Loading...
HomeMy WebLinkAbout2559 Letter, Aspinwall & Lincoln, Civil Engineers, to James S. Munroe, Esq., concerning cost of laying a drain in Forest Street, November 25, 1890 A'SPINWALL & LINCOLN, CIVIL ENGINEERS, T uomAS.ASPINWALL. E+DWIN II. LINCOLN. 12 PEARL STREET, UUUAAA J BOSTON a1"9 Boston, ITov. 2.5th. 1890. James S. Munroe, Esq, Dear Sir; Our estimate of cost of laving proposed drain in Forest Street, Lexington, is as follows: For a 10 inch pipe from 'Olen-a''s rouse on extension of Forest Street to- centre of Muzze,v Street., thence through the gindge land a 12 inch pipe to Vine Brook, �400. 00 For a 10 inch pipe in street,enterIna Vine Brook through 12 inch pipe as above, but starting' at school house drain, - 355. 00 Por a 10 inch gripe fronj Mean's house to, present 12 inch drain, including cost of lo*ering 12 inch pi-ce, $350.00 Tor 10 inch pion from school house drain to present 12 inch pibe i-ncludinq cost of lowerina 1?. inch pioe, In the above the cost of trenching' is taken at about 25 cents per foot and cost of p}pe 80M off of list price. The cost- of 8 inch oiue xould be about eight cents per foot less than for 10 inch or a difference of about $24 in the last estimate. Yours truly, r/ 3 T a5cy