Minutes of the Lexington Planning Board
Held on Wednesday, August 5, 2026, Virtual Meeting at 6:00 PM
Planning Board Members Present: Bob Creech, Chair; Melanie Thompson, Vice-Chair; Tina McBride, Clerk;
Michael Schanbacher; Lin Jensen; and Michael Leon, Associate Board Member
Planning Staff Present: Abby McCabe, Planning Director; Meghan Roche, Assistant Planning Director;
Aaron Koepper, Planner, Cynthia Nelson, Planning Coordinator
Bob Creech, Chair of the Planning Board, called to order the meeting of the Lexington Planning Board on
Wednesday, August 5, 2026, at 6:00 PM. For this meeting, the Planning Board is convening by video
conference via Zoom. LexMedia filmed the meeting. Members of the public may view the recording on
LexMedia’s On Demand webpage. The Chair explained the process and the procedures of the meeting.
Mr. Creech conducted a roll call to ensure all members of the Planning Board and members of staff present
could hear and be heard.
Mr. Creech provided a summary of instructions for members of the public in attendance. It was further
noted that materials for this meeting are available on the Town's Granicus Peak dashboard. The Board
went through the agenda in order.
Development Administration
114 Wood Street – Public hearing for a major site plan review for a special residential
development proposal
The Chair re-opened the public hearing for 114 Wood Street a special residential development, the last
meeting was held on Wednesday, May 13. Mr. Creech explained the by right special residential
development process. He also noted that the site is near a vernal pool and the Battle Road historic district.
The existing neighborhood has raised concerns about privacy and impact on the vernal pool. As a result,
the applicant has removed the units that were closer to the vernal pool.
Representing the application team, Attorney Jonathan Silverstein elaborated, acknowledging that the
originally proposed 22 proposed units had been reduced to 15, which decreased the density and increased
the open space. He said that the project team has gone through the staff memos and peer review reports,
but that the team is waiting for some additional details from the peer review commenter. He said that
the project continues to engage the National Park Service (NPS) staff and that Mr. Zieff will discuss some
of these conversations and present photos of the park’s visibility later on in the meeting. He said that the
team owes some additional information and the team will seek to continue this discussion to October, as
they await the conservation review.
Steven Zieff with Seaver Construction presented on the experience that the team has had with the NPS.
He said that the team has been cooperative with the NPS, citing a recent site visit and their sensitivity to
the NPS’ concerns, in collaboration with the Conservation Commission.
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 2 of 15
Scott Seaver of Seaver Construction said that the comments from the NPS were to not disturb the social
(unauthorized) trails and to not perform mitigation planting in the vernal pools. He also noted that
engineer Fred Russell attended the recent Conservation Commission meeting.
Mr. Zieff displayed photos of existing conditions of the trails and historic roads in relation to the site plans.
He pointed to a series of numbers on the plans and explained their correspondence as locations of the
existing conditions photos. He said that it’s reasonable to say that the development will not be visible
beyond the trees abutting the trails. He also displayed photos when the trees have less foliage, which also
showed little visibility of the site from the trails. He displayed aerial photos that were requested by the
planning staff. He pointed to the corresponding locations of the existing conditions photos. He later
displayed plans showing the planned buildings with respect to the grading.
Mr. Silverstein asked for clarification if the applicant team were to continue presenting and taking
questions after, rather than along the way. Mr. Creech agreed to this process. Mr. Silverstein then
introduced engineer Fred Russell. He presented the engineering plans, displaying the changes in
positioning of the development in respect to the vernal pool. He also pointed to the snow storage areas
and the addition of a driveway offset to improve fire service access. He noted that changes were based
on staff comments on cleaning up the details on the fire turnround. He also addressed the plans for tree
removal and the improvements to depict trees set for removal with x’s on the plans. He also said that the
peer reviewer gave them comments about addressing run-off. He pointed to a natural swale that runs
through the property and explained that a stone culvert would be added where the swale begins to
mitigate the run-off. He said that the team was still waiting to hear back on a few peer reviewer
comments. He also noted the changes to the infiltration systems and said that the team performed
additional soil testing, including in the box of the infiltration system. The team also added sediment
collection systems, 3 or 4 of them according to Mr. Russell, for total suspended solids (TSS) removal.
Mr. Seaver pointed to a comment in the staff memo on sight lines. Mr. Russell said that was added to the
plans, showing that plans went above the minimum sight standards set by the American Association of
State Highway and Transportation Officials (AASHTO).
Mr. Silverstein presented on a plan showing the portion of the property already disbursed – he noted the
purple shading on the plans to give the board further details on the amount of land already disturbed and
how this gives a sense of how the site is not a completed vegetated site. About 67% of the area is already
disturbed.
Laurie Tarr Ellsworth, the applicant’s landscape architect, presented a sketched rendition of the
residential amenity space. The minimum is 750 for the number of units, meanwhile the project is
proposing 3750 square feet. 550 square feet is permeable and used for accessible patio space and sitting
areas. 3200 square feet is for passive recreation space with bench seating. Over three acres of space for
what the residents can decide to do with it, by the roadway, the housing units, and anything not
considered private. She asked for clarification on if they need a common open space plan. She pointed to
the tree remediation and corrected that there were 4 trees in question or remediation, not 5. She
provided context to the tree remediation table on the plan. Mr. Creech asked about the location of the
amenity space. Ms. Ellsworth showed it was between units 15 and 5.
Kevin Ranslow presented VSB’s architectural plans. He pointed to the view corridors represented on the
aerial plans. He showed the at-grade plans, noting that the housing design is typical of the area in color
and detail. He addressed the comments on the parking dimensions. He showed that the planned car
parking spaces in the garage are the same as standard parking lot spaces. He also noted additional details
on EV charging, e-bike charging, and bike storage, as well as garbage and recycling space.
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 3 of 15
Mr. Silverstein addressed previous comments and the applicant’s responses, such as adding rain barrels
to the rear of each building, providing ANG calculations, and providing photometric plans. He said that
the team may end up being interested in hearing the board’s perspective regarding staff comments on
road pavement and sidewalk differentiation on the plans. He said that might be difficult as the team plans
on using asphalt for both. He said that they don’t think this is a safety risk regarding pedestrian access. He
said they may add paint on the sidewalk/driveway borders. He said that the applicant team may ask for a
waiver on that. The last thing he wanted to note was that he knew that the board, in the past, had asked
for renderings of amenity space and that the team could provide that if asked to do so for October.
Ms. Ellsworth noted the feedback on the position of the bike rack. She chose that location based on where
she thought youth access might benefit from it being near play space. She welcomed feedback on this
from the bike committee and others.
The Board members asked of the project team and planning staff:
Associate Member Michael Leon asked for more details on the conversations with the NPS, especially on
the issues of connectivity and access to the park’s trails. Mr. Seaver said that the NPS staff said they do
not want connections to the existing social trails. Mr. Leon also asked about the possibility of an
archaeology survey. Mr. Seaver said that the Public Archaeology Laboratory, Inc, (PAL) and Principal
Archaeologist Deborah Cox and said that the gist of the conservation was that a study would be
unnecessary and that the team should work directly with the NPS to find out their concerns, which Mr.
Seaver said is what they did. He reiterated that the two viable requests were about the vernal pools and
the lack of connection to existing social trails. Mr. Seaver continued, saying that the team has worked
directly with park staff, including a recent site walk and communication with the park superintendent a
recent as that day.
Mr. Silverstein presented a satellite view of the area. He noted the dense tree cover which would impede
people from seeing the site from the park, even during winter.
Mr. Leon referred to 1991 NPS plans and noted the inclusion of the Wood Street trail connection to the
park in those. He recalled that those plans were circulated before the first hearing. He also said that if the
project was subject to MEPA, the project would require an archeological study. Mr. Silverstein said that
NEPA is triggered by state permitting, which this project does not need. If this were to happen, the project
team would comply, but at this time, the survey would be an expense which experts do not see any
benefit. Leon said that, given the 1991 plans for a trail on Wood Street, this would demonstrate some
historical significance and should require the study, as this is within NPS boundaries. He looked forward
to hearing what NPS representatives would say and would defer to them.
Mr. Leon had a question for Mr. Russell regarding the offsite gradient location. He asked about the culvert
and if this were to happen, would a drainage easement be necessary for an abutting property owner?
Russel said it would be benefit for the abutters and said this is something they could discuss with the peer
reviewer. Mr. Leon pointed to other easements in the location. He closed his comments by expressing his
appreciation for the changes in respect to the vernal pool buffer zone.
Mr. Silverstein noted that the team originally thought they would be asked by the NPS to provide the trail,
and they are still willing to do that, but he said that there are competing interests and they will be
beholden to the board and the NPS. Regarding a potential archaeological survey, he said that the NPS is
free to do their own survey at their own expense.
In response to Ms. Ellsworth comment regarding bike racks, Ms. McBride comment that she thought the
comments from Bicycle Advisory Committee were about the rack being better to the right of the bottom
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 4 of 15
four units. Ms. Ellsworth noted that she proposed two bike racks with one around the loop of the
driveway. Ms. McBride asked if anyone from the Bike Committee was in attendance. Mr. Seaver said he
remembered a circled area in a report and that the project team would move it if asked. McBride
appreciated the e-bike and EV chargers. She also appreciated the additional LID options like the rain
barrels. She also said that she feels the reduction of 22 to 15 units is a good faith effort to reduce impacts
to the site but also said that the project needs to be sensitive to the archeological and architectural
significance of the area. She noted that the Town GIS shows that this is ecologically significant land and
wished that the town had been able to purchase the land.
Ms. McBride said she agreed with Jeff Howry, Precinct 2 Town Meeting Member, that a shared view
analysis of the site with the added context of building images would be helpful. She urged the project
team to look at natural screening in the southwest and southeast borders of the site, such as adding
strategically placed evergreens. She said it would be great if the project had a variety of tree species that
thrive in swamp settings, such as red maples, black tupelo, the swamp white oak, the Atlantic white cedar
and yellow birch in the tree mitigation plan.
Ms. Ellsworth responded that the property already has a lot for existing plantings, but since the last
discussion, she’s added additional evergreens, but she said that adding even more planting could be
detrimental to the undisturbed areas. Seaver added that there will be more plantings added as the
Conversation Commission discusses this and makes their recommendations.
McBride asked if the additional plantings would be in the areas to make the sight line from image 5 of 7
obscured. Ellsworth said that part of this was chosen about what areas they can work with. Silverstein
said they would be careful about commitments, as there are restrictions on what they can plan with
respect to the power lines.
Ms. Jensen asked for clarification on the maps displaying the alleged disturbed land, saying that this area
was mostly green canopy on Google Earth’s aerial imaging. Mr. Silverstein said that the canopy is in the
sewer easement area, which has been grown in, but it is still considered disturbed land. He noted that the
canopy can be deceptive, as the canopy is obscuring driveways. Ms. Russell also noted that mature trees
can grow on disturbed land. Ms. Jensen said she wasn’t sure about the purpose of showing this; Silverstein
said it was to show that an archaeological study wasn’t needed.
Ms. Jensen also pointed out how the existing conditions photos don’t show what the development is going
to look like against the trees. She asked if it would be possible to see the new development from the battle
road trail through the powerline easement. Silverstein said the difficulty is showing the rendering of
something that one wouldn’t’ be able to see. He said that if someone on battle road trail were able to see
the new development, they would first see the already existing houses before that. Jensen said she was
asking for the view from the southwest, by the powerline easement. Russell said these photos were
included earlier. Silverstein opened it in google street view and showed the topography obstructing the
view. Bob Creech cited a recent site visit in which he could not see the vernal pool from this location.
Ms. Jensen also asked about the residential amenity space’s location. Ellsworth said it was by units 5 and
15. Jensen asked for confirmation that this would not impact the turnaround, to which Ms. Ellsworth said
it would not.
Ms. Jensen echoed what McBride said about how the town’s own bylaws promote ecological and historic
preservation. She said that she appreciated that team was making progress to this but reiterated this is
not just an issue of preservation from the National Parks.
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 5 of 15
Ms. Jensen said that the NPS would be able to buy the land without consent, and she wanted to get
confirmation on how this title would be treated when this area would become private residential
property. She wondered if the Planning Board would even be able to approve this development.
Silverstein said that he has experience with federal land; he said that the federal government can take the
land by eminent domain without the approval of Congress. He said he has never seen the federal
government exercise this right in Massachusetts. He said that unless NPS finds the money required and
wants to purchase the land, to which there has been no indication that will happen, this is not a
foreseeable problem. Mr. Silverstein said this is not a title issue affecting the project or how the planning
board should decide, as the NPS has no regulatory authority.
Mr. Schanbacher asked for clarification on the positioning of the buildings not taken out due to proximity
to the vernal pool and if any were moved. Mr. Russell said that they were essentially in the same spots.
Mr. Schanbacher said he was disappointed that the project was not taking advantage of the natural
topography of the site and its significance. He also said that this discussion is focused on screening these
properties and preventing these residents from being a part of this town.
Ms. Thompson said she would like to see more renderings of the landscaping plans for the next meeting.
She also asked if the project would provide a lighting plan. Silverstein said this was noted in the staffing
report and that a photometric plan would be provided in the next meeting. Thompson said it’s great that
everyone can use that amenity space. She asked if the two car garages could have two EV chargers.
Silverstein said that usually people don’t charge both cars at once and they could switch off. Ranslow said
that from experience that it’s standard to only add one. He noted there would be capacity to add a second
line. Silverstein asked about the renderings requested and said they would provide a common amenity
space rendering, but renderings of everything would be a large ask. She said she would like to see the
landscaping of the entire space but would like to see whatever they can provide. She said it would be good
to see this with the buildings. Silverstein said they would provide as much as they can.
The Planning Board’s hired peer review consulting engineer Mike Carter said that the project team has
addressed most of their comments. He noted Mr. Leon’s concerns about the easement. He said that it
would not be any benefit of the applicant to obtain the easement at this time, but they may want to
consider an easement if the 15-inch drainage capacity grows. He said in general the stormwater plans are
very close to being done.
Mr. Creech noted that there were 30 attendees and noted their names. He gave an overview of the
purpose of the public comment session. He opened the hearing up to public comments:
Resident Spencer Champagne appreciated the commentary on reduction of the site and the NPS letter,
but he had a different reading of the letter and the 1991 plans than being discussed. He asked that, with
the reduction of the site plans, if this was still in the national park boundary. Mr. Creech said this is site
was still in the National Park area, but that the NPS had the opportunity to buy this but did not. Lexington
Bylaws say they have the right to develop this land. Ms. McCabe said the team conferred with Town
Council, and the community must follow town bylaws regarding the development potential. She said that
the NPS has expressed concern but is working with the applicant, and they may speak on this later.
Resident Jay Luker commented that he is in general supportive of the project and was very interested in
learning more about the NPS’ public comments. He said he did not see those available through the public
portal for the project and would email to ask about that. He said that he would like to see the board focus
more on increasing the housing development in this town and state. He also said that the density of the
project is 2 units per acre, which is less dense than an abutting neighborhood.
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 6 of 15
Margie Brown, Integrated Resource Manager at Minuteman National Historical Park, spoke about her
conversations with the development team, which included discussing the parcel’s status as single-family
housing or high-density housing, and the protection of historical and natural resources. She said that her
team urged the development team to remove housing out of the wetland buffer zone and stated that a
connector path at this housing density was not viable. She said that an archaeological study was
performed on the Eversource right-of-way that returned significant archaeological resources. She said it
was critical before groundbreaking to do a comprehensive archaeological study. She also pointed out that
reenactments are performed at nearby Trainer Field before trees have grown their leaves and urged for
an April viewshed study. Mr. Creech noted that he could not see anything through the trees in the area
but clarified when asked by Ms. Brown that he performed his site walk in May.
Mr. Creech noted that the applicant has an upcoming meeting with the Conservation Commission. He
expressed support for not including a bike path, not encroaching on the wetlands, and not requiring
unnecessary plantings. He also said that removing three units helped the development in its proximity to
7 Amherst Street. He asked if the applicant team wanted to add anything, and Mr. Silverstein said the
team understood what they need to submit for next meeting.
Mr. Creech returned to the board for final comments. Ms. Jensen said she wanted to briefly refer to the
questions about trees and natural features, and how housing is not a one-dimensional issue. She said that
housing is important, but trees provide privacy and flood control. She said that natural and historical
preservation is important to the human story and property values of Lexington. Mr. Creech added that he
doesn’t think it makes sense to plant by the vernal pool.
Mr. Leon expressed his appreciation for Lorraine Miller’s historical research into the Town and the NPS
1991 plans, and her summary comments about establishing conversation restrictions and easements. He
said it was unfortunate that when the SRD Bylaw was adopted the issue of the 1991 National Parks plans
were not considered. He said that the community might have all benefited from this. He noted that the
NPS is an incredible economic benefit to the Town.
Mr. Creech concluded the resident comment period, and moved to Ms. Thompson for motions on the
project.
Motion: Ms. Thompson motioned continue the public hearing for the site plan review application for 114
Wood Street to Wednesday, October 7th, 2026, at or after 6 p.m. on Zoom. Ms. McBride seconded the
motion. The Planning Board voted in favor of the motion 5-0-0 (Roll call: (Creech – Yes; McBride – Yes;
Thompson – Yes; Jensen – Yes; Schanbacher – Yes). MOTION PASSED
Motion: Ms. Thompson motioned to accept the applicant's request to extend the final action deadline to
October 15th, 2026. Ms. McBride seconded the motion. The Planning Board voted in favor of the motion
5-0-0 (Roll call: (Creech – Yes; McBride – Yes; Thompson – Yes; Jensen – Yes; Schanbacher – Yes). MOTION
PASSED
5 MINUTE RECESS RETURN AT 8:15PM
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 7 of 15
25 Maple Street – Public meeting for a preliminary subdivision proposal to subdivide the
property into two lots with a turnaround
Mr. Creech asked the applicant team to introduce themselves. Patrick O’Reilly of Fodera Engineering
introduced himself, on behalf of Grand Central Suites, LLC. He reviewed the zoning of the parcels. He
pointed to the plans on display to describe the enhancements of the existing home and the development
of a private road and infrastructure access for the to-be constructed home. He said they were requesting
several waivers:
- WAIVER Ch. 175 § 7.2B(4) Layout and Alignment of the Street System - New right-of-way located
0 feet from abutting property line in southwest corner of project area to eliminate impact to
existing roadway infrastructure of a hydrant and pedestrian curb for the crosswalk.
- WAIVER Ch. 175 § 7.2E(1)(b) Design Standards for Streets and Rights-of-Way - Zero proposed
sidewalks.
- WAIVER Ch. 175 § 7.2E(1)(b) Design Standards for Streets and Rights-of-Way - 1% grade for about
40’, followed by a sag vertical curve transitioning to grades up to 8% for the remainder of 75 feet.
- WAIVER Ch. 175 § 7.2E(7)(d)[1-4] Dead-end Streets - “Y-intersection” capable of handling a 40-
foot fire truck turnaround.
- WAIVER Ch. 175 § 7.4D(2) Street Lighting - Remove the streetlight requirement
Creech turned to the Planning Staff Report.
Ms. McCabe noted that the Planning Board received a memo in their meeting packets prepared by Mr.
Koepper. She explained that this was a preliminary plan, which serves as an informative process with few
details. The stormwater peer review would come at a later step in the process. She presented the proof
plan that shows that the project has by right access to build on this property. She said that the applicant
was looking for right-of-way regarding a paved section. She said that the proposed road was functioning
more as a driveway than a standard road. She said that the planning team was supportive of this design
as there would be less pavement and lighting involved. The project would require a notice of intent with
the Conservation Commission. The Conservation Commission voted for an enforcement order, which the
applicant may be receiving soon. The movement of earth to the site will also require a special zoning
permit and a permit from the Zoning Board. The project would also require a permit for pavement
construction over property lines. The applicant was notified about the stormwater permitting
requirements.
The board would need to vote that night to follow the timeline of a preliminary plan. The staff did prepare
a draft with conditions of recommendations to be addressed in the definitive site plan review.
Planner Mr. Koepper noted, regarding the right of way waiver, that the paved portion of the roadway
would be 18 feet away from the lot border; the actual built conditions will be more than compliant with
Ch. 175 § 7.2B(4). Ms. McCabe stated that this is being pursued because the fire hydrant and crosswalk
are just north of the proposed road, and this would be so that that infrastructure wouldn’t have to be
moved.
Mr. Creech asked about what the development design in particular is leading the applicant to pursue these
waivers. Mr. O’Reilly said that overall, it was due to presentation of the neighborhood and that this
property would be presented as an estate. There’s no public access to the estate, so there is no need for
a sidewalk or street lighting. He said if asked in the def about lighting. He felt that the turnaround was
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 8 of 15
more suited to the site than a cul-de-sac. He said that the right of way – would not like to get involved in
that, which shifted the roadway to the southern abutter. Creech asked if the property was surveyed,
O’Reilly said it was. Creech acknowledged the Conservation Commission issues, and said these issues were
nothing new for Lexington. He reiterated nothing was to be done after just the preliminary subdivision
approval. He confirmed that the applicant would preserve the historic home onsite. He personally didn’t
feel that the house was in disarray and would like to schedule a site visit with the board.
The Board members asked of the project team and planning staff:
Mr. Leon said that there were potential risks going forward with the Zoning Board of Appeals. He said
there should be official confirmation on the driveway not being widened in the future. He said that the
way that the proof plan should better reflect the project’s ability to create two lots. He noted that one of
the abutters raised the issue of whether they need two curb cuts as the historic house would also be
altered and make the access to Lot 1 of Cove Estate Way.
Ms. McBride said she agreed with the idea of eliminating one of the curb cuts, but this could potentially
mean an address change for 25 Maple St. She also asked why the applicant needs to use more than 25
cubic yards of fill.
Applicant Vincent Nazar said that when the team approached the seller, they looked at an indentation on
the property around 16 feet, which would require a large amount of fill. The wetlands scientist Nicole
Ferriera said there were no wetlands on the property itself. Nazar said the fill is coming from another
residential site, but they did not know about the Lexington bylaws about a permit being required for more
than 25 cubic yards of fill. He “would never even thought that there's permission needed” from the town
to fill the driveway. He noted that, historically, this property was a farm field that has been overgrown
with invasives. He said he couldn’t view the property initially due to overgrowth. He said that the back of
the property abuts conversation land owned by either Lexington or Arlington, which impeded access. The
team used a small excavator to create a small path; Ms. Ferriera did find some wetlands in this area,
encroaching on a buffer zone, but there was no other way to access the site. The applicant aims to report
the 50 foot and 100-foot wetlands buffer in a balanced way.
Mr. Schanbacher asked about clarification on the proposed entrance sign. Nazar said the signage would
note it was a private way, not a road, and stating its name as Cove Estate Way.
Ms. Thompson asked why the applicant wouldn’t want any lighting, as this would get very dark for the
future resident(s). Mr. Nazar said this was to not disturb the neighborhood. He said people appreciate
their privacy, and did not want to affect the abutters, but they could alter this for hip height downlighting
if the board and neighbors feel this would be beneficial. Ms. Thompson asked for some more information
on the existing 25 Maple St building. Mr. Nazar said that the team would restore the historic home and
that they have a portfolio of restorations across New England. Ms. Thompson also asked about their work
with Conservation Commission and Nazar said they would be moving forward with that quickly.
Ms. McCabe clarified that they have not filed anything with the Conservation Commission, no set dates
to discuss this. They just have an enforcement action order, and further updated would not happen for a
while. Mr. Nazar said that they recently had a meeting with Conservation Director Karen Mullins, and he
could address the board in writing regarding these details.
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 9 of 15
Ms. Jensen said that she appreciated that the team would keep the historic structure and that they have
expertise in restoration. She echoed the desire for one curb cut instead of two. She asked Ms. McCabe if
they would be recommending anything tonight to the applicant and how these changes would work
between the preliminary and definite. Ms. McCabe said that the Planning Board should share their
thoughts tonight. This discussion was focused on the roadway; the design of the house would not be in
the preview of the Planning Board at this time. She noted that the Historic Commission would address
anything regarding the historic house. Ms. Jensen also asked about planting, to which Mr. Koepper said
that regarding trees, the team is currently only looking at roadway trees. Ms. Jensen agreed a sidewalk
wasn’t needed for one house but asked if the applicant was required to address the sidewalk conditions
on Maple Street. Ms. McCabe said the applicant would only need to address that if they damaged or
needed to change part of Maple Street, but this discussion focuses on the development of Cove Estate
Way. Ms. Jensen offered the suggestion that the house be rotated 90 degrees to position it further from
the wetland buffer.
Mr. Creech said they would vote on the waivers tonight. He asked if the applicant wanted to say anything
else. Mr. Nazar wanted the Board to consider how changing the 25 Maple St driveway might affect the
house and its impervious surface but found the proposal interesting and with potential. Mr. O’Reilly added
that altering the address and driveway for 25 Maple would require more fill to be added. Mr. Creech asked
the frontage of 25 Maple. Mr. O’Reilly said it was 273 square feet.
The board opened the public comment discussion . 14 people were in audience at this point.
Resident Lisa Newton appreciated Ms. McCabe clarifying certain aspects of the review. She said that she
attended the Conservation Commission meeting and said that trees were bulldozed by the excavator. She
asked if Conservation had been in touch with Ms. McCabe about this, and if that is something that would
be addressed in the definitive. She said the Conservation hearing “did not go well” because the applicant
went into the conservation land. She hoped that any environmental consultant on the project would
understand those issues present on the site.
A resident named Charlotte noted how close her residential lot was to the existing house. She focused on
the hydrology of this site and the impacts that a large amount of impervious surface would have on
abutters, and she looked forward to the full hydrology findings from the peer review. She also raised
concerns about lighting and privacy and asked the Planning staff to update the plans on page 8 to
represent the current lot lines.
Neighbor Brian Frazier said he would like to see what is proposed for the existing historic home, and how
any additions might affect the full scope of hydrology. He noted that the ravine that is to be filled is where
a lot of the area’s current run-off naturally goes to and wants to see where this would go once it is filled.
Mr. Creech said the law requires that all infiltration be done onsite. Mr. Creech also reiterated that this
was a preliminary subdivision, and the board would have to vote but it would not be binding. This process
is to guide the applicant. He shared his screen to read off the waivers being requested and their
corresponding regulations. Mr. O’Reilly noted that first waiver falls under the ZBA.
Mr. Creech said that he sees no issues with the second requested waiver (Ch. 175 § 7.2B(4)), nor for the
sidewalk or the grade waivers (WAIVER Ch. 175 § 7.2E(1)(b)). Mr. Creech said he leaned toward keeping
the two curb cuts.
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 10 of 15
Mr. Creech opened the discussion back up to the Board.
Ms. Jensen asked Mr. Koepper about the waiver regarding right of way being less than 10 feet from the
lot line. She wanted to clarify if this the proposed area that would be guaranteed to be 18 feet wide? Mr.
Koepper confirmed that, saying that the pavement built would be 18 feet; this matter is a question of this
pavement functioning more of a driveway than a public road. Ms. Jensen asked to add a condition that
the applicant would not change this pavement width in the future, such as changing it in a way that give
a less than 10 feet buffer to the lot line. Mr. Koepper agreed, and deferred to Mr. Leon on developing the
legal language.
Ms. Jensen asked for clarification on waiver #5, and if this was the waiver on having sidewalk. Mr. Koepper
said this was about using a Y-turn rather than a cul-de-sac for emergency services. The sidewalks are also
an issue to be waived, and that is waiver #3. Mr. Leon noted the need for the requirement in case the
property gets sold.
Mr. Leon said he would prefer only one curb cut to avoid problems at the intersection, and he wouldn’t
be concerned about adding fill in a non-wetland area.
Mr. Creech and Ms. Jensen asked for clarification on the property frontage. Ms. Jensen said that the
frontage on mapgeo is only 165 square feet. Mr. O’Reilly clarified that he was referring to the proposed
the scenario; the frontage is its 165 square feet today, would be 172 square feet on the existing street
and 273 square feet against the new road.
Mr. Creech concluded the resident comment period and additional board comments and moved to Ms.
Thompson for the project motions regarding the waivers. He asked Ms. McCabe for any additional
comments.
Ms. McCabe recommended adding the conditions for recommendations regarding the curb cut on Maple
Street for Lot 1 and for the requirement that the new roadway pavement not be within 10 feet of the lot
line to the decision.
Ms. Thompson motioned to waive the construction requirements to allow the new right-of-way at the
curb radius to be within 10 feet of another property line, where the new road intersects with Maple Street
on the southwest side of the proposed Cove Estate Way only. The Board finds this to be acceptable
because the proposed pavement is 18 feet from closest property line and moves the new road further
away from the Maple Street crosswalk and hydrant and subject to the condition added this evening that
the pavement be no closer than 10 feet from the adjacent property line. Ms. McBride seconded the
motion. The Planning Board voted in favor of the motion 5-0-0 (Roll call: (Creech – Yes; McBride – Yes;
Thompson – Yes; Jensen – Yes; Schanbacher – Yes). MOTION PASSED
Ms. Thompson motioned to waive the requirement from providing a sidewalk along the new road. Ms.
McBride seconded the motion. The Board finds this request acceptable because it would disturb less of
the site and minimum impervious surface to the one additional dwelling unit. The Planning Board voted
in favor of the motion 5-0-0 (Roll call: (Creech – Yes; McBride – Yes; Thompson – Yes; Jensen – Yes;
Schanbacher – Yes). MOTION PASSED
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 11 of 15
Ms. Thompson motioned to waive the construction requirement from providing street lighting along the
new roadway. The Board finds grant relief from providing street lighting will maintain the appearance of
a driveway leading to the new dwelling unit rather than as a road and will limit the impact onto the nearest
abutter. Board members were in favor of adding low level lighting. Ms. McBride seconded the motion.
The Planning Board voted in favor of the motion 5-0-0 (Roll call: (Creech – Yes; McBride – Yes; Thompson
– Yes; Jensen – Yes; Schanbacher – Yes). MOTION PASSED
Ms. Thompson motioned to waive the requirement for the maximum grade to 8% within 75 feet of an
intersection. The Board finds this request will require less disturbance closer to the wetlands and 8% is
the maximum grade allowed for roadways. Ms. McBride seconded the motion. The Planning Board voted
in favor of the motion 5-0-0 (Roll call: (Creech – Yes; McBride – Yes; Thompson – Yes; Jensen – Yes;
Schanbacher – Yes). MOTION PASSED
Ms. Thompson motioned to waive the construction requirement for the dead-end street 60-foot radius,
the 50-foot outside turning radius, and the inside 25-foot turning radius, to permit the submitted
preliminary design because the design is acceptable to the Fire Department and will provide less
impervious surface, less site disturbance, and help reduce the appearance of a roadway. Ms. McBride
seconded the motion. The Planning Board voted in favor of the motion 5-0-0 (Roll call: (Creech – Yes;
McBride – Yes; Thompson – Yes; Jensen – Yes; Schanbacher – Yes). MOTION PASSED
Ms. Thompson motioned to approve the preliminary subdivision plan for Cove Estate Way at 25 Maple
Street, with the recommended conditions, including limiting to one curb cut, to be included in the
definitive subdivision submission, as outlined in the draft approval prepared by staff and as discussed this
evening. Ms. McBride seconded the motion. The Planning Board voted in favor of the motion 5-0-0 (Roll
call: (Creech – Yes; McBride – Yes; Thompson – Yes; Jensen – Yes; Schanbacher – Yes). MOTION PASSED
Board Administration
Board Member & Staff Updates:
Potential Zoning Amendment Board Initial Discussion: Special Residential Developments
(added 8/3/26)
Mr. Creech gave Ms. McBride 15 minutes to discuss her amendment to 6.9 Special Residential
Development for the 2026 Special Town Meeting
Goals:
- Framework for gentle infill, as Gov. Healing endorses
- Transcript for all 6 bullet points (“consistency”)
Ms. McBride sought to discuss the historic structures amendment, and slated to have this be the only one
to discuss during the meeting. This amendment was to address the controversy on the Meriam Street
SRD. She said this was for community identity and providing a sense of place. She pointed to a historic
carriage house on Edgewood built by Lexington native and architect Willard Brown which was lost to the
SRD. This would give flexibility to applicants to do SSD or CND regarding:
- Site sensitive development
- Compact neighborhood development
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 12 of 15
Ms. McBride suggested to amend the word “may” to “shall” regarding the preservation of historic
buildings and to require a 5-year look-back period to qualify for SRD development and receiving the GFA
and density bonus. Mr. Creech asked for clarification on the demolition delay aspect, asking if this would
have prevented the carriage house from being demolished, which McBride said it would have if this
amended language was in place.
Mr. Schanbacher said, speaking as an architect, that places change and requirements of what a town
needs change, and the Town’s current needs include developing housing. He said that not everything
historic is worth preservation, though some buildings are. He pointed to how he had never heard of the
Harvard and MIT trained Architect, and Lexington native, Willard Brown that designed the historic house,
but he also pointed to how the development allowed for preservation of open space, which was important
to the neighborhood. He said he was reluctant to change “may” to be “shall.” He also asked for
clarification on the “5 years” requirement.
Ms. McBride referenced a concern raised by former Planning Board member Charles Hornig on how the
zoning is currently written to “all but guarantee” that historic structures would be demolished. Mr.
Schanbacher asked if this amendment was about making applicants wait 5 years to develop. Ms. McBride
said that in order to be qualified for SRD development and the added GFA and density bonus, all historic
structures on the property in the preceding 5 years of development proposals must be preserved. Similar
to the tree bylaw in which the "look-back period" is observed when property owners are required to count
trees removed in the last 36 months on their property if applying for a demotion or major construction
permit.
Mr. Leon referred to the Meriam street preservation of the historic house and how a smaller carriage
house may have been preserved. He said this raised questions about balancing the economics of high -
density housing with historic preservation. He said that the bylaw lacked some consideration when it was
first developed.
Ms. Jensen appreciated the comments from Mr. Schanbacher and Mr. Leon. She said she was looking for
constructive feedback on specific sentences or conditions in this proposed amendment and would
welcome any specific suggested edits or concrete alternatives.
Mr. Schanbacher said that Mr. Leon was right to say certain buildings are special, and we need to be really
careful, as when everything edges on historic, the Town is locked into preservation. He stated that he
takes pause with the use of shall. He also noted that the Meriam Street project did preserve the actual
house. He said, speaking as an architect, he’s never heard of the carriage house’s architect before.
Mr. Leon said looking at what developments are occurring in the State Legislature, such as changes to
seeking variances and the potential of allowing duplexes by right in single family zoning. He said that
anything written can be given variances, which are now easier, especially regarding housing.
McBride responded to Mr. Schanbacher about his position. She said that she respects the historical
cultural inventory list. She said this isn’t a slippery slope, and that residents of Meriam Street found that
carriage house to have value. She said we should never underestimate the value of history in Lexington.
She noted that beauty is in the eye of the beholder, and many others may find value in such things.
Mr. Schanbacher noted that the statewide review period for developments may be shortened to 90 days.
The board currently works within a 150 day period, which they have to work hard to adhere to as of now.
Ms. Thompson notes that this has gone on for more than 15 minutes, and we should move on.
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 13 of 15
Ms. McCabe followed up on what Mr. Schanbacher said. She encouraged people to write letters to their
reps regarding this, urging for a review period longer than 90 days. Mr. Creech asked if the board should
send a letter as a group. Ms. McCabe said that if they vote on that, she can work on getting the letter sent.
Board Member updates
Mr. Creech recently attended an event at Maynard Public Library on the installation of solar panels by
right. He said this was not a planning board issue per se, but that there should be a point person on this.
Ms. McCabe said that the Board would probably have to go to town meeting and update the general
bylaws.
Mr. Creech met with members of the housing partnership board and Ms. Thompson to talk about zoning
changes to consider in order to get to the true 10% affordable units inventory. No decisions had been
made, as the group did not want to do anything in a hurry. Three main topics were discussed: Lexington
Center, affordable housing overlay districts, and developing a working group.
Ms. Thompson moved to approve the following meeting minutes:
Meeting Minutes: 5/27, 7/15
The Planning Board voted in favor of the motion 5-0-0 (Roll call: (Thompson – Yes; McBride – Yes; Creech
– Yes; Jensen – Yes; Schanbacher – Yes). MOTION PASSED
Upcoming Meetings: August 19 and September 2
Adjournment:
Ms. Thompson moved to adjourn the Planning Board meeting of Wednesday, August 5, 2026, at 10:07
p.m. Ms. McBride seconded the motion. The Planning Board voted in favor of the motion 5-0-0 (Roll call:
(Creech – Yes; McBride – Yes; Thompson – Yes; Jensen – Yes; Schanbacher – Yes). MOTION PASSED
Meeting adjourned at 10:16 p.m.
View the meeting on-demand through LexMedia.
View meeting materials in the Planning Board’s Meeting Packet
List of Documents:
View application materials for 114 Wood Street on OpenGov.
Staff Memo 3 - 114 Wood St SRD 8.3.26
GCG Peer Review Comments-114 Wood St 07-21-2026
114 Wood Street property deed, 1992
114 Wood Street property deed, 2001
Minuteman National Historical Park General Management Plan, dated 1990
Minuteman National Historical Park Compatibility Guidelines, dated 1991
Minute Man National Historical Park Administrative Boundary Map, dated 1992
Minute Man 1992 Amendment, Public Law 102-488, dated 10/24/1992
Minuteman National Historical Park National Register of Historic Places form, dated 2002
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 14 of 15
Minute Man National Historical Park Administrative Boundary Map, dated 2002
Minute Man National Historical Park Administrative Boundary Map, dated 2010
Letter from Simone Monteleone on behalf of the NPS to the Conservation Commission, dated 07/01/2026
Letter from Lorraine Miller, date 07/10/2026
Letter from Janet Lane, dated 07/14/2026
Letter from the Lexington Historical Commission dated 07/17/2026
Letter from Janet Lane, dated 07/20/2026
Letter from the Lexington Bicycle Advisory Committee dated 07/21/2026
Letter from Janet Lane, dated 07/27/2026
Letter from Simone Monteleone on behalf of the NPS to the Conservation Commission, dated 07/27/2026
Letter from Jenny Stieglitz and Doreen Buchinski dated 07/28/2026
Letter from Lorraine Miller, Jenny Stieglitz and Doreen Buchinski dated 07/28/2026 – (Letter A)
Letter from Lorraine Miller, Jenny Stieglitz and Doreen Buchinski dated 07/28/2026 – (Letter B)
Letter from Town Meeting Member Jeff Howry dated 07/29/2026
Letter from Jenny Stieglitz and Doreen Buchinski dated 07/29/2026
Letter from the Lexington Tree Committee dated 07/30/2026
Image of Lily Pond Development
Land Deeds, dated 12/11/1990 and 07/26/1991
Letter from Jenny Stieglitz, dated 01/28/2026
Letter to Conservation Commission from Simone Monteleone via Paul O'Shaughnessy, dated 04/28/2026
Letter from Friends of Minuteman National Historic Park, dated 05/05/2026
Letter to Conservation Commission from Alexander Richards, dated 05/08/2026
Letter to Conservation Commission from Janet Lane, dated 07/06/2026
Letter to Conservation Commission from Jenny Stieglitz, undated (Letter A)
Letter to Conservation Commission from Jenny Stieglitz, undated (Letter B)
Letter to Conservation Commission from Jenny Stieglitz, undated (Letter C)
Letter to Conservation Commission from Jenny Stieglitz, dated 07/27/2026
USC Chapter 1 Subchapter LV Minute Man National Historical Park
Battle Road No Turning Back Literature Review by John Muse
Minute Man National Historical Park Land Protection Maps
History and Existing Condition of the Battle Road, dated March 2003
Minute Man National Historical Park Boundary Assessment, dated August 2007
Minute Man Proposed Boundaries, date 09/17/2008
Lexington Planning Board Meeting Minutes
August 5, 2026
Page 15 of 15
National Park Service Cultural Landscapes Inventory Battle Road, dated 2007
Results of Research Conducted on the Thomas Nelson Farm Site, dated 03/01/2010
Foundation Document, Minute Man National Historical Park, dated February 2015
National Park Service Cultural Landscapes Inventory Fiske Hill, dated 2015
MassGIS Cultural Resources Map, accessed 05/13/2026
Maps from Card Memorial Library, updated 06/28/2026
Newspaper Article on Minute Man National Historical Park, dated 05/08/1975
Newspaper Article on Minute Man National Historical Park, dated 09/21/1989
Newspaper Article on Minute Man National Historical Park, dated 10/24/1991
View 25 Maple Street application materials on OpenGov
Staff Memo-25 Maple St 07/31/26
Letter from Paul and Caley Chastell, dated 07/10/2026
Letter from Brian and Natasha Frazier, dated 07/29/2026
Letter from Lexington Tree Committee, dated 7/30/26
Letter from Charlotte Heyden and Staffan Canback, dated 07/30/2026
Letter from Ann and William Strong, dated 07/30/2026
Letter from Ann Strong dated 07/31/2026
Supporting Images provided by Ann Strong