HomeMy WebLinkAbout2026-04-28-SLC-min.pdfSustainable Lexington Committee Minutes of Meeting of April 28, 2026
A meeting of the Sustainable Lexington Committee (SLC) was held on Zoom. A quorum was
present throughout.
Members Present: Cindy Arens (chair), Todd Rhodes (vice chair), Andy Joynt, Dan Voss,
Kavitha Venkatesan, Celis Brisbin, Kavita Ravi
Members Absent: Lin Jensen, Rick Reibstein
Staff Present: Maggie Peard
Other Attendees: Ricki Pappo, Mark Sandeen, Joe Pato (SB Liaison)
—————————————
SUMMARY OF VOTES: No votes were taken.
—————————————
The meeting was called to order at approximately 6:02 pm
Previous Meeting minutes: The minutes of February 12, February 24, March 24 and March 26,
2026 meetings were approved as written.
New Business
Plastic turf health issues: Susan Chapnick, MS and Sarah Evens, PhD gave presentations at the
April 21 Lexington Board of Health meeting on the adverse health effects of plastic turf and
poured in place playground surfaces, including PFAS and microplastics.
SustainabLY
Maggie said that they created a website about their MassEnergize challenge portfolio regarding
increasing public transit use including MBTA and LExpress. MassEnergize is announcing the
challenge winners at an event on May 1.
Sustainability and Resilience Officer Updates
BEUD
The deadline for reporting is May 31st. Notifications have gone out to building owners,
including instructions on reporting. Maggie ran a training session on how to report, but not many
attendees as many already know how.
Still using the BEAM platform from Clearly Energy, helpful to building owners, includes energy
data for portfolios and what they can do to be in compliance. Sent out building energy score
cards. EPA Portfolio Manager database application, for reporting building energy use, is still
funded and running. Mark said that Maggie is doing a great job; state compliance is 40%, ours is
85%.
Town Meeting Articles
Article 23 was passed.
Article 31 got stalled for technical difficulties, and will be taken up at the next Town Meeting
session. Town trash bin survey responses are up to 1000. Not too many new questions. Baseline
service was the most common question. Then multiple size bins. Kavitha suggested providing
bin samples at Town Meeting. Joe suggested that we allocate bags/bins by household size. Todd
raised the concern of how to pick up extra bags, but Cindy explained that many towns do it.
Mark suggested having an extra bin instead of a bag. Kavitha suggested quoting DEP; many
towns have dealt with all the corner cases and emphasizing that reducing waste reduces costs
despite exceptions.
Article 7 not yet taken up.
Tufts Neighborhood Electrification project
Final draft report from students is due on 4/30. The report will have lots of data, including a cool
heatmap of resident electrification interest. Data has been corroborated with utility data. There is
a spreadsheet analysis of 25 dead-end street segments from the gas utility (National Grid).
Students were able to work with National Grid on different gas pipeline retirement scenarios,
however the utility is not prepared to move forward with neighborhood electrification. The
Newton Garland Rd pipeline retirement plan group would be good to reach out to. MassCEC has
a Cost Reduction Lab grant to reduce costs of electrification. Companies are looking for pilot
partners, Lexington could be one of them.
Municipal Vulnerability Plan/Hazard Mitigation Plan
Will share the draft Hazard Mitigation Plan and the MVP 2.0 priorities. Community outreach
continues.
High School Project Update
Joe: New estimates came in for Design Development (DD), some elements went up and some
went down, but the total did not change. Still on track for cost and time. SBC voted to accept the
estimates and move to construction documents.
Cindy: Need breakouts for cost of red-list free items and exposure risk. May ask for a joint
PBC-SLC meeting.
Mark: DD budget was fully compliant with the IBDCP. Red list will be on a Total Value Design
opportunity. May help to have an offline meeting since PBC meetings don't accommodate
nuance. Want to set a threshold of cost savings that triggers a review. The design team is still
indicating a recommendation to scale back solar to reduce construction costs without providing
analysis for increased operational costs.
State Legislation
“Save MassSave” two-pager
Housing Energy Affordability Fact Sheet
Letter to Senate
A state climate bill has passed the House and is now being looked at in the Senate. The House
bill included good things, but included cutting MassSave’s budget by $1bn. This will not only
increase utility costs but cut tens of thousands of jobs in the process. Senate advocacy will be
needed in order to remove those detrimental cuts to MassSave.
Resilient Lexington Buildings and Energy section review
Need to review every 5 years. Metrics are generally good.
The first goal of implementing fossil fuel free for new construction (BE 1.1.A) is going well as is
BE 2.1.A, identifying town sites for adding solar and planning to add.
Electrified households are hard to track. Celis: Look at the property card. Cindy: But it is not
accurate. Utilities report aggregate data for Lexington.
Solar installations can be tracked via state SMART and REC data. However, it’s slow to be
updated. Households signed up for community solar are easy to track.
Good idea to focus next on BE 2.1.C, re-start a Solarize campaign and include battery storage.
Network Geothermal may come back as a possibility depending on how HEET Framingham
project goes.
We should also consider a bylaw requiring solar for new commercial construction like
Watertown has.
Talked about adding Building Performance Standards, but might watch how the state building
energy reporting goes.
We could also pursue a Lexington specific community solar, could the Lexington community
benefit from Town solar projects.
Kavitha: Need to document pathways to 100% electrification.
Next meeting: May 26