HomeMy WebLinkAbout1930-06-03 t,x<. 74- {': ,p.„_ }" , -F. " y i17' r. .'t .. pS - '.± r7v". W &�+ " 'M .SF 'f : ._
iPLANNING BOARD MEETING
Lexington, Mass.
June 3, 1930 .
Present:- Emery, Milne, Duffy, Scheibe, Town Engineer,
Assistant Town Engineer, and clerk.
Mr. Alexander Quinn of Grant Street has asked
for information on Oakland Street extension. Maps of
this location were explained by Asst Town Engineer. Oakland
The matter was referred to the Town Engineer to present Street
at the next meeting, if possible, a layout of direct Extension
extension through with profile and estimate of wall
construction and filling and preliminary showing con-
tinuously-the road from Hancock Street through to Woburn
Street, and preliminary estimate of cost for each part
of the new sections to be built. A letter was sent
'°'r. Q .inn informing him that the matter was considered
at the meeting but no definite information could be
given at that time.
The school lot plan was- discussed and examined.
I The Town Engineer is to furnish a sketch and
data showing the widening and improvement of Allen St.
from Waltham Street to Middle Street and the improve-
Allen St .
ment of Brookside Avenue in view of furnishing proper Improvement
approaches to the proposed school house site .
In studying the proposed water supply for the
Middlesex County Hospital, the Planning Board believes Water
it advisable at this time to consider an auxilliary at M. C.
line from the Arlington Standpipe . Described in a general Hospital
way, this line would follow along the Arlington-Belmont
boundary line to connect with Bowman Street and/or Water-
town Street continuing to P asant Street.
The meeting was adjourned at 10:55 P. M.
Respectfully submitted,
9
1 M Clerk
i
i
vi'ii. ._� Jillilliffilil
ua V I I I II II I I IIIi 11 IN