HomeMy WebLinkAbout2026-08-18-ConCom-min.pdf Meeting broadcasted by LexMedia PUBLIC MEETING MINUTES Conservation Commission ___________________________________________________________________________ AGENDA Tuesday, August 18th, 2026, 6:30 p.m. This Conservation Commission meeting was held remotely via Zoom, an online meeting platform. Public participation via calling in or using a computer was encouraged. Commissioners Present: Kevin Beuttell (Acting Chair), Philip Hamilton, Jason Hnatko, Ruth Ladd (joined late), Thomas Olivier and Thomas Whelan; Not Present: Hope Dehmlow Dunne Staff Present: Karen Mullins, Conservation Director, and Megan Guardado, Department Assistant; 6:30 PM New Business/Pending Matters MWRA, Maple St Enforcement Update and Restoration Plan Review and issue Amended Enforcement Order if ready Mr. Alejandro Alvarez, Construction Coordinator for MWRA, was present for the discussion and Mr. Anthony Damiano, GZA, presented a proposed mitigation plan including the planting of tree species, shrubs, and herbaceous plugs. Three trees were removed along the edge of Maple Street which will be replaced by six trees. In area two on the mitigation plan presented, wetland seed mix is proposed for installation, and exposed slopes will be restored with erosion control matting as well. In area three, material is proposed to be pulled back with an excavator and an upland conservation seed mix and erosion control barrier are both proposed for installation. Mr. Beuttell asked if MWRA would agree to clean the construction debris within restoration areas two and three of the plan. Mr. Alvarez stated that MWRA will clean up the debris. Mr. Olivier asked about the slope of the road which is sloping towards the wetlands and if storm drains will capture the runoff from these slopes. Mr. Alvarez stated that the road will be brought back to the road’s original grade prior to the start of work. Mr. Whelan asked if GZA will oversee the monitoring of the restoration areas. Mr. Damiano stated that GZA will be monitoring the beginning stages of planting activities and will check in with MWRA in the future as well. Mr. Damiano also stated that they will not begin planting until the fall. Mr. Beuttell stated that the Commission has a standard monitoring period of three years. On a motion by Mr. Hamilton and seconded by Mr. Whelan, the Commission voted 4-0 by roll call vote to issue an Amended Enforcement Order including the clean up between restoration areas two and three, the narrow band along the street, erosion control installation on steep slopes, three years of restoration monitoring, and restoration plantings to begin in Fall 2026. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Thomas Olivier – Abstain Thomas Whelan – Aye 25 Maple St Restoration Plan Review and Issue Enforcement Order Ms. Nicole Ferrara, LEC Environmental, stated that LEC has met onsite with the Commission and has since submitted a restoration plan for review. Ms. Ferrara presented the additional restoration plan which includes restoration of the entire portion of the 100-foot buffer zone that was disturbed. Any invasive species within the footprint of the planting area will be hand pulled prior to installing restoration plants. Mr. Beuttell stated that the disturbance area on the town owned parcel appeared to extend beyond the flags onsite and the plan should be updated accordingly. Ms. Ferrara stated that she will confirm this update with the surveyor. Mr. Whelan asked if the fill close to Maple Street is included in the plans presented. Ms. Ferrara stated that the fill in question is outside of the 100-foot buffer zone and not included on the plan that was presented. Mr. Hamilton asked if the restoration plan has been superimposed onto the plan for development. Ms. Ferrara stated that this has not been done yet and that the Notice of Intent will be submitted within the next month. On a motion by Mr. Hnatko and seconded by Mr. Hamilton, the Commission voted 6-0 by roll call vote to issue Enforcement Order with the extension of the area of disturbance on the town- owned parcel by ten feet. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd– Aye Thomas Olivier – Aye Thomas Whelan – Aye 231 Bedford St Enforcement Discussion Ms. Mullins stated that the Commission recently approved a pavement project onsite through an RDA and work has been ongoing onsite associated with the front steps and a retaining wall. Ms. Mullins stated that work has stopped on the site. Mr. Beuttell stated that there is an increase in impervious surface within the 200-foot Riverfront Area which requires stormwater management if the work results in an increase of over 100 square feet of impervious surface. Ms. Ladd asked how much impervious surface was added as a result of the removal of one tree in the front. Mr. Odilon Rodrigues, P&O Realty LLC, stated that the area that was previously open is less than 100 square feet. Ms. Paula Caico, P&O Realty, stated that the walkway is pre- existing and that the material is proposed to be changed. Mr. Beuttell stated that under the bylaw, removing and replacing the materials of the walkway makes this area be considered as new rather than pre-existing. Ms. Ladd stated that the Commission approved the repaving of the lot and noted that no other exterior work should be done onsite without approval from the Commission. Ms. Ladd stated that an enforcement order should be issued prior to review of the additional work. Ms. Caico stated that the retaining wall had collapsed and work had begun without approval due to concerns for safety with the collapsed wall onsite. Ms. Mullins noted that the owners previously mentioned installing a ramp as well and that they would wait to begin pavement work until the ramp is installed. Ms. Caico stated that the asphalt paving needs to be completed sooner due to safety concerns. Ms. Mullins noted that the pre- construction meeting should be scheduled to permit the paving to begin. The Commission agreed the front ramp should be included in the approval for the retaining wall and walkway. Ms. Ladd stated that a surveyed plan would be needed. Mr. Beuttell stated that engineering details are needed to prove the proposed site work meets the Commission’s performance standards. On a motion by Ms. Ladd and seconded by Mr. Olivier, the Commission voted 6-0 by roll call vote to issue Enforcement Order. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd– Aye Thomas Olivier – Aye Thomas Whelan – Aye 7:00 PM New Public Meetings/Hearings Request for Determination of Applicability: 1 Lillian Road OpenGov Permit# CDOA-26-8 Applicant/Property Owner: Nora O’Keefe, NSTAR Electric dba Eversource Energy (applicant), Boston Edison Company, c/o Eversource Tax Department (property owner) Project: The installation of spare autotransformer pads, exploratory test pits and soil borings in the existing substation, within the 200-foot Riverfront Area and the 100-foot buffer zone to Bordering Vegetated Wetlands and 100-foot buffer zone from Bordering Land Subject to Flooding (Local Code). Documentation Submitted: ⎯ WPA Form 1 – Request for Determination of Applicability; Locus: 1 Lillian Rd, Lexington, MA; Prepared for: NSTAR Electric d/b/a Eversource Energy; Property owner: Boston Edison Company, c/o Eversource Tax Dept.; Prepared by: Greg Hochmuth, Epsilon Associates, Inc.; Date: 7/06/2026 ⎯ Sta. 351 Wetland Delineation Plan; Prepared by: Epsilon Associates Inc.; Prepared for: Eversource Energy; Scale: 1” = 50’; Date: 04/28/2026 ⎯ Memorandum: To: Lexington Conservation Commission; From: Greg Hochmuth, Epsilon Associates, Inc.; Date: 07/07/2026 ⎯ Site Photos; Locus: Station 351, 1 Lillian Road, Lexington, MA; Date: 03/26/2026 ⎯ Bordering Vegetated Wetland Determinations Forms; Locus: 1 Lillian Rd, Lexington, MA; Prepared by: Greg Hochmuth and Jonathan Chidekel; Date: 03/26/2026 Mr. Greg Hochmuth, Epsilon Associates, presented and stated that an updated plan has been submitted with the accurate floodplain elevation of 163.2 and the substation rests at an elevation of 165. Mr. Hochmuth stated that Eversource is proposing to do exploratory test pits to install seven concrete paths on top of existing stone and gravel within the fenced portion of the substation. The paths would store spare auto transformers for emergency use. Vegetation is proposed to remain as is with no removal. The applicant is requesting a waiver for the application to be accepted without a new survey and delineation being done as the last survey was done in 2021. The work results in 833 square feet of new concrete paths and the applicant has also requested a waiver from drainage calculations requirements. Mr. Hochmuth stated that there is no grading proposed within the work area Mr. Beuttell stated that the Commission has not had time to review the updated materials as they were submitted hours prior to the meeting and the Commission will need time to review the waiver request prior to discussing. Ms. Mullins stated that the Commission has yet to waive stormwater management requirements for any applicant. Mr. Hnatko asked if the transformers would be dry or store oil and what are their plans to prevent oil spills. Mr. Hochmuth stated the transformers will have oil and there will be oil barriers placed beneath the transformers. Ms. Mullins stated that similar projects in the past have been done with trenching and without detailed drainage. Mr. Hochmuth agreed to consider adding trenching to address stormwater drainage. On a motion by Ms. Ladd and seconded by Mr. Whelan, the Commission voted 6-0 by roll call vote to continue the hearing to 9/8/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd– Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 19 Peacock Farm Road OpenGov Permit# CNOI-26-7, DEP #201-1391 Applicant/Property Owner: Susannah and Mark Castrovini Project: Construction of an addition, driveway, stormwater management infrastructure, and other site appurtenances within the 100-foot buffer zone to Bordering Vegetated Wetlands. Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: 19 Peacock Farm Road, Lexington, MA; Prepared for: Susannah and Mark Castrovinci; Prepared by: Nathanial Cataldo, Stamski and McNary, Inc.; Date: 06/22/2026 ⎯ Notice of Intent Packet; Locus: 19 Peacock Farm Rd, Lexington, MA; Prepared for: Susannah and Mark Castrovinci; Prepared by: Stamski and McNary, Inc.; Date: 07/06/2026 ⎯ Plan Set: Sheet 1, “Stormwater Management Plan”, Sheet 2, “Construction Details”; Locus: 19 Peacock Farm Rd, Lexington, MA; Prepared for: Susannah Ford Castrovinci; Prepared by: Stamski and McNary, Inc.; Signed and Stamped by: George Dimakarakos, Civil PE No. 41281; Scale: 1” = 10’; Date: 07/06/2026 ⎯ Stormwater Management Report; Locus: 19 Peacock Farm Road, Lexington, MA; Prepared for: Susannah Castrovinci; Prepared by: Stamski and McNary, Inc.; Signed and Stamped by: George Dimakarakos, Civil PE No. 41281; Date: 07/06/2026; Revised: 08/06/2026 ⎯ Bordering Vegetated Wetlands Determination Form; Locus: 19 Peacock Farm Rd, Lexington, MA; Prepared by: David Crossman, B&C Associates, inc.; Date: 04/09/2026 Mr. Paul Kirchner, Stamski and McNary, presented the site plans and stated that there is current disturbance within the 100-foot buffer zone including portions of the existing dwelling, existing patio, shed and lawn area. Mr. Kirchner stated that the addition is proposed to create a garage space and additional living area. A subsurface chamber area is proposed for capturing and treating stormwater. Ms. Ladd noted that there is a swing set currently within the wetlands onsite and asked that the plan be updated to include all of the trees proposed for removal. Ms. Ladd also noted that the limit of work line proposed could be reduced. Ms. Mullin noted that the test pit done closer to the road onsite was one foot higher than the test pits near the wetlands. Ms. Mullins also asked if the subsurface infiltration system could be relocated further from the wetlands and if the existing patio would be reconstructed. Ms. Mullins noted that the Tree Bylaw would be applicable to this project. Mr. Kirchner stated that the patio is proposed to remain as is. On a motion by Mr. Hamilton and seconded by Mr. Hnatko, the Commission voted 6-0 by roll call vote to continue the hearing to 9/8/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd– Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 46 Turning Mill Road OpenGov Permit# CNOI-26-8, DEP #201-1396 Applicant/Property Owner: Vivian Wu (applicant), Sara Curley, Trustee of Forty-Six TMR Realty Trust (property owner) Project: Removal of invasive species and installation of native restoration plantings, within a Bordering Vegetated Wetland and within the 100-foot Buffer Zone to Bordering Vegetated Wetlands. Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: 46 Turning Mill Rd, Lexington, MA; Prepared for: Vivian Wu; Property Owner: Sara Curley, Trustee of Forty-Six TMR Realty Trust; Prepared by: Daniel Bender. Wilderscaping LLC; Date: 07/02/2026 ⎯ Resource Area Enhancement Plan; Locus: 46 Turning Mill Rd, Lexington, MA; Prepared for: Vivian Wu; Prepared by: Goddard Consulting, LLC; Date: 05/01/2026 ⎯ Resource Area Enhancement Planting Plan; Locus: 46 Turning Mill Rd, Lexington, MA; Prepared by: Goddard Consulting; Date: 05/01/2026 ⎯ Proposed Site Plan; Locus: 46 Turning Mill Rd, Lexington, MA; Prepared by: LeBlanc Survey Associates, Inc.; Signed and Stamped by: Vernon J. LeBlanc, PLS no. 33600; Date: 08/26/2021 ⎯ Notice of Intent to Initiate an Ecological Restoration Limited Project; To: Environmental Monitor; From: Wilderscaping, LLC; Date: 05/29/2026 ⎯ Addendum to Notice of Intent; Date: 08/14/2026 Mr. Anthony Gee, Goddard Consulting, Mr. Dan Bender, Wilderscaping, and Ms. Vivian Wu, owner of 46 Turning Mill Road, were all present for the hearing. Mr. Gee stated that the homeowner is seeking approval for restoration work onsite and management of invasive species on site. There are eleven total species of invasives onsite are proposed to be managed through hand pulling or herbicides. Mr. Gee stated that the applicant is proposing to plant 41 native shrubs and 19 native trees. Mr. Bender noted that smaller stems may be extracted and cut stem applications is proposed on larger stems to reduce disturbance to the buffer zone. The Commission had no questions, and Mr. Beuttell noted the Commission is in favor of ecological restoration work. On a motion by Mr. Hamilton and seconded by Mr. Hnatko, the Commission voted 6-0 by roll call vote to close the hearing. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd– Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 55 Ivan Street OpenGov Permit# CNOI-26-9, DEP #201-1393 Applicant/Property Owner: Fernando Dalfior, 55 Ivan Street LLC Project: Raze and rebuild of a single-family dwelling and associated site appurtenances within the 100-foot Buffer Zone to a Bordering Vegetated Wetland and an Isolated Vegetated Wetland (Local Code). Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: 55 Ivan St, Lexington, MA; Prepared for: Fernando Dalfior, 55 Ivan Street LLC; Prepared by: Nicole Ferrara, LEC Environmental Consultants, Inc.; Date: 07/27/2026 ⎯ Notice of Intent Application and Wetland Resource Area Analysis; Locus: 55 Ivan St, Lexington, MA; Prepared for: Fernando Dalfior, 55 Ivan Street LLC; Prepared by: LEC Environmental Consultants, Inc.; Date: 07/28/2026 ⎯ Stormwater Analysis and Calculations; Locus: 55 Ivan St, Lexington, MA; Prepared by: Patriot Engineering; Signed and Stamped by: Michael J. Novak, Civil PE no. 50696; Date: 07/17/2026 ⎯ Operation and Maintenance Plan; Locus: 55 Ivan St, Lexington, MA; Prepared by: Patriot Engineering; Date: 07/17/2026 ⎯ Wetland & Buffer Zone Restoration Planting Plan; Locus: 55 Ivan St, Lexington, MA; Prepared by: LEC Environmental Consultants, Inc.; Date: 07/23/2026 ⎯ Site Plans: Sheet 1, “Proposed Site Plan”, Sheet 2, “Site Details”; Locus: 55 Ivan St, Lexington, MA; Prepared for: Dalfior Development; Prepared by: Patriot Engineering; Signed and Stamped by: Michael J. Novak, Civil PE no. 50696; Date: 07/17/2026 ⎯ Drain Area Map; Locus: 55 Ivan St, Lexington, MA; Prepared for: Dalfior Development; Prepared by: Patriot Engineering; Date: 07/17/2026 ⎯ Engineering Comments; Date: 08/13/2026 Ms. Nicole Ferrara, LEC Environmental Consultants, presented the site’s existing conditions and stated that the proposal includes razing and rebuilding a single-family dwelling. The amount of impervious surface within the 50-foot buffer zone is proposed to decrease by 7 square feet and the proposed dwelling will be 14.4 feet further from the wetlands than the existing dwelling. Ms. Ferrara noted there will be a temporary disturbance of grading within the 25-foot buffer zone. Ms. Ferrara also stated that the entire 25-foot buffer zone is proposed to be restored with native vegetation. Mr. Beuttell stated that the slope of the pervious paver driveway is over 6% and asked the project engineer to speak to this and the subgrade work. Mr. Mike Novak, Patriot Engineering, stated that the driveway could be terraced. Mr. Beuttell asked how the engineer verifies that the infiltration system has been installed correctly. Mr. Novak stated that he observes the installation of subsurface systems and that he runs a water test after installation. Mr. Beuttell asked for photographic documentation of the installation. Mr. Olivier asked if alternatives were explored to build outside of the 50-foot no build zone and why they were deemed impracticable. Ms. Ferrara stated that much of the buildable portion of the lot falls within the 50-foot buffer zone. Mr. Novak stated that the required minimum front yard setback is 30 feet. Ms. Meng Yang, 60 Ivan Street, asked for clarification on the direction in which stormwater runoff is directed as the Stormwater Narrative states the existing runoff is towards the northern property line and the HydroCAD analysis shows the direction as the southern property line. Ms. Yang also asked the applicant to clarify if work is proposed within the 25-foot buffer zone. Mr. Novak stated that the discrepancy regarding stormwater runoff direction was a writing error and that the Isolated Wetland in the northern portion of the lot was captured as the design point. Mr. Novak also stated that the infiltration system proposed does not have an overflow and that emergency overflow is proposed at one of the downspouts. Ms. Ferrara stated that there will be temporary work in the 25-foot buffer zone, which is site grading, that will be restored and that the 25-foot buffer zone area will be protected in perpetuity and restored with native vegetation. Mr. Fernando Dalfior, Dalfior Development, stated that the proposed plans were modified after learning about the wetlands onsite. Mr. Dalfior stated that the width of the proposed house is 47 feet, which is considered narrow for new construction. Mr. Paul O’Shaughnessy, 61 Ivan Street, expressed concern for silt going into the Isolated Wetland during construction and concern that water will be redirected towards neighboring properties including his own. Mr. O’Shaughnessy noted the Isolated Wetland fills with water in the spring. Ms. Ferrara stated that erosion control measures are proposed including a compost filled sock that would prevent sediment runoff. On a motion by Mr. Hamilton and seconded by Ms. Ladd, the Commission voted 6-0 by roll call vote to close the hearing. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd– Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 162 Grove Street OpenGov Permit# CNOI-26-10, DEP #201-1395 Applicant/Property Owner: Charlie Minasian, Minasian Investments Project: Raze and rebuild of a single-family dwelling and associated site appurtenances within the 100-foot Buffer Zone to Bordering Vegetated Wetlands. Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: 162 Grove St, Lexington, MA; Prepared for: Charlie Minasian, Minasian Investments; Prepared by: Nicole Ferrara, LEC Environmental Consultants; Date: 07/27/2026 ⎯ Notice of Intent Application and Wetland Resource Area Analysis; Locus: 162 Grove St, Lexington, MA; Prepared for: Charlie Minasian, Minasian Investments; Prepared by: LEC Environmental Consultants, Inc.; Date: 07/28/2026 ⎯ Stormwater Analysis and Calculations; Locus: 162 Grove St, Lexington, MA; Prepared by: Patriot Engineering; Signed and Stamped by: Michael J. Novak, Civil PE no. 50696; Date: 07/20/2026 ⎯ Operation and Maintenance Plan; Locus: 162 Grove St, Lexington, MA; Prepared by: Patriot Engineering; Date: 07/20/2026 ⎯ Wetland & Buffer Zone Restoration Planting Plan; Locus: 162 Grove St, Lexington, MA; Prepared by: LEC Environmental Consultants, Inc.; Date: 07/24/2026; Revised: 08/11/2026 ⎯ Site Plans: Sheet 1, “Proposed Site Plan”, Sheet 2, “Site Details”; Locus: 162 Grove St, Lexington, MA; Prepared for: Minasian Investments; Prepared by: Patriot Engineering; Signed and Stamped by: Michael J. Novak, Civil PE no. 50696; Date: 07/20/2026; Revised: 8/7/2026 ⎯ Drain Area Map; Locus: 162 Grove St, Lexington, MA; Prepared for: Minasian Investments; Prepared by: Patriot Engineering; Date: 07/20/2026 ⎯ Engineering Comments; Date: 08/13/2026 Ms. Nicole Ferrara, LEC Environmental Consultants, presented and stated that there is a forested wetland on the parcel that continues offsite onto town owned land. The applicant is proposing a raze and rebuild of a single-family home, a paved driveway with a pervious paver edge, a pervious patio, and a three-foot high retaining wall with a set of stairs. Ms. Ferrara also noted that the existing shed within the 25-foot buffer zone will be removed. The proposed dwelling is located outside of the 50-foot buffer zone, and two trees are proposed for removal. Ms. Ferrara stated that 1,960 square feet of lawn is proposed to be restored to native plantings and removal of the Japanese knotweed onsite prior to restoration plantings is also proposed. Mr. Beuttell asked for clarity on the proposed design of the retaining wall. Mr. Mike Novak, Patriot Engineering stated that detail was not included in the plan submitted, the existing stone wall will be left as is and the proposed wall is anticipated to be a landscaping wall. Ms. Ladd asked what the proposed method of removal for the invasive species is. Ms. Ferrara stated that they have proposed a few methods including cut and stem treatment, if necessary, along with herbicide treatment. Mr. Whelan stated that foliar cut stem herbicides are most effective and will require multiple applications. Mr. Olivier asked for clarity on what the area labeled “stone area below drive” on the plan is referring to. Mr. Novak stated that this section will be the stone that is mitigating the driveway. Mr. Beuttell expressed concerns for the design of the drive and stated that he would like to see porous surface over the stone area. Mr. Novak stated that the stone area can be made porous as well. On a motion by Mr. Olivier and seconded by Mr. Hnatko, the Commission voted 6-0 by roll call vote to close the hearing. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Ruth Ladd– Aye Thomas Olivier – Aye Thomas Whelan – Aye Notice of Intent: 21 Valleyfield Street OpenGov Permit# CNOI-26-11, DEP #201-1392 Applicant/Property Owner: Nazar Vincent, Avatar Design & Construction (applicant), Joshua and Rachel Riojas (property owners) Project: Raze and rebuild of a single-family dwelling and associated site appurtenances within the 100-foot Buffer Zone to Bordering Vegetated Wetlands. Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: 21 Valleyfield St, Lexington, MA; Prepared for: Nazar Vincent, Avatar Design & Construction; Property Owner: Joshua and Rachel Riojas; Prepared by: Nicole Ferrara, LEC Environmental Consultants; Date: 07/27/2026 ⎯ Notice of Intent Application and Wetland Resource Area Analysis; Locus: 21 Valleyfield St, Lexington, MA; Prepared for: Nazar Vincent, Avatar Design & Construction; Owners: Joshua and Rachel Riojas; Prepared by: LEC Environmental Consultants, Inc.; Date: 07/28/2026 ⎯ Stormwater Report; Locus: 21 Valleyfield St, Lexington, MA; Prepared for: Avatar Construction; Prepared by: FODERA Engineering; Signed and Stamped by: Patrick F. O’Reilly IV, Civil PE no. 60003; Date: 07/27/2026 ⎯ Operation and Maintenance Plan; Locus: 21 Valleyfield St, Lexington, MA; Prepared by: Fodera Engineering; Date: 07/23/2026 ⎯ Buffer Zone Restoration & Enhancement Planting Plan; Locus: 21 Valleyfield St, Lexington, MA; Prepared by: LEC Environmental Consultants, Inc.; Date: 07/27/2026; Revised: 08/11/2026 ⎯ Site Plan Set: Sheet C-1, “Existing Conditions Plan”, Sheet C-2, “Proposed Site Plan”, Sheet C-3, “Details”; Locus: 21 Valleyfield St, Lexington, MA; Prepared for: Avatar Design & Construction; Prepared by: Fodera Engineering; Signed and Stamped by: David Philip Terenzoni, Civil PE no. 38720; Date: 07/27/2026; Revised: 08/10/2026 Ms. Nicole Ferrara, LEC Environmental Consultants, presented the existing and proposed site conditions and stated that the existing lawn edge extends into the wetlands, and the existing dwelling is within the 50-foot buffer zone. Ms. Ferrara stated that the proposal includes demolition of the existing dwelling, construction of a new dwelling, and removal of all impervious surface within the 25-foot buffer zone. The applicant proposes to increase the area of natural vegetation within the wetland buffer zone. Mr. Beuttell asked for clarity on the total square footage of the existing natural vegetation within the wetland buffer. Ms. Ferrara stated that she will verify how this area was calculated and confirm the total square footage of existing natural vegetation. Ms. Ferrara stated that the Engineering Department has provided comments regarding the location of the three geothermal wells proposed and the applicant will be following up with a revised plan. A restoration planting plan has been provided which includes restoration of all existing lawn within the wetland and the 25-foot buffer zone with native shrubs and native seed mix. Mr. Beuttell expressed concern for the total amount of impervious surface due to driveway paving proposed within the 50-foot buffer zone. Mr. Olivier stated that based on the size and shape of the lot, it would be impracticable to move the dwelling outside of the 50-foot buffer zone. Mr. Olivier also asked for clarity on the roof overhang and gutter width proposed. Mr. Patrick O’Reilly, Fodera Engineering, stated that the question of the gutter width would need to be addressed by the architect. Mr. Nazar Vincent, Avatar Construction, stated that the town requirement is five inches for the gutter width. Ms. Mullins stated the engineer should research the guidance for deep well requirements as she believes the set back is ten feet per state regulations rather than the proposed five feet. On a motion by Mr. Hamilton and seconded by Mr. Whelan, the Commission voted 5-0 by roll call vote to continue the hearing to 9/8/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Thomas Olivier – Aye Thomas Whelan – Aye *Commissioner Ruth Ladd left the meeting during this hearing and did not vote. Notice of Intent: 14 Barberry Road OpenGov Permit# CNOI-26-12, DEP #201-1394 Applicant/Property Owner: Roseanna Loring and Joseph Elias Project: Construction of a carport, deck, and patios, and associated site appurtenances within the 100-foot Buffer Zone to Bordering Vegetated Wetlands. Documentation Submitted: ⎯ WPA Form 3 – Notice of Intent; Locus: 14 Barberry Road, Lexington, MA; Prepared for: Roseanna Loring and Joseph Elias; Prepared by: Nicole Ferrara, LEC Environmental Consultants; Date: 07/28/2026 ⎯ Notice of Intent Application and Wetland Resource Area Analysis; Locus: 14 Barberry Road, Lexington, MA; Prepared for: Roseanna Loring and Joseph Elias; Prepared by: LEC Environmental Consultants, Inc.; Date: 07/28/2026 ⎯ Engineering Drainage Calculations; Locus: 14 Barberry Road, Lexington, MA; Prepared by: Gala Simon Associates, Inc.; Signed and Stamped by: Alberto M. Gala, Civil PE No. 36434; Date: 07/15/2026 ⎯ Operation and Management of Drainage Systems; Locus: 14 Barberry Road, Lexington, MA; Site Operator: Roseanna Loring; Prepared by: Gala Simon Associates, Inc.; Date: 07/15/2026 ⎯ Buffer Zone Restoration & Enhancement Planting Plan; Locus: 14 Barberry Road, Lexington, MA; Prepared by: LEC Environmental Consultants, Inc.; Date: 07/24/2026 ⎯ Drainage Plan; Locus: 14 Barberry Road, Lexington, MA; Prepared by: Gala Simon Associates Inc.; Signed and Stamped by: Alberto M. Gala, Civil PE No. 36434; Date: 07/28/2026 ⎯ Engineering Comments; Date: 08/14/2026 Ms. Nicole Ferrara, LEC Environmental Consultants, presented the existing conditions and stated that an additional flag has been added to the plan and the buffer zones have been revised accordingly. The proposal includes a carport to be constructed on concrete slab and the expansion of the driveway to extend to the carport. Ms. Ferrara also stated that a second-story deck is proposed off the rear of the garage and that existing deck will be removed and replaced with a spiral staircase. Nine pine trees are proposed for removal and tree replacement is proposed within the mitigation planting plan. There are two infiltration systems proposed to provide stormwater management Mr. Beuttell asked for clarity on the reasoning for driveway pavement past the proposed carport. Mr. Lee Dykxhoorn, project architect, stated that the pavement past the carport is to serve as a turnaround point for cars. Mr. Beuttell stated that the turnaround extends roughly 30 feet past the carport, which exceeds the area needed for a turnaround. Mr. Dykxhoorn stated that the extended pavement is pre-existing and they could review this to make changes to the plan. Mr. Beuttell also stated that deep well injection regulations apply to this property as well and there should be a 10-foot offset from structures and that tree protection should be revised on the plan to comply with the Tree Bylaw. Mr. Olivier stated the proposed deck being extended into the no-build zone does not meet the Commission’s regulations. Ms. Ferrara stated the applicant is requesting a waiver for the deck to be built within the no-build buffer zone including extensive restoration work and that the alternatives are limited for the purposes of a deck. On a motion by Mr. Hnatko and seconded by Mr. Whelan, the Commission voted 5-0 by roll call vote to continue the hearing to 9/8/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Thomas Olivier – Aye Thomas Whelan – Aye Continued Public Meetings/Hearings Notice of Intent: 114 Wood Street OpenGov Permit# CNOI-26-5, DEP #201-1389 Applicant/Property Owner: Scott Seaver, Seaver Construction / Angelo and Marianne Tortola Project: Demolition of a single-family dwelling and associated site appurtenances, the construction of a multi-family residential development and associated access road, parking, utilities, grading, and other site appurtenances within the 100-foot buffer zone to Bordering Vegetated Wetlands, an Isolated Vegetated Wetland, Isolated Land Subject to Flooding, and Vernal Pool Habitat. Previous Hearing Dates: 4/14/2026, 4/28/2026 (no testimony), 5/19/2026 (no testimony), 6/9/2026, 7/14/2026, 7/28/2026 (no testimony) Supplemental Documentation Submitted: ⎯ Shallow UIC Class V Injection Well to Water Supply Line Setback Requirements Email; To: Karen Mullins; From: Michael Carter; Date: 07/15/2026 ⎯ Standard Design Guidelines for Shallow UIC Class V Injection Wells; Prepared by: The Executive Office of Energy and Environmental Affairs; Date: 04/06/2016 ⎯ Memorandum: To: Water Division Directors, Regions 1-10; From: Linda Boornazian, Director, Water Permits Division (MC 4203M), and Steve Heare, Director, Drinking Water Protection Division (MC 4606M); Subject: Clarification on which stormwater infiltration practices/technologies have the potential to be regulated as “Class V” wells by the Underground Injection Control Program; Date: 06/13/2008 ⎯ Offsite Stormwater Analysis; Locus: 114 Wood St, Lexington, MA; Prepared by: Frederick W. Russell, Jr, Civil PE No. 36713; Date: 07/21/2026 ⎯ 114 Wood Street Special Residential Development Plans: Sheet 1, “Locus Context Plan:, Sheet 2, “Existing Conditions”, Sheet 3, “Site Analysis Map”, Sheet 4, “Erosion Control Plan”, Sheet 5, “Property Rights Plan”, Sheet 6, “Proposed Site Layout”, Sheet 7, “Site Construction Plan”, Sheet 8, “Site Construction Plan I”, Sheet 9, “Site Construction Plan II”, Sheet 10, “Utilities Plan & Profile”, Sheet 11, “Construction Details I”, and Sheet 12, “Construction Details II”; Locus: 114 Wood St, Lexington, MA; Prepared for: Seaver Construction; Prepared by: Keenan Survey; Signed and Stamped by: Frederick W. Russell, Jr, Civil PE No. 36713; Date: 03/12/2026; Revised: 06/30/2026, 07/21/2026, and 08/08/2026 ⎯ Landscaping Plan Set: Sheet 9, “Landscape Plan I”, Sheet 10, “Landscape Plan II”, Sheet 11, “Landscape Details”; Prepared for: Seaver Properties LLC; Prepared by: Laurie Tarr Ellsworth, Landscape Architecture, LLC; Date: 08/26/2025; Revised: 07/12/2026 and 07/21/2026 ⎯ Buffer Zone Mitigation & Restoration Planting Plan; Locus: 114 Wood St, Lexington, MA; Prepared by: LEC Environmental Consultants, Inc.; Date: 07/22/2026; Revised: 08/07/2026 ⎯ Steep Slopes Package Memorandum: To: Karen Mullins; From: Fred Russell; Subject: 114 Wood Street -steep slopes; Date: 06/30/2026 ⎯ 114 Wood Street, Special Residential Development – Work in Steep Slopes: Final Memorandum: To: Karen Mullins; From; Frederick W. Russell, PE; Date: 08/06/2026 ⎯ 2nd Peer Review Memorandum: To: Abby McCabe, Planning Director; From: Michael J. Carter, GCG Associates, Inc.; Subject: 114 Wood Street, Special Residential Development, Lexington, Massachusetts, Planning Board Site Plan & Wetlands Protection 2nd. Peer Review.; Date: 08/07/2026 Mr. Rich Kirby, LEC Environmental Consultants, presented and stated that information regarding steep slope onsite has been prepared by the project engineer and provided to the Commission. The planting plan has been revised to eliminate plantings within the vernal pool buffer zone that is not currently compost piled. Mr. Kirby also noted that an additional page has been added to the planting plan regarding management of invasive species onsite by hand and the cut and stem method. The applicant expressed intent to continue the hearing until after the Planning Board closes their hearing for this project to ensure no additional plan changes are requested. Mr. Beuttell asked if there is an alternative to pesticide use within the vernal pool habitat buffer zone and what the potential risks are with the proposed targeted herbicide use. Mr. Kirby stated that Roundup would be the most beneficial to the invasives removal efforts onsite, but the applicant can remove this from the proposal if requested by the Commission. Mr. Kirby stated that it is his understanding that the herbicide would be applied by paintbrush during dry weather conditions and any material that could run off would bind chemically with the soil and become inert. Mr. Beuttell stated that the project engineer’s steep slopes letter only addressed one of the two steep slopes onsite and did not address the steep slope in the entrance area. Mr. Fred Russell stated that there was a man-made mound at the entrance that the applicant plans to flatten. A certified herbicide applicator will do the targeted herbicide treatment. Mr. Whelan stated that Conservation Department of the Native Plant Trust recommends the cut stem method with herbicide treatment and does not recommend mechanical methods for long-term success. Mr. Olivier asked if herbicide use is being proposed near the vernal pool. Mr. Kirby presented the restoration plan and the area in which invasives removal is proposed within the vernal pool habitat. Ms. Margie Brown, Minuteman National Historical Park, expressed concern that a letter dated July 27th is not visible in the record. Ms. Mullins stated that public comments cannot be deleted from the record and this comment letter is within the Commission’s records for this application. Ms. Mullins noted that the letter appears not to be in the OpenGov system at the time of this meeting but is included in the records of this application. Ms. Brown expressed concern for the inclusion of a trail on the proposed plans. Ms. Mullins stated that the trail connection has been on the West Lexington Master Plan that started in 2009 with the purpose of connecting all of the town resource north to south. Ms. Mullins also noted that the path can stay off of the National Park Service property and the details of the layout of the trail can be completed as a requirement of the Order of Conditions. The applicant will keep the National Park Service informed to final plans for the trail. Ms. Janet Lane, 21 Hayward Avenue, expressed concern that the path along the stonewall onsite is unsafe and stated that the “no trespassing” signs were put up during the Covid-19 Pandemic by the landowner. Ms. Lane also noted that the distance from the stone wall to the water varies depending on weather conditions. Mr. Ohmart stated that revised version of the proposed path was submitted to go underneath the easement. The details of the path will be determined in the future with the consideration of the National Park Services as well. On a motion by Mr. Hamilton and seconded by Mr. Hnatko, the Commission voted 5-0 by roll call vote to continue the hearing to 10/20/2026, at the applicant’s request. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Thomas Olivier – Aye Thomas Whelan – Aye New Business/Pending Matters, Continued Comments on City of Waltham ZBA Petition for Variance: 50 Wimbledon Circle Ms. Mullins stated that the city of Waltham Zoning Board of Appeals (ZBA) received a variance request for a property directly abutting land owned by Lexington Conservation. There has been an encroachment onto the conservation owned land in the form of maintenance as lawn. Ms. Mullins recommended the Commission submit comments to the Waltham ZBA regarding the encroachment and that they include a condition of approval to cease encroachment and maintenance of conservation property. Mr. Olivier asked if the Commission would ask for fencing or any form of demarcation. Ms. Mullins suggested requesting Feno bounds be installed on the property line. Approve Minutes: 6/23/2026 and 7/14/2026 On a motion by Mr. Hamilton and seconded by Mr. Whelan, the Commission voted 5-0 by roll call vote to approve the 6/23/2026 minutes. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Thomas Olivier – Aye Thomas Whelan – Aye On a motion by Mr. Hnatko and seconded by Mr. Hamilton, the Commission voted 5-0 by roll call vote to approve the 7/14/2026 minutes. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Thomas Olivier – Aye Thomas Whelan – Aye Vote to Issue Order of Conditions: 18 Saddle Club Rd, DEP #201-1390, OpenGov CNOI-26-6 Mr. Beuttell stated that this project involves restoration plantings and the order will include standard conditions of a required three-year monitoring period for survivability. Ms. Mullins noted the order should include standard conditions regarding stormwater as well. On a motion by Mr. Hamilton and seconded by Mr. Whelan, the Commission voted 4-0 by roll call vote to issue the Order of Conditions. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Thomas Olivier – Abstain Thomas Whelan – Aye Schedule site visits: 9/8/2026 Meeting The site visits will be scheduled for Tuesday September 1st, 2026, starting at 5:30pm. Reports: Bike Advisory, Community Gardens, Community Preservation Committee, Enforcement Updates, Greenway Corridor Committee, Land Acquisition, Land Management, Land Steward Directors, Tree Committee None. On a motion by Mr. Hnatko and seconded by Mr. Olivier, the Commission voted 5-0 by roll call vote to adjourn the meeting. Record of Vote as Follows: Kevin Beuttell – Aye Philip Hamilton – Aye Jason Hnatko – Aye Thomas Olivier – Aye Thomas Whelan – Aye 10:20pm Respectfully Submitted, Megan Guardado LUHD Department Assistant Approved: 9/29/2026 Archived: 9/30/2026