HomeMy WebLinkAbout2018-06-14 Summit Packet - Released
LHS SCIENCE SPACE DISCUSSION Complex Issues, Possible Solutions & Implications
Timeline
Timeline
THE NEED Looking at the space
Floor
st
= utilized
LHS 1RED85% or moreOccupied more than MSBA recommends and impacts flexibility re scheduling and use.
Utilization by Time
Floor
nd
= utilized
LHS 2RED85% or moreOccupied more than MSBA recommends and impacts flexibility re scheduling and use.
Utilization by Time
Floor
Not in
st
=
size and
LHS 1REDline with MSBA recommendationfornumber of spaces
Utilization by Area
Floor
nd
= Not in
size and
LHS 2REDline with MSBA recommendationfornumber of spaces
Utilization by Area
Floor
st
= utilized
size and
LHS 1RED85% or moreAND/ORNot in line with MSBA recommendationfornumber of spaces
Combined Utilization: Time & Area
Floor
nd
= utilized
in line with
LHS 2RED85% or moreAND/ORNot MSBA recommendation for size and number of spaces
Combined Utilization: Time & Area
Science Projected Capacity Shortfall
Science Shortfall by Year
week
week
week
week
week
periods needing a room per
periods needing a room per
periods needing a room per
periods needing a room per week
periods needing a room per
Chemistry class Physics class
Physics class Chemistry class
additional Biology class periods needing a room per
additional additional
2020202120222023
12 additional Biology class periods needing a room per week18 12 additional 12 additional Chemistry class periods needing a room per week18 additional Biology class periods needing a
room per week18 additional
6 6 additional Earth Science class 6
------
10 15 10 10 5 5 15 5 15
2019 2020 2021 2022
What does this mean?
100%
-
2020, and
Space needs are especially acute for Biology and Chemistry beginning 2019 Current science space utilization is 85% We need to create new science spaces ORAlternative scheduling and/or
change course sequences
IFTHEN
What does this mean?
THINKING THROUGH THE OPTIONS
move teacher
schedule open
course sequence
space;
main building
classrooms;
Space
IT
Create freshman wing in Schedule some students out of Use Science Lecture Hall space with renovationUse planning spaces for planningBetter utilization for existing blocksAdd morning
or afternoon blocks for extra science capacity; longer dayMove Use Common
Brainstormed possibilities 1.2.3.4.5.6.7.8.
at LHS
modulars
BUILD
2 classrooms/labs
-
TogetherOne at a timeReconfigure current spacesUtilize new
Add 1
sequence
Alternative schedulingChange course
Overview of Options
IMPACT
offs
Planning, lab preps, demonstration lessons, travel for teachersTeaching and learning
-
SOLUTION
Alternative scheduling of lab space
Programmatic Trade
IMPACT
offs
Allows more class sections to meet in each classroom, but
-
SOLUTION
Reduce AP instructional time from 6 to 5 blocks per week
Programmatic Trade
Next slide
2 year AP
implications
Would require sequence/program changesCreates a new space issue
year AP courses
nd
nd
year
AP courses
become 2
AP classes cannot be taught in 1 yr with reduced instructional time
More
classroom
sections per
Implications of 2
All
persist
disciplines
Graduation
students/All
requirements
Space issues
courses
year AP
Costs
courses
nd
Fewer AP
electives?
Addition of
PD
change
required
Materials,
Sequence
Licensure,
equipment
Implications of 2
BUILD
Find efficiencies within current spaceAdd new space outside existing footprint
sequence
Alternative schedulingChange course
Overview of Options
-
IMPACT
Maintains current science programRepurposing nonclassroom spaces as classroomsAddresses space issue but significant cost
at
2021)
-
2020)
-
current
modulars
ptions
time (2019
SOLUTION
O
Together (2019One at a
Add 2 classrooms/labsReconfigure spacesUtilize new LHS
Build
$359 per SF$389 per SF$463 per SF$286 per SF
Modulars
Modulars
Modulars
house renovations
-
Diamond Middle School Old + New New In
Costs per square foot
OTHER CONSIDERATIONS
LHS scheduling committeeSchool Committee review of graduation requirementsVisioning for future of LHSNEASC reaccreditation
Related ongoing initiatives
not an
learning and is
utilize alternative scheduling
immediate needs
ability to
the practice
scheduling will impact teaching and
schedule and configuration of science scope and sequence
aways
-
Higher student enrollments and sections will exceed current space capacityCurrent space limits Current requires more class meetings Alternative educationally sound Sequence changes will
take multiple years to implementAdds costs and new space implications
Current space does not fit sequence changesUnderstanding the cost, the recommendation is to build two classrooms/labs
Take
purchasing
-
contractors & pre
-
March 1, 2019
APRIL
-
FEB. 1, 2019
JULY 1, 2019
-
MID
AUGUST 30, 2019:
competion
APRIL
-
TIMELINE OF BUILD OPTION
Approval of design & construction fundsDesign Bid process begins Contract awardsContractor coordinating with submaterialsConstruction
FALL SPECIAL TOWN MEETING:NOVEMBER FEBRUARY 1 MARCH MIDJULY 1
2020 (short term)
Accepted or Not?
Space proposal for 2019
Decisions & Questions
30
Current Space Configuration
31
Modulars for displaced functions
School Committee
Space Planning Option 1
September 5, 2017
32
Diamond Modulars?
School Committee
Space Planning Option 2
September 5, 2017
33
Option 1 Visual
34
Option 2 Visual