Loading...
HomeMy WebLinkAbout1981-04-27-SC-min Page 21 April 27, 1981 A meeting of the Lexington School Committee was held Monday, April 27, 1981, at 8:00 p.m. , in the School Administration Building. Present were: Shaw, Swanson, Gaudet, Michelman, Beck, and Student Representative Mark Splaine. Also present were: Lawson, Pierson, DiGiammarino, Monderer, and Barnes. School Committee Chairman. Michelman. introducted the newly-elected Student Representative to the School Committee, Mark Splaine. Mr. Splaine, in turn, introduced two other members of the Student Advisory Committee who would, serve in the 1981-82 school year. He noted that two other student representatives would be elected in the spring. It was MINUTES: VOTED: to accept the minutes of April 24, 1981, as amended. (Gaudet, March 24, 1981 Beck, Unanimous) VOTED: to accept the minutes of April 7, 1981, as amended. (Beck, Swan- April 7, 1981 son, Unanimous) It was EXECUTIVE MINUTES: VOTED: to accept the executive minutes of May 24, and June 21, 1976, and May 9 and November 1, 1977, for public release, as presented. May 24, 1976 (Beck, Swanson, Unanimous) June 21, 1976 May 9, 1977 Upon the recommendation of the Superintendent of Schools, it was November 1,197 VOTED: to accept the following schedule of payments as listed on the at- SCHEDULE OF tached sheet: (Gaudet, Swanson, Unanimous) PAYMENTS The financial statement was discussed. FINANCIAL STATEMENT Prior to the vote on bids, the Superintendent of Schools noted that at this particular time of the year, it was necessary to submit bids and BIDS: order supplies which were needed for the next school year. He said that General-Art the 1981-82 budget included funds for all such supplies, but since the bud- Supplies; get had not been voted, and, due to the uncertainty of State funding, the Duplicating bids were being submitted for approval with the understanding that even Supplies; though they were accepted at this particular time, he may not authorize Custodial Mr. Maclnnes to spend any money, if the budget or State reimbursements Supplies; changed significantly. Floor Supplies Evaluation Upon the recommendation of the Superintendent of Schools, it was Services for Special Educe- VOTED: to accept bids as listed on the attached sheets. (Gaudet, Swan- tion Program son, Unanimous) Upon the recommendation of the Superintendent of Schools, it was PERSONNEL VOTED: to accept personnel changes (Certified) as listed on the attached CHANGES sheet. (Beck, Shaw, Unanimous) Upon the recommendation of the Superintendent of Schools, it was VOTED: to accept the election of the following staff for the school year 1 Page 22 'I April 27, 1981 it 1981-82, at the step and level indicated on the attached sheet. . RE-ELECTION (Gaudet, Swanson, Unanimous) OF NON- TENURED STAFF An informational memorandum was presented to the School Committee listing the three elected Student Advisory Board members for the year 1981- STUDENT ADVI- 82. They are as follows: Mark Splaine, Paul Vittimberga, and David Hilzen- SORY BOARD TO rath. It was added that two more delegates would be added in the spring. THE SCHOOL COMMITTEE The Superintendent of Schools introduced the report of the Comprehen- sive Test of Basic Skills, which were administered to the system in Sarnia- RESULTS OF ary of 1981. He said that he was pleased with the results and that an a- LEXINGTON'S nalysis was being made. He noted that there was an unusual pattern occur- TESTING ring - students were gaining and holding high test scores in the fourth and PROGRAM sixth grades, which normally did not occur with students in fourth and sixth grades. He said the results were a compliment to the ability of the students and to the competence of the teaching staff. 0 Dr. Monderer then reviewed the results of the CTBS scores. He noted that they differed from the mandated Basic Skills tests required by the ' State. He added that the CTBS rated achievement in the following areas: Reading Vocabulary and Comprehension, Language Usage, Capitalization, Punc- tuation, Spelling, Mathematics, and Reference Skills. He added that Lex- ington's second, fourth, and sixth graders were at least one school year a- head of their grade levels and well above the national average at all grade levels. He summarized by noting that Lexington students at the fourth grade performed above expectations in Reading Vocabulary,Reading Comprehension, Language Expression, Language Mechanics, Math (applications and computations), Reference Skills, and performed as expected in Spelling and Math concepts. There were no areas in which the students performed lower than expectation. He said that this was the first time that there were no areas in which the average Lexington students performed less than expected. Mr. Michelman indicated that there was another positive feature of the testing program. Students in grade six were performing at a much more even rate than one might predict. He said he felt that this indicated that staff were responding in an appropriate fashion to the needs of students. The School Committee thanked Dr. Monderer for the report and complimented the staff and students for their achievement. Dr. Beck said that it had been noted that the Selectmen marched in the PATRIOT'S morning Patriot's Day parade each year. The question had arisen as to why DAY PARADE School Committee members did not participate in the parade since it was child-centered. He added he supported the idea of School Committee parti- cipation. After a brief discussion, it was agreed that the Chairman of the School Committee would pursue, with the appropriate Town representatives, the possible participation of School Committee members in the morning Patriot's Day parade. It was VOTED: to adjourn at 8:43 p.m. to executive session for the purposes of EXECUTIVE discussion of a collective bargaining matter. (Beck; yes; Swanson, SESSION yes; Shaw, yes; Gaudet, yes; Michelman, yes) Page 23 April 27, 1981 The Chairman announced that the School Committee would not be return- ing to public session. Resp- 'fully submit d, /// ‘.'c and H. B- es Recording -cretary /c SC}IED5LE OF PAYMENTS The following schedules of payments were available for scrutiny and approval prior to this meeting: SCHOOL DEPARTMENT BUDGETS Personal Services April 3, 1981 Professional Payroll #20 $458;723.13 April 10, 1981 Classified Payroll #22-C 112,361.87 April 17, 1981 Professional Payroll #21 460,239.74 Expenses April 10, 1981 Sill Schedules #229 6,412.79 April 10, 1981 #230 -- 57.90 . April 10, 1981 #231 57,235.07 April 10, 1981 #232 19,963.05 April 17, 1981 #233 1,459.51 April 17, 1981 #234 9,356.20 April 17, 1981 #235 15,751.90 April 17, 1981 #236 20,709.28 April 24, 1981 #237 4,161.00 April 24, 1981 #238 25,807.81 April 24, 1981 #239 2,863.84 Expenses (Carryover 79-80) April 24, 1981 Bill Schedule #327 18.20 SPECIAL PROGRAMS - NON-LEXINGTON FUNDS Adult Education April 3, 1981 Professional Payroll 1,176.60 April 10, 1981 Classified Payroll 17.66 April 17, 1981 Professional Payroll 1,534.74 Driver Education April 3, 1981 Professional Payroll 704.43 . April 17, 1981 714.70 April 10, 1981 Bill Schedules #13 24.00 April 24, 1981 #14 10.00 Bus Tickets April 10, 1981 Bill Schedule #7 1,599.90 Metco Program April 3, 1981 Professional Payroll 5,569.97 April 10, 1981 ' Classified Payroll .4,021.55 April 17, 1981 Professional Payroll 5,942.25 April 24, 1981 Bill Schedule #17 130,97 (Over) -- Pnpil-School Matr. Rec. April 10, 1981 Bill Schedules #8 $ 30.50 t April 24, 1981 #9 1,118.52 Project Mainstream April 3, 1981 Professional Payroll 654.31 April 17, 1981 654.31 Transition to Employment April 3, 1981 Professional Payroll 2,559.68 April 10, 1981 Classified Payroll 217.32 April 17, 1981 Professional Payroll 910.93 April 10, 1981 Bill Schedule #14 71.08 Project Discover April 3, 1981 Professional Payroll 790.12 April 17, 1981 790.12 April 10, 1981 Bill Schedule 4#12 7.50 , Project Assist April 3, 1981 Professional Payroll 238.61 i. April 17, 1981 - 238.61 H. Project Enhance April 3, 1981 Professional Payroll 939.69 April 10, 1981 Classified Payroll 918.35 April 17, 1981 Professional Payroll 939.69 April 10, 1981 Bill Schedules #13 7.88 April 24, 1981 #14 20.09 Project Combine April 10, 1981 Bill Schedules #4 2,167.00 April 17, 1981 #5 1,000.00 . _ Bi-Lingual Education April 3, 1981 Professional Payroll 204.00 Art. 44 Energy April 10, 1981 Bill Schedule #11 40,319.20 $IDS - GENERAL AND ART SUPPLIES On March 13, 1981, requests for unit prices on items for general and art supplies were invited from forty-one companies. The bid was also advertised in the March 19, 1981 issue of the Lexington Minute-Man. Specifications were drawn for one hundred forty five items, including over 300 bid possibilities depending on size, color, etc. The specifications were based on items used in our school system, considering past successful experience as to standard, quality and price. The quantity specified was based upon past experience. We have included requests by other town departments in our quantities. Sixteen sealed bids were received and opened at a public reading at 1:00 p.m. on Tuesday, March 31, 1981. In many cases, suppliers indicated a minimum order of $25-250 per school without shipping charges. This had to be considered in the final determination for making awards. After careful analysis of price, quality and actual tests performed on samples submitted, it is recommended that orders be placed in the following approximate totals to the following low bidders meeting specifications: American Cutlery and Hardware Inc. 390.30 Charrette Corporation 2,500.33 Cutter Ceramics 758.00 J. L. Hammett Co. 9,124.11 Litton Office Products 350.44 Modern School Supplies 61.60 New England School Supplies 8,046.39 Plasticoid Products, Inc. 279.65 Henry S. Wolkins Co. 17,106.55 $38,617.37 In each case, the low bidder meeting specifications received the award, except when shipping charges would alter the price quoted. No bids were received on the following items: {49C, Address Labels, #623, Ko-Res-Type for Polyethylene Ribbon (combine with 62A) , #65E Typewriter RI-cor combination eraser, 4479 Pastel Paper, #144 Pencils (wash out cloth marking). These items are purchased in small quantities and will be purchased locally. Prices on the larger volume items ($500. or more) have shown the following trends since last year's bid. Increases : Memo Pads, .15 pkg. (8.8%) , $118.35 overall order; Arithmetic Paper, .08 pkg. (7.9%) , 42.40 overall order; File Folder, Letter Size, .18 box (5.3%) 51.84 overall order; Masking Tape, 3/4" x 60 yd. , .019 each (4.19,) 2.77 overall order; Vellum Drawing Paper, .20 pkg. (2.8%) 29.20 overall order; Construction Paper uve. .129 per pkg. (8.7%) 110. 17 overall order; Kraft Paper Rolls, colored, 13.09 per roll (42.77), 183.26 overall order (this is a change in quality) ; Tempera Paint, .29 per pt. (choice of quality) (11.79,) , 104.11 overall order. (Over, please) ElM $AL AND ART $UP'PLISLCont.) Decreases: Pencils w/erasera, .011 dos., (2.0%), 23.41 overall attar; Composition Paper .14 pkg. (6.9%), 212.10 overall order; Kindo8rsph Crayons .189 doz. hoses (1.6%), 11.66 overall order; Tempera Paint, .305 pint (choice of quality) (12.3%), 109.50 overall order. I i • • • 6 BID - DUPLICATING SUPPLIES On March 13, 1981, requests for unit prices for items of duplicating supplies were invited from thirty two companies. The bid was also advertised in the March 19, 1981 issue of the Lexington Minute-Man. Specifications were drawn for thirty two items. The specifications were based on items used in our school system, considering past successful experience as to standard, quality and price. The quantity specified was based upon past experience. • Sixteen sealed bids were received and opened at a public reading at 1:00 p.m. on Tuesday, March 31, 1981. After careful analysis of price, quality and actual tests performed on samples submitted, it is recommended that orders be placed with the following companies in the following approximate totals as shown below. In each cast, the lowest bidder's product has been selected that meets specifications. Minimum order requirements, delivery charges and actual performance tests were considered in evaluating those items meeting specifications. Approximate Vendor Item Total Audio-Visual Educational Systems 19 $ 26.90 Carter Rice Storrs & Bement Co. 12, 13A,B,14,15, 32A,B,C 5,033.08 A.B.Dick Company 21,28,29 369.28 General Binding Corp. 26A,B,C 1,096.20 Gestetner Corp. 17 71.50 S. L. Hammett Co. 20,24 ,25 229.51 Mainco 1-11 25,450.48 New England School Supply 18, 30,31 505.44 $32,782.39 We did not receive any bids on items #22 (Lumocolor Overhead Markers) and X623 (Lumocolor refills)and #27 (Overhead Transparent Sheets). We are also rejecting item: - #16 (Index Card Stock) as we can purchase this item locally at less cost. The quantities of these items is low and we will purchase them separately. Prices on the larger volume items have shown the following trends since last year's bid. Increases: Duplicating Fluid .01 per gal. (.4%) or $7.60; Plain Duplicating Masters - Short Run .198 per box (6.0%) or $86.53 overall order; Transofax Spirit Masters .17 per box (5.3%) or $15.30 overall order; Laminating Film avg. $1.114 per ,roll (10.8%) or $107. overall order; and White Bond Paper .025 (1.1%) or $20.23 overall order. Decreases: White Duplicating Paper .23 per ream (10.8%) or $2335.19 overall order; White Mimeo Paper .23 per ream (10.8%) or $177.79 overall order, Ruled Duplicating Masters .87 per box (24.4%) or $44.37 overall order, Xerocopy Paper .01 per ream (.5%) or $9.10 overall order, and Direct Reading Transparencies .54 (2.7%) or $12,42 overall order. This year again we included a request for vendors to bid on recycled products as alternates. We did not receive any bids for recycled products. We did include another alternate request that the duplicating paper and fluid be bid with the possibility of 2 or 3 deliveries during the year rather than one delivery. There was a hid on a 2 delivery basis by Mainco and the choice will be left to the schools. BIDS - CUSTODIAL SUPPLIES On March 31, 1981, invitations for bids for custodial supplies and equipment for the Lexington Public Schools were sent to sixteen companies. The bid was also advertised in the April 2, 1981 issue of the Lexington Minute-Man. Specifications were drawn on fifty-five items and were based on items used or tested in our school system. The approximate quantities were based on our past csperience. We have included requests by other town departments in our, bid quantities. Sealed bids were received from twelve companies and were opened at a public reading at 2:00 p.m. on Monday, April 13, 1981. After careful analysis of price and quality, it is recommended that orders be placed with the following companies in the following approximate amounts as shown below. In all cases, the lowest bidder's products has been selected that meets specifications, or where total unit prices or delivery charges were considered. Calico Industries, Inc. 38, 39 $ 238.11 Connie Chemical Co. 2-4,9,10,16('0, 19,25, 37,43,44,47,52 1,870.71 Edison Chemical Co. 5,8,11-15,17,18,20-22, 26,28-36,40-42,45,46,48, '"50,51,53,54 5,113.67 Fuller Brush 16('x) , 23,24 156.47 M. D. Stetson 1,6,7,27 253.05 $7,632.01 No one bid on Item #55 (Valay Tissue Dispensers) ; we will purchase this item locally. The above companies are known to us -and have been successful bidders in the past. Their performance has been satisfactory. Prices in general increased over last year's bid prices. Some major items (purchases of $300. or more) changed as follows: Increases : Concrete Kote, .90 per 5 gal container (3.6%), $7.20 overall order, Bab-0, .75 case (8.1%), 24.75 overall order; Buffing Pads, range of 2.25-3.30 case (16.4%), 40.05 overall order; Luron Soap Powder, 3.60 case (15.17.), 46.80 overall order; Antonia, .29 case (4.8%), 11.60 overall order; Soilax, 2.05 case (18.77.), 53.30 overall order; Lestoil, 4.75 case (31.3%) , 95.00 overall order, Fantastic, 1.65 case (10.2%), 26.40 overall order. Decreases: Disinfectant-Detergent, 1.25 per 5 gal container (7.7%), 20.00 overall order; Disinfectant Spray, 3.55 case (15.8%), 42.60 overall order, Floor Brushes, range of .71-5.16 each, (14.6%), 92.24 overall order. The overall cost would be an increase of $300.00. _ ..... - 4 BIDS - FLOOR WAX, FLOOR FINISH AND FIOOR CLEANER On April 1, 1981, invitations for bids fcr floor wax and cleaner for the Lexington Public Schools were sent to four companies. The bid was also advertised in the March 31, 1981. issue of the Lexington Minute-Man. Specifications were drawn on three items and were based on floor wax, floor finish and cleaner which has been used or tested in our school system. ' The approximate quantity was based on our past experience. Sealed bids were received from four companies and opened at a public' reading at 2:00 p.m. on Monday, April 13, 1981. The bids received were in accordance with strict specifications that include not only a detailed chemical breakdown, but also a performance test clause which, in effect, means that any bidder who is to be considered for an award must have had his products tested by the Lexington Public Schools in strict accordance with performance standards. After careful analysis of price and quality, it is recommended that orders be placed at the approximate total of $3696.00 with the M. D. Stetson Company. Their products were used this year, and their products and service have been satisfactory. The other companies bidding were Connie Chemical Co. ($3763.00) and Ginsburg Brothers ($3420.86), disqualified because their specifications have been changed since the last test or purchase, and Fuller Brush Company ($5163,46). The per gallon price for the products are as follows: floor wax ($3.00) , fluor finish ($3.00) and floor cleaner ($2.27). This is an increase of .10 per gal. for floor wax and finish (3.4 ), $60.00 overall order, and .30 per gal, for floor cleaner (10.1X), $144.00 overall order. BIDS - EVALUATION SERVICES TO THE SPECIAL EDUCATION PROGRAM On March 206 1981, invitations for proporals were sent to nine companies and/or individuals for evaluation services to the Special Education Program. The bid was also advertised in the March 26, 1981 issue of the Lexington Minute Man. The specifications provided bidders with a set of facts about the school system and detailed the tasks that were to be performed. The contractor, working with the Director of Pupil Services and the Administrator of Special Education, is to analyze "Individual Education Plans" and to develop a preferred level of speci- ficity of the IEP's in the different prototypes within our system. This is to improve potential for guiding and monitoring "student achievement. In addition, we are to receive reports on levels of achievement of specific objectives and movement by students between prototypes. The contractor is also to develop a system adaptable to computerization which would enable us to integrate the method of analyses used which would permit regular review of grouped students' attainment of goals and objectives. Sealed bids were received from two companies and opened at a public reading at 12:00 noon on Friday, April 3, 1981. They were as follows: Public Affairs Research Institute $7,890. New England School Development Council 9,000. After careful review and analysis of both proposals, as well as receiving excellent responses in checking references, we feel that the low bidder is fully qualified to perform the contract.'' The funding for this project is to come from Project Combine (PL 94-142). The specific amount included in the grant is $7500. We have been in contact with the funding office in. the Massachusetts Department of Education and have been assured that a transfer of $390.00 within the grant would be approved. 1 • PERSONNEL CHANGES - CERTIFIED RESIGNATIONS YRS. IN LEXINGTON EFFECTIVE REASON ) MATERNITY LEAVE OF ABSENCE CHANGE IN ASSIGNMENT ) LEAVE OF ABSENCE RE-ELECTION OF NON-TENURE STAFF SECOND ELECTION LEVEL/ SCHOOL NAM " GRADE/SUBJECT STEP SALARY COMMENTS FOURTH ELECTION (TENURE) (See back-up sheets following) These people have previously received three contracts and are recommended for tenure election at the level and step indicated. LEVEL/ SCHOOL NAME GRADE/SUBJECT STEP SALARY COMMENTS