Loading...
HomeMy WebLinkAbout2025-12-08-STE-Referendum-ResultsOFFICIAL RESULTS TOWN OF LEXINGTON SPECIAL TOWN ELECTION DECEMBER 8, 2025 A true copy. Attest: �1� C��A�'tk Mary de Alderete, Town Clerk 8:31 AM 12/10/2025 PCT 1 PCT 2 PCT 3 PCT 4 PCT 5 PCT 6 PCT 7 PCT 8 PCT 9 TOTAL TOTAL VOTERS 2 . - 2.- � t � _ == _ - _ {_ = �. �: _ =- _ =- t = - Total Votes 857 1,074 720 1,035 906 1,035 965 951 1,045 8,588 Percent 1 35% 1 39% 1 32% 1 40% 1 34% 1 38% 1 37% 36% 1 38% 1 37% Shall the Town of Lexington be allowed to exempt from the provisions of proposition two -and -one-half, so called, the amounts required to pay for the bonds issued to pay for the costs of design and construction of a new Lexington High School, to be located at 251 Waltham Street, in Lexington, including the costs of conducting a feasibility study, design development, demolition, architectural and engineering services, original equipment, furnishings, landscaping, athletic fields, paving and parking areas, other accessory facilities, and the renovation of the existing field house, if the overall appropriation so allows, and other site improvements or incidental cost directly related to such construction? PCT 1 PCT 2 PCT 3 PCT 4 PCT 5 PCT 6 PCT 7 PCT 8 PCT 9 TOTAL YES 539 670 521 648 508 656 554 581 624 5-0- NO 318 404 199 387 398 378 411 370 420 -285 BLANKS 0 0 0 0 0 1 0 0 1 TOTAL 1 857 1,074 720 1,035 906 1,035 965 951 1 1,045 1 8.588 A true copy. Attest: �1� C��A�'tk Mary de Alderete, Town Clerk 8:31 AM 12/10/2025