Loading...
HomeMy WebLinkAbout2017-12-04-STE-Referendum-Results OFFICIAL RESULTS TOWN OF LEXINGTON SPECIAL ELECTION DEBT EXCLUSION VOTE DECEMBER 4, 2017 PCT 1 PCT 2 PCT 3 PCT 4 PCT 5 PCT 6 PCT 7 PCT 8 PCT 9 TOTAL TOTAL VOTERS 2106 2569 2102 2504 2576 2397 2432 2329 2509 21524 Total Votes 556 755 476 759 659 693 680 792 702 6072 Percent 26% 29% 23% 30% 26% 29% 28% 34% 28% 28% QUESTION 1 Shall the Town of Lexington be allowed to exempt from the provisions of proposition two and one-half,so called, the amounts required to pay for the bonds issued in order to pay costs of design and construction for a new Maria Hastings Elementary School,located at 7 Crosby Road in Lexington,including the payment of costs for a feasibility study,design development, demolition,architectural and engineering services,original equipment, furnishings, landscaping,paving and other site improvements incidental or directly related to such construction? PCT 1 PCT 2 PCT 3 PCT 4 PCT 5 PCT 6 PCT 7 PCT 8 PCT 9 BLANKS 4 1 0 0 0 3 1 0 1 10 YES 306 452 311 482 381 456 420 579 454 3841 NO 246 302 165 277 278 234 259 213 247 2221 QUESTION 2 Shall the Town of Lexington be allowed to exempt from the provisions of proposition two and one- half,so called, the amounts required to pay for the bonds issued in order to pay costs of design and construction for a new Lexington Children's Place(LCP),located at 20 Pelham Road in Lexington, including the payment of costs of demolition, architectural and engineering services,original equipment, furnishings, landscaping, paving and other site improvements incidental or directly related to such construction? PCT 1 PCT 2 PCT 3 PCT 4 PCT 5 PCT 6 PCT 7 PCT 8 PCT 9 BLANKS 2 2 0 2 4 2 1 4 4 21 YES 257 392 281 388 308 348 333 485 346 3138 NO 297 361 195 369 347 343 346 303 352 2913 QUESTION 3 Shall the Town of Lexington be allowed to exempt from the provisions of proposition two and one-half,so called. the amounts required to pay for the bonds issued in order to pay costs of design and construction for a new Headquarters Fire Station,located at 45 Bedford Street in Lexington,and the design,addition, remodeling,reconstruction and making extraordinary repairs of a temporary Fire Station located at 171-173 Bedford Street, including the payment of costs of demolition,architectural and engineering services,original equipment,furnishings, landscaping,paving and other site and traffic improvements incidental or directly related to such additions,remodeling,reconstruction,extraordinary repairs and construction?