HomeMy WebLinkAbout1935-12-20REPORT OF PIANNUIG BOARD
IDecember 20, 1835
Present: Messrs Duffy, Ellis, Kimball, Robinson and Sellars
Town Engineer Cosgrove part time.
Mr. Cosgrove submitted a tracing covering the proposed
layout of the Circumferential Highway. Discussion centered
around the crossing at the railroad which had been shown as
at the underpass while the consensus of opinion was that
sufficient clearance and satisfactory drainage could not
both be accomplished, the obtaining of engineering data to
substantiate the opinion would run into some expense, and
that Mr. Cosgrove should proceed to obtain the necessary
prints as drawn.
The draft of a letter to the State Planning Board was
considered but not closed.
Mr. Cosgrove explained the Fletcher Avenue situation
and presented a proposed layout which was in effect an ex-
tension of Sherman Street. Heavy construction in the way
of a ledge would make this a relatively expensive project.
Mr. Duffy is not convinced of the full rights of the order
closing the street. Alternative routes were considered
but no decision reached.
The Merriam Factory site was again discussed in de-
tail and no new angles being developed, the following vote
was recorded:
C ircum-
ferential
Fletcher
Avenue
Voted:
That the board take no action towards changing
the
status of area on Oakland Street now occupied
by
the buildings known as Merriam•s Factory for
the
following reasons:
Merriam
1.
To maintain the original intention of zoning Factory
this area for one family houses. Site
2.
The erection of an avartment would tend to
impair the status of the neighborhood.
3.
The board is of the opinion that there is in-
sufficient demand for so-called multi -family
houses to warrant financial success, but to
the contrary that the demand is increasing
for the smaller type residence which would be
more appropriate for this district.
Adjourned:
11 P.M. E. W. Kimball