HomeMy WebLinkAbout1979-12-04-SC-min Page 98
December 4, 1979
A meeting of the Lexington School Committee was held on December 4,
1979, at 8:00 p.m. , at the School Administration Building. Those in at-
tendance were: Brown, Swanson, Michelman, Gaudet, Shaw, and student rep-
resentative Dohan. Also present were: Lawson, Pierson, Monderer, DiGiam-
merino, and Barnes.
It was MINUTES
10/16/79
VOTED: to accept the minutes of October 16, 1979, as presented.
(Swanson, Michelman, Unanimous)
It was MINUTES
11/20/79
VOTED: to accept the minutes of November 20, 1979, as amended.
(Michelman, Gaudet, Unanimous)
Upon the recommendation of the Superintendent of Schools, it was SCHEDULE OF
PAYMENTS
VOTED: to accept the following schedule of payments: (Gaudet, Swanson,
Unanimous) (See attached sheet.)
Upon the recommendation of the Superintendent of Schools, it was EXTRA DUTY
STIPENDS
VOTED: to accept the following extra duty stipends as listed on the
attached sheet: (Michelman, Gaudet, Unanimous)
Upon the recommendation of the Superintendent of Schools, it was PERSONNEL
CHANGES
VOTED: to accept the following personnel changes (certified) as listed (CERTIFIED)
on the attached sheet: (Michelman, Swanson, Unanimous)
Upon the recommendation of the Superintendent of Schools, it was PERSONNEL
CHANGES
VOTED: to accept the following personnel changes (classified) as (CLASSIFIED)
listed on the attached sheet: (Gaudet, Michelman, Unanimous)
Upon the recommendation of the Superintendent of Schools, it was BIDS -
FOOTBALL
VOTED: that the bids for football equipment reconditioning be awarded EQUIPMENT
as indicated to the following low bidders meeting specifications: RECONDITIONIP
(Michelman, Swanson, Unanimous) (See attached sheet.)
Frank DiGiammarino, Coordinator of Planning, presented an analy- ANALYSIS OF
sis of statistics showing planning versus actual enrollment data for PLANNING VS.
the school year '70-'80. He noted that it was an attempt to analyze ACTUAL ENROLL
the differences between '78-'79 enrollment plans and the ' 79-'80 LENT DATA FOR
actual enrollment figures. He noted that he had contacted and worked
with the Coordinator of Census Takers, the Town Clerk, the Manager of
the Computer Center, and a consulting firm (LHS Associates) who pro-
vides reports to Town on census data. He stated that he wished to
clarify that the overall discrepancy between projected and actual en-
rollment was within a 2.2% margin error for the system. He noted that
the findings had led to a number of corrections , namely, an in-depth
study of the Adams School census data, detailed inspection of the con-
sulting firm handling of the report. In the discussion which followed,
Page 99
December 4, 1979
it was noted that there were still unexplained differences between pro-
jected and actual enrollment at the 9th grade level.
He concluded his report by noting that the monitoring of census-
taking procedures would be increased. The census-taking procedures
would be updated annually to incorporate the Lexington Public School
changes in school districts. The consulting fiuu will meet specific
requirements of the Lexington Public Schools for the purposes of pro-
jection enrollments. The manager of the Computer Center will document
each job activity in order to facilitate continuity in the processing
of data. He then proceeded to explain the actual statistics and charts
accompanying his report.
The School Conm_ittee thanked Dr. Frank DiGiammarino for the com-
prehensive and interesting report.
A report was presented under the direction of Geoffrey Pierson, DRAMA PROGRAM
Assistant Superintendent for Curriculum. Presenting the report were
Priscilla Sanville, Drama Specialist; Valerie Norwood, Drama teacher;
and Ronald Godfrey, systemwide Drama Committee. The areas commented
upon were the following:
- The history of the program since 1977
- The Drama Program, K-12
- In-Service training
- Evaluation of program
Following the presentation by each of the participants, the School
Committee members posed questions to the panel. Mr. Michelman compli-
mented the Committee for the presentation and also for the analysis by
the Superintendent during his introduction to the Lexington Public
Schools. The Committee echoed the remarks of Mr. Michelman.
A report of the K-12 Social Studies Program was presented by SOCIAL STUDIE
Robert Davenport, Social Studies Department Head for Grades 7-12; PROGRAM
George Carr, Social Studies Chairperson at Clarke Junior High School;
William Terris, (Principal, Estabrook School) , Elementary Program
Manager; Geoffrey Pierson, Assistant Superintendent for Curriculum.
Following the comprehensive report, a question and answer period
followed.
A status report regarding Phasing Recommendation (B) was pre- PHASING
sented by Geoff Pierson. Mr. Michelman said he had been in contact RECOMMENDATIC
with the Superintendent, and suggested that the School Committee, (B)
at present, would perhaps never vote on a more important and sensi-
tive matter of educational policy as it would when it would vote on
phasing recommendations. Therefore, he said he felt that all would
he interested in the kinds of discussions the staff would have, and
suggested that the School Committee and junior high staff get to-
gether in. a forum to discuss the form of the final set of recommen-
dations. The Superintendent supported the suggestion. The School
Committee thanked Dr. Pierson for the report.
It was
Page 100
December 4, 1979
VOTED: to adjourn at 10:31 p.m. 0Aichelman, Swanson, Unanimous)
Respectfully submitted?
*Richard H. Barnes
Recording Secretary
is
•
• SCHEDULE OF PAYMENTS
The following schedules of payments viers available for scrutiny and .
approval prior to this meeting:
SCHOOL DEP#PTNJ NT BUDGETS
Personal Services
November 23, 1979 Classified Payroll #12-7, $75,307.22 •
November 16, 1979 Professional Payroll -7(h0 459,102.75
Expenses
November 23, 1979 Bill Schedules #97 12,191;19
November 23, 1979 P98 5,144.90 -
November 23, 1979 e99 5,766.82
November 23, 1979 #100 161.95
November 23, 1979 #101 9,442.51
November 23, 1979 #102 4,856.60
November 23, 1979 #103 2,149.38
November 30, 1979 :; 104 4,792.99
November 30, 1979 #105 1,734.57
November 30, 1979 #106 2,685.90
November 30, 1979 1107 11,620.56
November 30, 1979 6108 10,676.40
Expenses (Carryover)
November 30, 1979 Bill Schedule ;x332 309.79
Out-of-State Travel
November 23, 1979 Bill Schedule #6 208.08
November 30, 1979 47 1,080.80
SPECIAL PROGRAMS - NON-LEI YCTON FUNDS
Adult Education
November 16, 1979 Professional Payroll ,71-P 41022
November 27, 1979 Classified Payroll L-C 1,438,56
Driver Education
November 16, 1979 Professional 1''.tnll 1,247,15
November 23, 1979 Bill Schedule #3 108.63
Metco Program
November 16, 1979 Professional Payroll 5,514.96
November 23, 1979 Classified Payroll #6-C 1,850.99
November 23, 1979 Bill Schedule #5 135.83
November 30, 1979 #6 62,94•
Transition to Employment
November 16, 1979 Professional Payroll 1,281.23
November 23, 1979 Classified Payroll #c-C 104.40
November 23, 1979 Bill Schedule #15 95.44
(Over)
Project Discover
November 16, 1979 Professional Payroll 622.65
November 23, 1979 Bill Schedule 84.00
Project Assist
November 16, 1979 Professional Payroll 195.00
Project Mainstream
November 16, 1979 Professional Payroll 691.97
November 23, 1979 Bill Schedule 750.00
Project Enhance
November 16, 1979 Professional Payroll 765.77
November 23, 1979 Classified Payroll 01 589.96
Miscellaneous Projects
November 23, 1979 Occupational Information #3 142.00
November 23, 1979 Observing the Pre-Schooler #3 36.59
November 23, 1979 Internal Combustion #4 62.31
DRAMA STIPENDS - 1979- 1980*
School Name Stipend for: Amount
*Stipend to be paid at the conclusion of the activity or the school year, 1979-80.
PERSONNEL CUA Gt_S - ( MA ' :1F IRE ...
TRANSFER
EFFECTIVE
NEW PERSONNEL
RESIGNATION
YRS . IN LEXINGTON EFFECTIVE REASON
RETLREI'IINT
•
PERSONNEL CILANCE:1 -
RESIGNATIONS
IRS. IN LEXINGTON EFFECTIVE REASON
•
(Over)
BIDS - 1979 FOOTBALL EQUIPMENT RECONDITTONING
On November 9, 1979 requests for bids for reconditioning of football equipment
were invited from two companies. The bid was also advertised in the November 15, 1979
issue of the Lexington Minute-Man.
Specifications were drawn for the repair d reconditioning of seven items with
a per item price for additional charges for specific parts, Of their replacement is
needed. The approximate quantities were based on previous experience.
Two sealed bids were received and opened at a public reading at 1:30 p.m.
on Monday, November 26, 1979.
A recap of the bid is as follows:
Last Year's
Phil Murray Co. ,Inc, Sportcraft, Co. Bid Price
Item Unit Total Unit Total
1. Helmets - Recond. •
Clean & Sterilize 5.75 1150.00 ' 4.75 950.00 3.75
Specific replacement 9,00 6.00 3.00
parts to to to
16 items 5c 916.20 1 15C 761.40 25c
SUB TOTAL $2066, 20 P $1711.40
3
2. Shoulder Pads
Clean & Sterilize 4.25 743.75 5.95 1041.25 5.25
& replace parts
1
3. Thigh Guards - clean
only .30 60,00 .40 80.00 ,25
4. Knee Pads - clean only .15 30.00 . 25 50.00 .25
5. Girdle Pads - clean only 1. 25 250.00 1.50 300.00 .15
6. Hand, Forearm, elbow
pads - clean only . 20 20,00 .50 50.00 . 25
7. Pants - Sew & Replace
•
pockets 2.00 100.00 3.00 150.00 3.50 -
•
SUB TOTAL 2-7 $1203.75 j $1671.25
TOTAL ESTIMATED COST $3269.95 $3382.65
Both companies have been successful bidders in the past and performed satisfactorily.
The budget for this service is $3045. The above totals $2915.15, This is
an approximate total and will increase or decrease with the actual number of pieces
to be cleaned or reconditioned, r_nthe event that we do exceed the budgeted amount,
the difference will be transferred from other accounts within the athletic budget,