Loading...
HomeMy WebLinkAbout2025-01-22-REC-min (Lincoln Park Subcommittee) January 22 , 2025 Lincoln Park Committee Meeting Minutes January 22, 2025 Attending: Bob Pressman, Wei Wie Li, Paul Earsy, Brian Kelley, Joanne Shorter Meeting commenced at 5:15pm at Community Center Barnard and Parterre continue to do good work. Brian communicated to Barnard and Parterre the new procurement process, which would require them agreeing to terms and keeping annual billing under $10,000. This would likely require paring back the maintenance work based on the last two years of invoices. Draft contracts have been provided to Barnard and Parterre and they have indicated they are amenable to this arrangement. Replacement of Granite Forest trees has been less of a priority due to the focus being on the repair/replacement of boardwalk surfaces. Proposal from Foti indicated a drainage issue. Activitas Inc. provided an updated proposal for the Boardwalk repair/replacement of the surface, based on Brian's input they were able to reduce the fee from $50,000 to $20,000 by reducing the scope of the work. Discussion of Parker Meadow boardwalk and getting information for Peter Coleman that may be able to be applied to the Lincoln Park boardwalk replacement. Motion to approve moving forward with Activitas Inc. revised proposal dated 05 January 2025 titled: "Professional Design Services for the Upgrades to the Lincoln Park Boardwalks" to include Part 1: Basic Services and Part 2: Design Services not to exceed $20,000. Unanimous 4-0 vote in favor (Wei Wie Li is a non-voting member) Reviewed and discussed current Fitness station locations and scope would not include active area central stations and would focus on replacing existing stations closer to Worthen Road locations 6,7,8,9,10,11,12,13,14,15 maintaining a loop in the passive area, with removal of stations at locations: 1, 2, 3, 4, 5. DPW has removed one or more stations already and may be able to help remove the others. Discussion of the Community Center fitness station area and getting information for Peter Coleman that may be able to be applied to the Lincoln Park fitness station replacement. Motion to ask the Recreation Committee to move forward with the Lincoln Park Fitness Station Equipment replacement of stations: 6,7,8,9,10,11,12,13,14,15 and removal of stations: 1, 2, 3, 4, 5. Unanimous 4-0 vote in favor (Wei Wie Li is a non-voting member) Adjourn 6:15pm Paul Earsy, Lincoln Park Committee PROPOSAL Date: 4/9/2025 Mailing Address: Site Address: [Lincoln Park] Lincoln Park Lexington, MA 02421 2025 Eco Maintenance - Proposal#16181 Dear Brian, I am pleased to present this proposal for continued stewardship and restoration efforts at Lincoln Park in Lexington. I look forward to assisting you with invasive plant management as previously discussed. Parterre Ecological will ensure that your goals to remove and control invasive plants from the project area are realized in a professional, well developed manner. SCOPE OF WORK • Identification of existing invasive plant species • Manual (by hand-pulling or cutting) and/or chemical (cut-and-dab herbicide) treatment of identified invasive plant species • Monitoring and prioritizing high-traffic areas and new, easily-manageable outbreaks of invasive species • Herbicide application treatment to invasive plant species by MA licensed and insured pesticide applicators Not included in Scope of Work: • Any abutters' notices or communication with neighbors prior to work commencing • Additional restoration hours required to continue management of invasive plant sprouts after this initial Scope of Work is complete (Invasive species typically take 3-5 years to fully eradicate) TERMS Work will be performed on a set fee basis. Any additional work related to the project not mentioned in the above SCOPE OF WORK will be billed with your direction to proceed, based on our standard hourly rates described in the attached Addendum. This arrangement allows the ultimate efficiency on your behalf, as the billings directly reflect the work completed on the project. In order to initiate the project, please return a signed copy of this agreement and a 50% deposit which will be applied to your final bill. If you have any questions, please feel free to contact us. We are looking forward to working with you on this project. Sincerely, PARTERRE ECOLOGICAL Anthony Serra Field Manager, Eco aserra@parterregarden.com 2 Republic Rd. / N. Billerica, MA 01862 / P: (617)492-2230 /info@parterreecological.com 2025 Eco Maintenance $9,975.00 Field Technicians who maintain Massachusetts Pesticide Applicators licenses and are trained in the identification of invasive plant species will complete prescribed management strategies, including manual hand-pulling, cutting, and plant-specific herbicide application techniques. Invasive Plant Mgmt $9,975.00 Total $9,975.00 Tax $0.00 GRAND TOTAL $9,975.00 2 Republic Rd. / N. Billerica, MA 01862 / P: (617)492-2230 /info@parterreecological.com ECOLOGICAL ADDENDUM Expenses This project is set-fee and includes all labor and materials associated with completing the described Scope of Work. Hourly Rates The following hourly rates will be invoiced for the services provided as described in the foregoing proposal letter: Field Manager $130/hr Technician $120/hr Recovery, Director $7.50 per billable hour Recovery, Field Director $7.50 per billable hour Recovery, Plant Buyer $100 per Plant Order Recovery, Equipment $6.00 per billable hour Recovery,Materials $2.00 per billable hour The above rates are subject to change in accordance with an annual review. Guarantee Plant material may vary according to size or species based on nursery availability.We make every effort to source and provide plant material we propose, but on occasion we will need to make modifications to plant size or species based on availability from nursery sources. If a modification is required, we will make sure that it is within the allotted cost and meet the ecological conditions of the site. PGSI will not guarantee the services above against acts of nature or human vandalism. This includes destruction from wildlife including herbivory of deer, rabbits, beavers, or other animals. Additionally, PGSI will not guarantee any restoration planting against extended periods of drought, but can provide recommendations for installing a temporary irrigation system upon client request. PGSI does not guarantee the services above from intense storm events including flooding, winter storms or hurricanes which can damage plantings and bioengineering measures. In the event that human vandalism, wildlife, drought, or storm events destroy plantings, the one-year guarantee would become void. Parterre will not offer a one-for-one guarantee on any material smaller than one gallon. We will, however, guarantee coverage of the desired species and will make the necessary replants as needed by the end of the warranty period. Any plant material one gallon and larger we will guarantee on a one-for-one replacement, provided that Parterre maintains the property after installation for the length of the guarantee. The services to be provided pursuant to this Contract shall be performed with the professionalism of the green industry. Although PGSI makes no warranty, express or implied, it believes that PGSI's capabilities are exceptional. PGSI will therefore work with the Client to clarify any issues or to resolve or remedy any problems for which PGSI is responsible. In the unlikely event that PGSI is liable for any damages sustained by the Client, PGSI's total liability shall not exceed the fees paid by the Client for services, together with the cost of replacement or repair of materials supplied by PGSI. PGSI will not assume liability for any incidental, special, or consequential damages. Communication PGSI requests Client cooperation to forge a strong working relationship that will ensure PGSI provides the Client with an exceptional finished product. This will require open and timely communication throughout the restoration process. If the Client has any concerns regarding the scope of the work, the work performed, or the timeliness of the work, please bring it to PGSI's attention so they can address it immediately. If PGSI does not receive any complaints, PGSI will assume the Client is satisfied with the work as performed. Payments Invoices will be rendered monthly for work performed and expenses incurred in the prior month. All invoices will be emailed directly to the Client and are payable upon receipt. A finance charge may be added to balances outstanding more than thirty (30) days by applying a rate of 1% per month, which is equal to an 2 Republic Rd. / N. Billerica, MA 01862 / P: (617)492-2230 /info@parterreecological.com annual percentage rate of 12%. The Client agrees to read carefully all billing statements and promptly notify PGSI in writing of any claimed errors or discrepancies within fifteen (15) business days of the statement. Thereafter the Client and PGSI will review the disputed charges together. If PGSI does not hear from the Client in writing, it is presumed that the Client agrees with the accuracy and fairness of the billing. PGSI reserves the right to suspend services if the payment of any invoice is not received within forty-five (45) days of the invoice date. However,since PGSI sincerely does not wish to take any of these actions, the Client is requested to communicate with PGSI regarding any difficulties or issues that may result in the Client's failure to pay an invoice within the applicable period. If it is necessary for PGSI to take any action, including but not limited to arbitration and litigation to collect overdue fees, the Client is responsible for reimbursing PGSI for any costs or fees, including Attorneys' fees, incurred by PGSI due to collection efforts. Termination The Client has the right to terminate this Contract at any time by providing PGSI with seven (7) days' written notice. In the event of such early termination or if PGSI suspends work due to failure to remit payment, the Client will be responsible for the cost of all work performed and expenses incurred until the date of the decision to suspend, or PGSI's receipt of the Client's notice of termination. Arbitration Any claim arising out of this Contract, if not resolved informally, shall be resolved exclusively through private binding arbitration before a single arbitrator mutually selected by both parties. If the parties cannot agree upon an arbitrator within twenty-one (21) days after a party has made a demand for arbitration, the matter shall be submitted to the Boston office of The American Arbitration Association pursuant to The Association's commercial arbitration rules. Notwithstanding the foregoing, either party shall have the option of bringing an action or claim to small claims court and shall not be required to arbitrate matters that are within the jurisdiction of such court. Miscellaneous This Contract shall be interpreted according to Massachusetts's law and in Massachusetts's courts. Any modification of this Contract must be in writing and signed by both parties. If any provision(s) of the Contract is determined to be partly or entirely invalid, the remainder of the Contract shall remain fully valid. PARTERRE GARDENING SERVICES, INC. ACCEPTED AND APPROVED: Anthony Serra By: Brian Kelley Field Manager, Eco Date: Job: #16181 2 Republic Rd. / N. Billerica, MA 01862 / P: (617)492-2230 /info@parterreecological.com