Loading...
HomeMy WebLinkAbout1935-12-20REPORT OF PIANNUIG BOARD IDecember 20, 1835 Present: Messrs Duffy, Ellis, Kimball, Robinson and Sellars Town Engineer Cosgrove part time. Mr. Cosgrove submitted a tracing covering the proposed layout of the Circumferential Highway. Discussion centered around the crossing at the railroad which had been shown as at the underpass while the consensus of opinion was that sufficient clearance and satisfactory drainage could not both be accomplished, the obtaining of engineering data to substantiate the opinion would run into some expense, and that Mr. Cosgrove should proceed to obtain the necessary prints as drawn. The draft of a letter to the State Planning Board was considered but not closed. Mr. Cosgrove explained the Fletcher Avenue situation and presented a proposed layout which was in effect an ex- tension of Sherman Street. Heavy construction in the way of a ledge would make this a relatively expensive project. Mr. Duffy is not convinced of the full rights of the order closing the street. Alternative routes were considered but no decision reached. The Merriam Factory site was again discussed in de- tail and no new angles being developed, the following vote was recorded: C ircum- ferential Fletcher Avenue Voted: That the board take no action towards changing the status of area on Oakland Street now occupied by the buildings known as Merriam•s Factory for the following reasons: Merriam 1. To maintain the original intention of zoning Factory this area for one family houses. Site 2. The erection of an avartment would tend to impair the status of the neighborhood. 3. The board is of the opinion that there is in- sufficient demand for so-called multi -family houses to warrant financial success, but to the contrary that the demand is increasing for the smaller type residence which would be more appropriate for this district. Adjourned: 11 P.M. E. W. Kimball Clerk -Pro Tem