Loading...
HomeMy WebLinkAbout2341 Report of committee on a proposed new schoolhouse for the East Village, and on the grading of the schools, November 2, 1858Adams School-house. The Committee appointed at the last Town meeting to consider the necessity of building a new school-house in the East Village, and also whether any further trading of the several schools, in Town is expedient, have attended to the duties assigned them, and they now submit the following Report The Committee, soon after their appointment met at the school-house in the East Village, and carefully examined the present building, - both its exterior and interior, and wer[e] unanimously of the opinion (one of the seven constituting the committee being absent) that the house now used is not suitable either for the present or prospective wants of the District. Its unfitness seemed to them to consist chiefly in three important particulars - viz: 1st The house is not sufficiently large; the rooms are too small, and too low-studded. 2d Ventilation is very defective. 3d The house is much out of repair and has been suffered to remain so a long time, as the committee were told, on the supposition that it would soon be set aside for a better one The floors are literally worn through. Under these circumstances the Committee are of opinion that it would not be good policy to enlarge, elevate, completely remodel, and thoroughly repair the present edifice, but agree in recommending to the town the erection of a new building In the site of the old one, sufficiently capacious to meet the present and prospective wants of the District. The Committee are of opinion that the present house can be moved to one corner of the yard without interruption to the schools while the new house is in building, and that no time will be more suitable to commence the work than the present. This Committee believe that a house very similar to that in the Centre District in its general plan, except being 4 or 5 feet longer, - two stories high, with two school-rooms on the first floor and one above, as the one in the middle of the town has, - warmed and ventilated on the most approved plan, is such a house as is needed in the East Village District; and they are informed by a competent carpenter that such an one can be built for from $3 500. to $3800. The details of this plan, - such as recitation rooms closets &c - this committee think it would be most wise to leave in the hands, of a competent building Committee, who may be limited to a sum not exceeding $3800. dollars. With regard to changing the grade of the several schools in town, the Committee would say, that eight years ago, when the new school-house was built in the Centre District, the Committee very wisely advocated, and caused it to be built upon a plan having three school-houses, with a view of accommodating three grades, although but two grades then existed in town, foreseeing that another grade must necessarily soon be established. Three years afterwards another grade was established, which now gives us three grades. This committee perceives no necessity, therefore, for increasing the number of grades at the present time, but would only make provision for another school of the same grade as same one of the three grades which we now have, as it will be needed to meet the rapidly increasing wants of the two villages. All of which is respectfully submitted by your Committee. Howland Holmes Nathan Fessenden Jr A. W. Bryant Webster Smith Sullivan Wellington Hammon Reed Sidney G Davis. Lexington, Nov, 2d 1858 Adams School-house Nov. 2d 1858 Accepted by the Town Nov, 3d 1858. 2341