applicant stated there would
be no further changes to the proposed plan.
On a motion by Mr. Hamilton and seconded by Ms. Ladd, the Commission voted 7-0 by roll call
vote to close the hearing.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Notice of Intent: 14 Barberry Road
OpenGov Permit# CNOI-26-12, DEP #201-1394
Applicant/Property Owner: Roseanna Loring and Joseph Elias
Project: Construction of a carport, deck, and patios, and associated site appurtenances within the
100-foot Buffer Zone to Bordering Vegetated Wetlands.
Previous Hearing Date: 08/18/2026, 09/08/2026
Supplemental Documentation Submitted:
⎯ Drainage Plan; Locus: 14 Barberry Road, Lexington, MA; Prepared by: Gala Simon
Associates Inc.; Signed and Stamped by: Alberto M. Gala, Civil PE No. 36434; Date:
07/28/2026; Revised: 08/13/2026, 08/26/2026, and 09/21/2026
Ms. Nicole Ferrara, LEC Environmental Consultants, presented and stated that the applicant has
revised the plans and that the deck proposed to be outside of the 50-foot buffer zone and partially
located where the existing deck is located. The landscape area beside the driveway has been
reduced to allow for two cars in the driveway and additional mitigation area is proposed.
Ms. Ladd stated she objects to the small portion of lawn extended down to the wetland line and
suggested the feno bounds be extended to cross at the 25-foot buffer zone. Mr. Olivier expressed
concern for the pavement proposed within the 50-foot buffer zone. Ms. Ferrara stated that the
driveway will be overlayed on the existing base. Mr. Beuttell stated that this proposed driveway
change would qualify as maintenance.
Ms. Ferrara stated that she will follow up with the applicant regarding the Commission’s
comments.
On a motion by Ms. Ladd and seconded by Mr. Olivier, the Commission voted 7-0 by roll call
vote to continue the hearing to 10/20/2026, at the applicant’s request.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Amendment to Order of Conditions: 4 Trotting Horse Drive
OpenGov Permit# AOOC-26-9, DEP #201-1339
Applicant/Property Owner: Arthur Chang
Project: Plan modifications including a change in the infiltration chambers and updated
stormwater management within the 200-foot Riverfront Area and the 100-foot buffer zone to
Bordering Vegetated Wetlands.
Previous Hearing Date: 09/08/2026
Supplemental Documentation Submitted:
⎯ Engineering comments via email; Date: 09/16/2026
Mr. Thomas Hughes, Hughes Environmental, presented and stated that the groundwater onsite
was found to be higher than anticipated and has resulted in the request for plan modification to
the stormwater management. Mr. Hughes stated that all comments that remain from the Town
Engineering Department have been addressed. Mr. Hughes stated that the proposed restoration
area is in the rear of the lot, outside of street view, and includes invasive species removal. Mr.
Hughes stated that the applicant is amenable to the Commission conditioning the deed in regard
to the stormwater management in perpetuity.
Mr. Jonathan Feld, 6 Trotting Horse Drive, asked where the drain easement is directing runoff to.
Mr. Hughes stated that the stormwater drains flow into a catch basin and outlets into the nearby
stream.
On a motion by Mr. Hamilton and seconded by Mr. Whelan, the Commission voted 7-0 by roll
call vote to close the hearing.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Notice of Intent: 213 East Street
OpenGov Permit# CNOI-26-17, DEP #201-1404
Applicant/Property Owner: Mallikarjun Sundaram
Project: Construction of an addition, deck and driveway, and associated site appurtenances
within the 100-foot Buffer Zone to a Freshwater Wetland.
Previous Hearing Date: 09/08/2026
Supplemental Documentation Submitted:
⎯ None
*Applicant has requested a continuance of the hearing without testimony from 9-29-2026 to 10-
20-2026
On a motion by Mr. Olivier and seconded by Ms. Ladd, the Commission voted 7-0 by roll call
vote to continue the hearing to 10/20/2026, at the applicant’s request.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Request for Determination of Applicability: 1 Lillian Road
OpenGov Permit# CDOA-26-8
Applicant/Property Owner: Nora O’Keefe, NSTAR Electric dba Eversource Energy (applicant),
Boston Edison Company, c/o Eversource Tax Department (property owner)
Project: The installation of spare autotransformer pads, exploratory test pits and soil borings in
the existing substation, within the 200-foot Riverfront Area and the 100-foot buffer zone to
Bordering Vegetated Wetlands and 100-foot buffer zone from Bordering Land Subject to
Flooding (Local Code).
Previous Hearing Date: 08/18/2026, 09/08/2026
Supplemental Documentation Submitted:
⎯ None
The Commission did not receive a continuance request or other communications from the
applicant and issued a positive determination under the bylaw.
On a motion by Mr. Olivier and seconded by Mr. Hamilton, the Commission voted 7-0 by roll
call vote to issue a positive determination under the bylaw.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Notice of Intent: 19 Peacock Farm Road
OpenGov Permit# CNOI-26-7, DEP #201-1391
Applicant/Property Owner: Susannah and Mark Castrovini
Project: Construction of an addition, driveway, stormwater management infrastructure, and other
site appurtenances within the 100-foot buffer zone to Bordering Vegetated Wetlands.
Previous Hearing Date: 08/18/2026, 09/08/2026
Supplemental Documentation Submitted:
⎯ None
*Applicant has requested a continuance of the hearing without testimony from 9-29-2026 to 10-
20-2026
On a motion by Ms. Ladd and seconded by Mr. Whelan, the Commission voted 7-0 by roll call
vote to continue the hearing to 10/20/2026, at the applicant’s request.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
New Business/Pending Matters, Continued
Request for Certificate of Compliance: 12 Ledgelawn Ave, DEP #201-1235, OpenGov CNOI-
21-32, COC-24-28, Full
Ms. Mullins stated that this site is in compliance. Ms. Mullins noted the abutting property has
recent violations including tree removal in the 200-foot Riverfront Area and a couple of these
trees were on 12 Ledgelawn Ave. The violation at the abutting property does not impact the
compliance status of this application.
On a motion by Mr. Hamilton and seconded by Mr. Olivier, the Commission voted 7-0 by roll
call vote to issue the Certificate of Compliance.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Request for Certificate of Compliance: 320 Concord Ave, DEP #201-1300, OpenGov CNOI-23-
23, AOOC-24-5, COC-26-11, Full
Ms. Mullins stated that this item is has compliance issues requiring follow up prior to issuance of
the Certificate of Compliance.
Request for Certificate of Compliance: 232 Lincoln St, DEP #201-1349, OpenGov CNOI-25-1,
COC-26-13, Partial
Ms. Mullins stated that this item is has compliance issues requiring follow up prior to issuance of
the Certificate of Compliance.
Request for Certificate of Compliance: 609-611 Massachusetts Ave, DEP #201-1281, OpenGov
CNOI-23-2, COC-26-17, Partial
Ms. Mullins stated that this item is has compliance issues requiring follow up prior to issuance of
the Certificate of Compliance.
Request for Certificate of Compliance: 18 Bacon St, DEP #201-1337, OpenGov CNOI-24-29,
COC-26-18, Full
Ms. Mullins stated that the Assistant Conservation Director Evan Paige has visited the site and
found it to be in compliance.
On a motion by Mr. Whelan and seconded by Mr. Hamilton, the Commission voted 7-0 by roll
call vote to issue the Certificate of Compliance.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
Request for Certificate of Compliance: 52 Turning Mill Rd, DEP #201-1331, OpenGov CNOI-
24-23, COC-26-19, Partial
Ms. Mullins stated that staff have not been able to visit the site yet for compliance review.
Request for Certificate of Compliance: 16 Middleby Rd, DEP #201-1382, OpenGov CNOI-25-
30, COC-26-20, Full
Ms. Mullins stated that follow up is needed for this request.
Wetland Protection Code 130 Rules, Proposed Updates Discussion
Mr. Hamilton stated that the subcommittee met in May 2026 to discuss the regulations to bring
them into conformity with the State Act. Proposed changes include revisions to the definitions
section of the regulations, to change the language of the definition of vernal pool with language
from the state definition and to include vernal pool habitat. Mr. Hamilton also stated that the
changes include reorganization of the definitions.
Ms. Ladd suggested minor grammatical edits that will be forwarded to the Commission for
review and approval.
Schedule site visits: 10/20/2026 Meeting
There will be one site visit scheduled for Monday October 19th, 2026, starting at 5:00pm.
Reports: Bike Advisory, Community Gardens, Community Preservation Committee,
Enforcement Updates, Greenway Corridor Committee, Land Acquisition, Land Management,
Land Steward Directors, Tree Committee
Mr. Whelan provided an update from the Greenway Corridor Committee (GCC) and stated that
the High School construction is obstructing trail access. The Concord Avenue parcel is waiting
on a survey.
On a motion by Mr. Hnatko and seconded by Mr. Olivier, the Commission voted 7-0 by roll call
vote to adjourn the meeting.
Record of Vote as Follows:
Kevin Beuttell – Aye
Hope Dehmlow Dunne – Aye
Philip Hamilton – Aye
Jason Hnatko – Aye
Ruth Ladd – Aye
Thomas Olivier – Aye
Thomas Whelan – Aye
9:30pm
Respectfully Submitted,
Megan Guardado
LUHD Department Assistant
Approved: 10/20/2026
Archived: 10/26/2026