Loading...
HomeMy WebLinkAbout2014-11-19-HC-min HISTORICAL COMMISSION MEETING MINUTES November 19, 2014 Call to Order: A public meeting of the Historical Commission was held in Learning Center, Cary Memorial Library at 1874 Massachusetts Avenue The meeting convened at 6:30 pm. Historical Commission Members in Attendance: Ms. Marilyn Fenollosa, Mr. Wendall Kalsow and Mr. David Kelland, Chair, Ms. Sally Zimmerman AGENDA ITEM # 1 (6:30PM) Updates and Meeting Minutes SUMMARY: Ms. Zimmerman spoke with Lindsey Dahlberg, purchasing agent for the Town of Lexington in regards to the completion of the survey. She reviewed the request for the proposal that was submitted. If the contract was for less than $35,000 they could bid without going through more request for proposals. This is just at $35,000. They received names for possible consultants and sent out a letter this afternoon to the three top consultants asking them for quotes and would like to respond or decline. This consultants were asked because she knows they meet the minimum qualifications. Mr. Kalsow wants them to submit quotes and project proposals and then a separate envelope that will not be opened until after the ranking has been done based on qualifications. This will be set up exactly as Lindsey requested. Meeting Minutes for October 17, 2014 were accepted as amended. AGENDA ITEM # 2 (7:31pm) Public Hearing on full Building Demolition application for the garage located at 1 Adams Street APPLICANT(S) PRESENT: Jon Wardwell, owner ABUTTER(S) PRESENT: None present SUMMARY: Jon Wardwell states that this house was built in 1910. He is here seeking approval of the demolition of the garage which is 704 square feet. His goal is to add a two car garage and an addition, attaching the two structures together. The aluminum siding has been removed and found that there is extensive rotting underneath. He is looking to save all the exterior features. Jon has contacted all abutters and met three of them on site to explain project. Addition will consist of 2 levels and shutters. HC COMMENTS: Mr. Wendall Kalsow wants to make it clear he is at this meeting for the full building demolition of the garage and selective demolition of the south elevation of the house. PUBLIC COMMENTS: 1 None MOTION: moved by Ms. Zimmerman, and seconded to approve the project with the work reflected in the plans with the amended south elevation submitted at tonight’s meeting. VOTE: 4-0 in favor. AGENDA ITEM # 3 ( 6:56 PM) Public hearing on roof line change for the house located at 94 Gleason Road SUMMARY: No applicant present. Will be continued to next month’s meeting AGENDA ITEM # 4 (7:00 PM) APPLICANTS PRESENT: Homeowners, Michael and Heather McBrinn Julie Norman ABUTTERS PRESENT: NONE SUMMARY: The McBrinn family has been located at 1 Fuller Road for the past 7 years. They have established a close connection with this neighborhood and the greater Lexington community. As a growing family, there is need to provide more usable space to the existing 1,496 sf home to accommodate the living and social aspects of their home life. The existing enclosed porch is composed of recessed architectural paneling, storm windows, and the original arched transom windows. The combination of paneling and arched transoms provide a beautiful detail and brings attention to this special room overlooking the yard. The porch has settled over the years due to inadequate foundations consisting of 2 cement block pads on the outer corners. This has impacted the framing, exterior windows, and paneling. Windows and doors do not operate properly and many sections of rotted wood are visible near the ground elevation. This modest 2 – story addition consisting of a living room expansion and a new full bathroom provides an increase of livable area of 220sf. The addition is located over the footprint of the existing deteriorating enclosed porch on the south-side of the house. It maintains the spirit of the original enclosed porch programmatically by remaining a sitting area overlooking the yard and architecturally expressed by gridded windows with transoms on three sides. Architectural paneling compliments the windows for refined detail at the first floor. The upper portion of the addition supports a new full bathroom. Visibility from the bathroom is controlled by the placement of two new windows, one with an arched headers, and other with arched molding reminiscent of the original porch windows. HC COMMENTS: Ms. Zimmerman asks if this is a 1940’s house. Mr. Kalsow states the scale is appropriate and has minor visual impact. 2 MOTION: moved by Ms. Zimmernan, and seconded, to approve partial demolition in the plans submitted today, 11/19/2014 VOTE: 4-0 in favor There was a motion moved by David Kelland, and seconded to shorten time between applicants to ten minutes. VOTE: 4-0 in favor ---------------------------------------------------------------------------------------------------------------------------------- AGENDA ITEM: Adjourn MOTION: moved by Mr. Kelland, and seconded, to adjourn meeting. VOTE: 4-0 in favor Meeting adjourned: (Time) 8:23 PM (EST) 3