HomeMy WebLinkAbout1953-12-18217
BOARD OF HEALTH MEETING
December 18, 1953
A regular meeting of the Board of Health was held Friday,
December 18th., 1953 at 3.00 P.M. in the Selectmen's Room,
Town Office Building. Mr. McQuillan, Chairman, Dr. 'Cosgrove,
and Mr. Cole were present. Mr. Richard Jackson, Health Sani-
tarian and the Clerk were also present.
At 3.20 P.M. Mr. James Carrig and Mr. Robert Carrig met
with the Board re: Minute Man Highlands, bection 4. Minute
Man H lds.�l
Mr. Cole said he had looked over the report made by Whitman
& Howard very carefully and was rather dubious about it. This
set-up calls for 81 houses and some of this land is swamp.
Mr. Carrig agreed this was so, but stated that they had
the same condition in Section 1 and 3, and it worked out sat-
isfactorily with no water whatever in the cellar.
Mr. McQuillan agreed that some of the land was good and
could be approved for building but certain lots could not be
approved in their present condition.
Mr. Cole said that even if fill was put in the swamp, you
would still be faced with the brook being contati.nated.
According to Whitman & Howard's report they do not approve
of this section.
Mr. McQuillan stated that the Board is doing all the
engineering to produce lots for the developer, also fearful
that we might have all kinds of trouble with sewage. To put
sewers in later would cost over one million dollars in this
section.
Mr. Carrig stated that in Section 1, they suggested the
system of having the engineer check the area and paid the
engineer's fee in Section 1, 2, and 3 to do this, and agreed
to do anything that the Board suggested.
The Board expressits desire to talk this situation over
with Mr. Lucas of Whitman & Howard and get a more detailed
report and would then get in touch with Mr. Carrig.
Mr. Carrig retired at 3.55.
Mr. Lucas of Whitman & Howard met with the Board at
4.00 P.M. to discuss the problem arising in the Battle Green
subdivision and also the Minute Man Highlands Section 4
development.
Mr. Lucas - I haven't
area but apparently it is
sewer. It plugged up the
field to the main street.
tor pipe which plugged up
Battle
Green
had a chance to see the Battle Green
plugged up where it goes into the
stone trench coming from the leaching
Mr. Jackson said it was the collec-
, so it couldn't go into the stone drain.
218
Minute Man
Highlands
Mr. Lucas stated that the collector pipe should have been
covered with stone. If crushed stone wasn't put around the
collector pipe, there would be trouble. Mr. Jackson said
there was stone put around it. Mr. Lucas said that now he
is specifying a little more in detail what should be done.
Mr. McQuillan questioned Mr. Jackson if he felt that
everything was done by the builder that was supposed to have
been done, and Mr. Jackson said he did.
Mr. Lucas - I would say this, that if everyone of these
leaching fields were 1* to 2 feet above the main drain, so
that if the drain was adequate, it is enough to go into that
drain.
Mr. Cole - The pipe from the road is stopped before it
connects to the catch basin, what are we going to do?
Mr. Jackson - They are putting a catch basin right by
Paul Revere Road to take care of this, and the large pipe
will be connected to the catch basin.
Mr. Cole - What they should do is put an underground pipe
for the brook or they will always have a gouge there.
Mr. Lucas - What did they notice first? Did the water
come up from the ground?
Mr. Jackson - The water backed into the house.
Mr. Lucas - This would mean that the connection to the
drain is plugged up. It would mean taking out and putting
in 3/4 to 1 - of stone and making a good big trench and cover
the top with pea stone.
Mr. Cole - On this set-up, when it comes out of this
leaching field, is it pure?
Mr. Lucas - According to the State it is supposed to be.
Most of it will go along horizontally on filter bed, 24 to
30 inches of sand, and supposed to be pure - dot for drinking
water of course.
Mr. Arthur R ocque's letter pertaining to this particular
was read and the suggestions noted.
Mr.Cole stated that in putting a lot of houses in one
area, the general area gets overloaded with sewage, and sooner
or later there is going to be a demand for a sewer.
Regarding the Minute Man Highlands section 4 development,
Mr. Cole stated that he was dubious about this on account of
the swamp and feels that the builder should fill up the swamp.
Mr. McQuillan - Mr. Carrig says that Section 1 and this
Section are not any worse than the others.
Mr. Lucas - Part of the other section was bad, they had a
bad situation and everything seems to be alright.
1
1
219
Mr. Cole - Don't you think that these low lots in the
swamp should be filled with 2 feet of fill?
Mr. Lucas - First would be to make the elevation bf the
drains. It has to come up high and could be then satisfactory.
Would have the drain cellar 2 ft. above the top of drain.
The Board does not feel that this report is complete enough
and suggests that Mr. Carrig have an engineer inspect each lot
and make a report to Whitman& Howard as our engineers. They
also feel that the developer should stand the expense of
locating the lots, making the tests and making a definite
report on leaching fields. Up to this time the expense of
reporting on this area is over four hundred dollars. This
was the procedure followed by Mr. Carrig on Section 1, and
Mr. McQuillan requested Mr. Jackson to inform Mr. Carrig that
we would like to have him do the same thing on Section 4.
This report could then be presented to Whitman & Howard and
recommendations made to the Board on the entire development.
Mr. Spinelli met with the Board re: Fairbanks Road sub- Fairbanki
division. Whitman & Howard's report approved of this with Road
the exdeption of a couple of lots. The Boards approves this
subdivision subject to acceptance of the recommendations made
in the report by Mr. Spinelli. Mr. Spinelli does accept and
a letter was written to the Planning Board.
It was voted by the Board to request the Selectmen to Sewer
insert an article in the Town Warrant asking that a committee Survey
be appointed to make a study of the sewer problem in Lexington.
A' letter was also sent to the Planning Board advising them
that the Board decided that the proposed division of the re- Colonial
mainder of the land in the Colonial Acres Development should Acres
be entirely sewered.
Letters from Mr. Turcott and Mr. Roberts noted regarding
Sunnyfield sewer.
L.*.N.A. report for November noted.
Upon motion duly made and seconded, it was voted to grant License)
the renewal of the following permits and licenses - &
Permits •
John A. Sellars Pasteurization of Milk
Mrs. C. S. N•oussard Day Care for children
Mrs. Nancy Schock "
Unitarian to -Op. Nursery School
John Reardon & Sons Garbage
New England Rendering Co.
Walnut Farms Tust
Jas. F. Morse & 'Co.
Lowell Rendering Co.
Paone's Disposal Rubbish
Frederick D. Miller
McLaughlin & Delarue
Report of the Health Sanitarian for period November 20th.
to December 17th., 1953 noted.
The meeting adjourned at 5.00 P.M. A True Record, Attest Clerk