HomeMy WebLinkAbout2024-01-26-SBC-min (Exterior and Interior Focus Group) MEETING NOTES d �Illv
Meeting Date: January 26, 2024
Project Name: Lexington High School
Project Number:
Subject: Exterior and Interior Focus Group Meeting
Attendees:
Present Name Affiliation Present Name Affiliation
Kathleen Lenihan SBC Chair&SC Member J Timothy Lee Design Advisory Committee
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
✓ SBC Vice-Chair&LPS Facilities
Michael Cronin ✓ Henrietta Mei Permanent Building Committee
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
J '..... Julie Hackett Superintendent J Todd Rhodes Sustainable Lexington Vice Chair
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
✓ ''. Cynthia Arens ''. Sustainable Lexington Committee Chair
✓ Elizabeth Yan LHS Student
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
✓
''.. Mark Connor ''.. Tree Committee Co-ChairLuke Yung LHS Student
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
J ✓ Lorraine Finnegan SMMA Project Manager
''.... Jeff Harris ''.. Computer Science Teacher
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
J ''.... Jon Himmel ''.. Permanent Building Committee Chair
✓ Matt Rice SMMA Project Architect
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Chris Bouchard ''.. Project Engineer
✓ Brian Black SMMA Design Architect
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
✓ Racheljayson Performing Arts Teacher J Alicia Kosasih SMMAInterior Designer
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
J Wendy Krum Permanent Building Committee J Michael Dowhan SMMA Architectural Designer
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
✓ Mike Burton Dore+Whittier
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
✓ Christina Dell Angelo Dore+Whittier
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
✓
Rachel Rincon Dore+Whittier
EliasGnJalva Dore+Whittier
Agenda Description
Item
1. Introduction: Refer to attendees list.
2. Please refer to attached presentation for meeting reference.
SMMA introduced team:
Lorraine Finnegan Project Manager
Matt Rice Project Architect
Michael Dowhan Project Landscape Architect
Erin Prestileo Project Civil Engineer
SMMA team states that the first meeting today is to go around the room to each focus group member,hear what they are
concerned about,what they want to talk about and goal at next meeting is to answer the questions and concerns.
Focus Group Timeline:
tfeini-noint: Massac.husetts �AIVnMr.daareandW/atl iit:..ai err„rrsmn
At the first meeting the agenda is to listen,at the second meeting to review and respond,at the third to confirm and
recommend,and the fourth to reconvene with all of the focus groups.
SMMA explains that the project is currently in the PDP phase with the MSBA. They explain that a PDP is the
Preliminary Design Program process. During this project the District and its team collaborate with the MSBA to:
Document their educational program
Generate an initial space summary
Document existing conditions
Establish design parameters
Develop and evaluate alternatives
Recommend the most cost effective and educationally appropriate preferred solution
SMMA reviews slide regarding design thinking. This includes:
To Emphasize, Define, Ideate, Prototype, and Test
SMMA reviews the design goals and aspirations of today's meeting:
What objectives do you want to address in this process?
How will we measure success?
C. Arens:
Chair of Sustainable Lexington Committee
Comments from kids yesterday regarding design
Want to accommodate and consider:
Lighting
Hallways
Certain spaces need for students
IDP
Waste reduction
Not just from cafeteria and food service
Dishwashing vs plastic or paper
Mealtimes are compacted
Staff and faculty lounge areas
Student spaces
LABBB needs
What else is out there that reduces waste from the building
Red list materials
Using green list materials
Make sure groups have spaces when they need them
D. Barneschi:
Digital design
Before look at a lot of print outs
Love same opportunity for kids and people to see onsite
Only so much can gather online
Want to tour buildings that people have done
M. Connor:
Reinforce idea when designing the building we look into the context and relationship to environment
Sensitive to sight and environment around it
Page 2 of 5
Can't just be the school, it has to fit in and feel like a part of the town
Have some character
Environmental features to site insert them
Walking paths leading from other common areas and incorporate flow
L.Jensen:
Has SMMA had good experience with utilizing same space for multiple purposes?
Think about using cafeteria and auditorium are the same space
Would like to visit other schools to see visually
Not just SMMA designed schools, but relevant and similar complexity
J. Harris:
Biggest concern is that student population is growing
Whatever we build is going to be a full school right away
Create a design that has the potential of growing
The way the school entrance presents is important, should be something people want to see
J. Himmel:
Hybrid building
Such an investment for town
Everything identifies for kids, and town
Before and after education hours
Hourly building use study and maximizing building use
Refer to Attachment A of the IDP (Integrated Design Policy)
Health, natural lighting, materials, etc.
Building that's flexible with new teaching times
Pandemic may happen again in future
Building needs to be responsive to remote learning in its design
Building possibly 400k sqft+
Challenging
One tends to lose identity in a building that big
Interesting going through corridor and branches and places to eat and always something to discover
Building of this size everyone in town should have access to it to walk around
Full student access during teaching hours, reduced accessibility in the evening
Separate access
Tied to the site
Costs: as you collect these ideas nice to be able to differentiate between must have and want to have
Orientation and design should be responsive to SLC (Sustainable Lexington Committee)
New building responsible to wells fore geo
Solution that does not distract during construction
Expandable design
Design done in a way can increase classrooms by 4
Expansion
R.Jayson:
Waltham is 400,000 but population of Lexington is greater
Would like to see models of similar size buildings
Urban schools
Want it to have a sense of place
Page 3 of 5
Should be intuitive to move through
Walked us through her layout design idea
Create wings that can be separated from main building to be open to community
Athletic wing needs a parking lot
Performing arts wing needs a parking lot
Flexible cafeteria space,food court style space that can be used for a performance
Slightly risen area as a stage and movable furniture
Food appropriate space where students can study
Things that everybody needs to go in the center for
Sports and performing arts are on opposite ends of the building with their own entrances
Use of color, place that people want to be
Should have a personality
W. Krum:
Curious as to how the design will balance the tradition of open campus along with necessary security and
How fields incorporated into the design
Been through center construction
And how construction will affect students and town access
Importance of site and natural qualities
Can be a natural space where students can gather
Interior design should incorporate natural light and colors to add life and vitality and wayfinding
T. Lee:
Act as a liaison and make recommendations to town to abutters and community at large
Looking at everything scale, etc.
Where coming from as a committee
Echo many things that people have said
Great process
Interesting looking at pros and cons to all ideas
Site utilized as a classroom and make interaction natural environment
Incorporated as much as possible
Building and site work harmoniously
Impact on larger environmental is important
Location of the site is important and center of lex
Spaces that connect well
T. Rhodes:
Challenge with dealing with committee/community challenges and constraints
Exterior has a big impact on energy component
How many floors will the building be
Orientation etc. all play into larger environmental impacts
As part of the process seeing what the ideas are and how able to address the usage points with operational
utilities, etc. solar, geo, and sustainability aspects
T. McBride:
Representing school resource officer
Taken in consideration embodied carbon
In demo as well
Site building for solar
Function flow and waste
Page 4 of 5
Safety and security and parking teachers parking and ability to access for teacher's vs students
Students make use of quad
Emphasize use of outdoor space for size and scale
B. Pressman:
50 year resident
Echo what W. Krum comments regarding the site
Has existing conditions identified sqft of site compared to amount of open space to the left of the field
house?
What is available space to build on?
Can new structures be spread out or do we have to go up?
Would be interested in learning about schools that go up in structure
SMMA reviews next steps from their presentation:
What to expect in meeting#2:
Objective:
The design team will speak on the topics below as well as the priorities brought up by the focus group today
Topics:
Lexington's IDP (Integrated Design Policy)
Potential material and system palettes
Educational visioning input
Building orientation
Technical requirements
Precedents-recent high school designs
Lexington design vernacular/content
When and where:
Friday, February 14`", 2024 1-3pm
Estabrook Hall, Cary Memorial Building
SMMA presents a draft LEED scorecard example that will be reviewed at the next meeting.
3. Close
The exterior and interior focus group meeting will be held on Friday,Febiva 14", 1-3 m.
Sincerely,
DURE °+. WI1IIIIII"'1"TIII11;i1R
Christina Dell Angelo
Project Manager
Cc:Attendees, File
The above is my summation of our meeting. If you have any additions and/or corrections, please contact me
for incorporation into these minutes.
Page 5 of 5