Dear Lexington Residents:
Sun Tzu said, "Plan for what is difficult while it is easy, do what is great
while it is small." Over two and a half years ago, we brought together a "Plan for what is
group of talented and dedicated Lexington residents to address difficult while it is easy;
community challenges concerning the pressure on public school facilities do
related to rapidly increasing student enrollment. We thoughtfully planned a is feat
and prioritized, and occasionally discussed how a catastrophic event like while it is small."
a recession could have an adverse effect on our plans and projections. — Sun Tzu
In March, soon after our work was finalized, the unthinkable happened.
We found ourselves in the throes of the COVID-19 pandemic, which
forced us to pivot to close schools and pivot to remote teaching and learning. We were so thankful to
have the better part of the master planning process behind us, and we learned that there is great
wisdom in planning in good times, indeed!
On behalf of the School Committee and the Master Planning Advisory Committee, I am honored to
share with you the LPS Master Planning Compendium ("Compendium") that you are now reading,
developed by Advisory Committee members. The Compendium is not an executive summary; it is a
companion document to the more detailed and technical facilities master plan developed by DiNisco
Design. It is the first of its kind in Lexington, and the plan is designed to be fluid and responsive to
variations, such as how to respond to different types of fluctuations in enrollment. Special thanks
goes to Lexington School Committee members past and present for their foresight in creating the
Master Planning Advisory Committee and engaging the community in a planning process that
prioritizes school-based capital needs.
We remain grateful to the residents of Lexington who continue to so generously invest in the
Lexington Public Schools—and we recognize that our community's resources are not without limits.
We owe it to our taxpayers to help balance school priorities with municipal needs, which is a guiding
principle of the Master Planning Advisory Committee. As we articulate in this compendium, our
greatest challenge ahead is a new or renovated high school. We look forward to working with our
municipal partners and the school community to see that project to fruition. We hope our master
planning documents serve as invaluable decision-making tools that will be constantly revisited and
guide our planning and space utilization efforts in the future. My heartfelt thanks goes to all the
Advisory Committee members who so generously invested their time, energy, and expertise!
Sincerely,
Dr. Julie Hackett
Superintendent of Schools
2
SUPERINTENDENT'S FOREWORD 2
I: INTRODUCTION AND PLAN HIGHLIGHTS 5
Key Findings 5
Summary Of Key Recommendations 6
A Flexible, Responsive, Useful Master Plan 6
II: WHO ARE WE AND WHAT DO WE BELIEVE? 7
III: DEFINING THE PROBLEM 9
IV: LPS FACILITIES AND STUDENT ASSIGNMENT 11
Current School Facilities: 2020-2021 11
Table 1. Existing School Building Information 11
Specialized Programs 12
Recent Building Projects 13
Redistricting & Student Assignment 13
V: STUDENT ENROLLMENT & TRENDS 15
Enrollment: 2020-2021 Update 15
Table 2. Enrollment by Grade (as of October 1, 2020-2021) 15
Chart 1. Lexington Public Schools Grades PK - 12 Annual Enrollment 16
Chart 2. Lexington Public Schools Annual Enrollment By Grade Level 17
Table 3: LPS Transfer Reasons FY2020 vs. FY2021 18
Enrollment Projections: 2020-2021 Update 19
Table 4. Current Enrollment Projections with Confidence Intervals 19
VI: SUMMARY OF ADVISORY COMMITTEE RECOMMENDATIONS 21
VII: STRATEGIES PRIORITIZED BY GRADE SPAN, ENROLLMENT PRESSURE, AND
ASSOCIATED COSTS 22
Preschool and Elementary (Grades PK -5) 22
Middle School (Grades 6-8) 23
High School (Grades 9-12) 24
Advisory Committee Recommends A New or Renovated High School 26
Table 5: High School Enrollment - Higher than Projected 29
VIII: FOR FURTHER CONSIDERATION 32
Land Swaps or Purchase 32
High Performance Facilities 33
3
Solar and Renewable Energy
Economic Benefits
Health Benefits
IX: NEXT STEPS AND ONGOING REVIEW
34
34
34
35
Appendix A: ABOUT OUR PLANNING PROCESS 37
I: INTRODUCTION AND PLAN HIGHLIGHTS
The Master Planning Advisory Committee ("Advisory Committee") engaged in thoughtful
deliberation for a period of 18 months, creating a versatile and useful Master Plan that (1)
serves as a decision-making roadmap; and (2) contains a repository of master planning data,
including enrollment projections and space utilization analyses (See Appendix A to read more
about our planning process). The Lexington Public Schools 10 -Year Master Planning
Compendium ("Compendium") which you are now reading, is designed to assist
decision -makers in the prioritization of future capital planning projects, large and small.
Several years ago there was no master plan sufficiently up to date to be useful in guiding
decisions about capital projects. When faced with higher than anticipated enrollment pressures,
no space to safely place students, and no available plan, there was no option but to hastily
seek solutions to address the challenge at hand. The information presented in this
Compendium and in the technical review provided by DiNisco Design is designed to ensure that
all options are explored, accounting for multiple possible future scenarios. Furthermore, the
master planning documents ensure that no strategy requiring capital outlay will be implemented
for a particular grade span, without knowing how that particular project fits into the bigger
picture. Finally, the master planning process we have implemented ensures that community
members representing the local bodies that are likely to be involved, e.g., Select Board,
Planning Board, Capital Expenditures Committee, Appropriation Committee, Permanent
Building Committee, and Sustainable Lexington, have opportunities to weigh in on the decisions
related to school projects well in advance of implementation. The plan described will serve as
important decision-making roadmaps that the Town of Lexington can use to understand the
possible responses to enrollment pressures.
This Compendium represents the analyses and recommendations of the Advisory Committee
that are based in part on a thorough space utilization and program analysis for Lexington Public
Schools produced by DiNisco Design, the architectural firm hired to advise on and develop the
technical aspects of our Master Plan. The analyses of DiNisco Design, the architectural firm
that assisted us with many of the technical aspects of the planning process, can be found here.
School enrollment projections and other input were also essential to the work of the Advisory
Committee.
Key Findings
After careful analysis of the aforementioned information, the Lexington Public Schools Master
Planning Advisory Committee found:
1. Lexington High School is the most critical priority in terms of LPS building projects until
2030.
2. Review of enrollment data indicates that while we focus on the high school, we do not
anticipate a need for major expansions at the elementary and middle school level.
5
However, LPS should still have a clear set of strategies that can be used in all buildings
should trends shift and overcrowding occur. These are described in Section VII,
"Strategies Prioritized B 1 Grade Span4 Enrollment Pressures and Associated Costs.
3. In anticipation of new information and acknowledgment of evolving conditions, LPS
should strive for a flexible master planning process that includes ongoing review of key
reports and other information relevant to capital planning decisions with decision
makers.
Summary of Key Recommendations
Given these findings, the Lexington Public Schools Master Planning Advisory Committee makes
the following recommendations and comments.
(a) MPAC review indicates that no new space is presently needed at the preschool
or elementary level, nor is it likely to be needed for several years. However,
elementary school enrollments must be carefully monitored for opportunities to
replace aging facilities in the event of more dramatic enrollment declines or for
another episode of unexpected enrollment growth.
(b) MPAC review indicates that no new space is presently needed at the middle
school level, although enrollments may stay near or just over capacity for
several years. Similar to the case of elementary school enrollments, middle
school enrollments should be carefully monitored.
(c) In light of current and projected LHS enrollments being substantially higher than
a reasonable estimate of the school's capacity, the Master Planning Advisory
Committee strongly endorses the plan to increase the size of the high
school facility by replacing it with a new building or by completing a
comprehensive renovation with additions.
See Section VI, "Summary of MPAC Recommendations" and Section VII, "Strategies Prioritized -B Grade
Sean, Enrollment Pressures. And Associated Costs" for more detail on MPAC recommendations.
A Flexible, Responsive, Useful Master Plan
The ideas captured herein represent the Advisory Committee members' best thinking given
existing conditions and populations at the time of the development of the master planning
documents. Given the ever -shifting nature of student enrollment trends and community
conditions, the master planning process going forward includes ongoing monitoring and
anticipates some revision or adaptation. To ensure that the plan is not a static document that
9
sits on a shelf, a framework for continual monitoring and adjustment is described in the final
section of this document (Section IX, " ext Steps AndOn oin review").
II: WHO ARE WE AND WHAT DO WE BELIEVE?
Lexington Public Schools is a public school system
located in Lexington, Massachusetts, serving MASTER PLANNING ADVISORY
approximately 6,900 students as of October 1, 2020. COMMITTEE MEMBERS
LPS offers robust academics, a strong commitment to Daniel Abramson, Architectural Historian
the arts, and an ardent belief that our purpose and
Sandra Beebe, Capital Expenditures
reason for existing is to instill "Joy in learning, curiosity in Committee
life, and compassion in all we do."
Kathryn Colburn, School Committee
In many ways, our master planning process reflects the David Coelho, Assistant Superintendent for
LPS values we espouse. We integrate into the Finance and operations
educational process eight core values that can be found Sara Cuthbertson, School Committee
in the LPS Strategic Plan, including (1) we all belong; (2)
use your mind; (3) be curious and have fun; (4) care for Michael Cronin, Director of Public Facilities
yourself and others; (5) do your part; (6) be courageous; Donna DiNisco, DiNisco Design
(7) embrace your revolutionary spirit; and (8) you are
enough. Our vision for the future comprises five key Julie Hackett, Superintendent of Schools
tenets: (1) diversity, equity, inclusion; (2) redefining Charles Hornig, Planning Board
success; (3) students as active agents; (4) authentic Representative
learning experiences; and (5) community partnership. Maureen Kavanaugh, Director of Planning
and Assessments
It is our deep commitment to "community partnership" Kathleen Lenihan, School Committee
that is the vision most closely reflected in our
collaborative master planning process, which states in Avon Lewis, Lexington Education
Association
part: "We believe that "learning is a collective endeavor
that involves students, educators, families, and the Alan Levine, Appropriation Committee
community. We all join in partnership with the common Marina Levit, LPS Parent
goal of providing the highest quality education for our
Joe Pato, Select Board
students. In doing so, we recognize that each of us
represents different communities, roles, and Richard Perry, Lexington Housing
perspectives." Our work on the master plan reinforces Authority
our strong belief that the diverse perspectives of many Mark Sandeen, Select Board
make the best plans.
Dan Vass, Sustainable Lexington
Lexington continues to see changes in enrollment at all NEWLY APPOINTED ME E S
grade levels, requiring us to continuously adapt and Carissa Black, LPS Parent and Lexington
update our plans. These changes exacerbate SEPAC and LexSEPTA Co -Chair
overcrowding and create a need for additional space,
particularly at the secondary level. The School Michael Schanbacher, Architect and
Planning Board Representative
7
Committee determined that updating a master plan for school capital projects is necessary and
prudent for this reason. They established a Master Planning Advisory Committee ("Advisory
Committee") in accordance with School QommiUg2_E2fiLy BDF.
Lexington's master planning process began with a charge prepared by the Lexington School
Committee that was approved on May 8, 2018. The School Committee developed a
representative Advisory Committee structure, comprising staff and citizens with sufficient
background and knowledge to understand facility assessments and the impact of facilities on
the educational process. An effort to gather a broad-based group of constituents influenced the
design and composition of the Advisory Committee and included the following number of
representatives in each category: School Committee (2), Board of Selectmen (1), Permanent
Building Committee (1), Superintendent of Schools (1), Director of Public Facilities (1), Director
of Planning and Assessment (1), Capital Expenditures Committee Liaison (1), Appropriation
Committee Liaison (1), Planning Board (1), the chair of the PTA/0 Presidents' Council (1),
representative from SEPAC (1), high school student (1), and citizens selected through
application process (2). The Advisory Committee membership has evolved over time to better
meet the needs of the master planning process.
The work of the Advisory Committee centers around three primary charges, including:
1. Assess current capacity findings and identify options to align future school
capacities with enrollment projections and educational program requirements;
2. Develop recommendations for addressing capacity, including costs and timelines;
3. Prepare a Final Report and Recommendations to the School Committee.
Based on the above parameters, a 15 -person Advisory Committee was appointed and tasked
with developing and recommending a 5-10 year capital plan for school facilities. To do so, they
analyzed current facilities and enrollment forecasts, and developed conceptual plans and
timelines for much-needed additional educational spaces. DiNisco Design provided professional
support for this effort pursuant to an existing contract.
The LPS 10 -Year Master Plan and the LPS Master Planning Compendium you are now reading
reflect the Advisory Committee's efforts to address the three charges given to them by the
School Committee.
III: DEFINING THE PROBLEM
While the Lexington Public School system has experienced
enrollment growth at all levels, for a number of recent years the What is the greatest
most rapid growth was concentrated in the lower grade levels. In
response, the Town of Lexington recently completed critical and most critical
school building projects to address elementary space needs. This needfacing the
included a new Lexington Children's Place that opened its doors school system in the
in 2019, followed by a new, larger Hastings Elementary School in years?nextfive
2020.
Given this recent history, the Advisory Committee began this
effort with questions focused on elementary (K-5) enrollments
and the need for relief at this level. With the help of members of the Enrollment Advisory Group
(EAG), it quickly became apparent enrollment trends have since changed. While the recent
projects were effective at creating much needed elementary space, enrollment growth has
shifted to the secondary level, putting pressure on our existing middle and high school facilities.
In particular, severe overcrowding and enrollment pressures have plagued Lexington High
School for years, but the situation continues to worsen. Therefore, it was decided that planning
efforts and resources for capital improvements would need to be redirected to Lexington High
School.
Prior to the pandemic, we learned that elementary and middle
If current projections school enrollments appear to be stabilizing for the next five
hold, by the year 2025, years, while high school enrollments are expected to increase
LHS enrollment is significantly. Recent enrollment declines attributed to the
expected o reach its COVID-19 pandemic, largely impact elementary and middle
peak with over 2,500 school grades. LHS enrollment remains high and is consistent
students (or 650 students with projections for the 2020-21 school year, still exceeding the
over the planned capacity of the building.
operating capacity).
Lexington High School, originally built in 1953, has an open
campus plan with several individual buildings. Students must
exit one building to get to another class in another building. LHS
has undergone several major renovations since, including the construction of a new library
completed in 2001 to create the space needed to serve up to 1,850 students. In 2014, when it
was clear that enrollment growth was outpacing capacity, a modular building was added,
providing an additional 17,000 square feet for core academics. While this created academic
spaces intended for approximately 2,250 students, core spaces, including both cafeterias
remained unaltered and significantly undersized to accommodate the growing enrollments.
Further, this expansion did not address the quality of the academic spaces throughout the main
building. By today's standards, the average classroom size at LHS is significantly smaller than
9
the recommended square footage associated with 21st century learning environments and the
Massachusetts School Building Authority (MSBA) guidelines. In 2014, Lexington participated in
the Green Roof Repair Project, in which part of the aging and damaged roof over the cafeteria
was replaced. In 2015, another modular was installed at LHS, resulting in 8,000 additional
square feet mostly dedicated to students with disabilities. In that same timeframe, the LHS
buildings were retrofitted to increase the wireless capacity needed to ensure adequate
technology for teaching and learning. Throughout the years, there have been a few modest
addition/renovation projects to attempt to meet the needs of our growing population.
Based on current projections, by the year 2025, enrollment in grades 9-12 is expected to reach
its peak with over 2,500 students. An enrollment topping 2,500 means that LHS will be
approximately 650 students over the capacity of the core spaces and classrooms. In addition to
overcrowding, the current high school facility faces deteriorating conditions, and it is not well
configured for modern instructional approaches and educational needs. The current facility, with
its unique design, also presents certain security challenges. With rapidly rising secondary
enrollments and the growing need for a new or renovated high school, no planning document
has been more vital to the work we do on behalf of students in the Lexington Public Schools.
While the primary focus is on the secondary schools, we want to keep in mind that stable or
declining elementary enrollments may offer a rare opportunity to address aging facilities. Bridge
and Bowman Elementary Schools will eventually need to be replaced, and to do so during
stable enrollment periods could minimize school-based disruptions, mitigating the potential
negative impacts on teaching and learning. While it is easy to problem -solve on paper, finding
the resources to meet our needs is another matter. We acknowledge that the Town of Lexington
must carefully weigh the collective needs of both our school system and municipality, and we
must seek a balance in order to address the pressing needs of both entities. Municipal leaders
recently engaged in a capital planning process of their own, taking into account shifting
conditions and competing demands. The Advisory Committee recognizes an opportunity to
integrate the LPS 10 -Year Master Plan into the Town's anticipated capital plan.
10
IV: LPS FACILITIES AND STUDENT ASSIGNMENT
Current School Facilities: 2020-2021
LPS comprises six elementary schools (grades K - 5),
two middle schools (grades 6 - 8), and one high
school (grades 9 - 12). LPS also includes a
pre -kindergarten program, the Lexington Children's
Place, and serves nearly 220 Boston Metropolitan
Council for Educational Opportunity, Inc. (METCO)
students who attend schools throughout the district.
The map shown here marks the location of the
district's schools and central administrative offices.
Generally, students who attend Fiske, Estabrook, and
Hastings Elementary Schools move to the Diamond
Middle School, while students who attend Harrington,
Bridge, and Bowman Elementary Schools move to
Clarke Middle School. Thit
V majory of students then
move into Lexington High School, the only high school in the district. After middle school,
approximately 10-20 students move to Minuteman Regional High School, which is an
out -of -district option to take part in their career vocational technical programs.
IIIV IIII ,�1.Ill ;�iiii � t iiia iiir°°iiu ����� sdhodl j'iiii IIII ilii iiia° g IIII iiu � .iii iiu ilii iu �
Lex. . Children's Place
19,000
PK
2019
.......................................................
Bowman
67,900
K- 5
--,""I'll ......................................................
1964 1999, 2013, 2016
Bridge
65,400
K - 5
1965 2013, 2016
--,""I'll" ......... ......... .........
Estabrook
--,""I'll" .........
91,800
..........
K - 5
., ...I...., ...................,.....,,
2014
--,""I'll"
Fiske
,""I', .........
75,500
'll
K - 5
....... , I'll...........................................................
2006 2016
Harrington
89,000
K - 5
2004
--,""I'll" ........ ......... .........
Hastings
,""I', .........
110,000
K - 5
,, ......... ....,..., ......... ........, ......... ......... .............
2020
--,""I'll" ......... ......... .........
Clarke
--,""I'll" .............
145,000
............
6 - 8
. ,,,,,.... ........, ........, ........, ..............
1972 2000, 2017
--,""I'll" ......... ......... .........
Diamond
,""I', .........
155,300
"I'll".............
6 - 8
,. l"., ........,
1958 1989, 2000, 2017
--,""I'll" ......... ......... .........
Lex. High School
......... .........
259,600
........
9-12
........, ........, ........ ......... ......... ........ ......... ...............
1953 1957, 1965, 2000, 2009, 2014, 2015
..... .........
Central Office
...,
45,200
,,,,,....,,,,,,,,.
1956
11
Specialized Programs
At the elementary, middle, and high school levels, a number of district -wide programs exist to
service students with low -incidence disabilities by offering intensive support. Each school
houses at least one district -wide program. In alignment with the district's strate, is Ian, an
emphasis on increasing the inclusion of students in all programs is a continued focus. These
programs include the following:
• The Developmental Learning Program (DLP) at Harrington Elementary School and
Clarke Middle School provides services to students with significant developmental
delays or intellectual/neurological impairments.
• The Substantially Separate Intensive Learning Program (ILP) at Fiske Elementary
School, Diamond Middle School, and Lexington High School provides services for
students with Autism Spectrum Disorder (ASD) and other related disabilities with
intensive needs including deficits in language, social communication, play skills, abstract
thinking, and behavior. The Intensive Learning Programs provide highly individualized
services involving behavioral approaches, typically based on Applied Behavior Analysis
principles to learning.
• The Integrated Intensive Learning Program (ILP) at Hastings Elementary School,
Clarke Middle School and Lexington High School also services students with Autism
Spectrum Disorder (ASD) and other related disabilities. Through this integrated
approach students are included, often with support, for the majority of their school day
within the general education setting. The FY2022 budget includes the development of an
Integrated Intensive Learning Program at Diamond Middle School.
• The Language Learning Program (LLP) at Bowman Elementary School, Clarke
Middle School, Diamond Middle School, and Lexington High School services
students who have significant language -based learning disabilities. These students
typically have average cognitive abilities, but they are not acquiring reading, writing,
and/or language usage skills at the same pace or level as their peers.
• The Therapeutic Learning Programs at Bridge Elementary School, Estabrook
Elementary School, Clarke Middle School, Diamond Middle School and Lexington
High School service students with significant emotional impairments or other disabilities
that may manifest themselves through difficulties with self-regulation. These students
may or may not have associated learning difficulties.
The LABBB Collaborative serves approximately 120 students from 60 different communities,
and Lexington High School is the host site. Initially, the LABBB Collaborative was formed in
1972 in response to the need for more specialized programs for students with unique needs.
12
Founding member districts include Lexington, Arlington, Burlington, Belmont, and Bedford, with
programs located in public school buildings in each of these communities. LABBB serves
students with a variety of special needs, including students on the autism spectrum, and those
with multi -handicaps, pervasive developmental disorders, developmental delays, language
deficits, and/or social/emotional challenges.
Recent Building Projects
Elementary school enrollments in Lexington were on the rise from 2008 through 2015.
Overcrowding was particularly acute at Bowman, Bridge, and Fiske Elementary Schools and
Clarke Middle School. Three of these schools are situated in the south easterly portions of
Town. Elementary and middle school building projects during this period of time addressed
deteriorating facilities and environmental issues, while expanding district capacity to match the
growth that had already occurred. Even after a new larger 27 -section Estabrook Elementary
School was completed in 2014 following the detection of polychlorinated biphenyls (PCBs) in
the old school, K-8 student enrollments still outpaced classroom space. Shortly thereafter,
modular additions were approved for the Fiske, Bridge, and Bowman Elementary Schools, and
they were completed for use in the 2016-2017 school year.
In 2017, the Town of Lexington completed additional brick and mortar expansions on Diamond
and Clarke Middle Schools. In the fall of 2019, a new stand-alone facility, Lexington Children's
Place (LCP), was opened to house the district's pre -kindergarten students. The new LCP
provides sufficient space for the district's preschool program, and it frees up space at Harrington
Elementary School and central administrative offices. Finally, in February, 2020, the new
30 -section Hastings Elementary School opened, replacing a much smaller (21 section)
deteriorating elementary school building.
Redistricting & Student Assignment
In addition to building projects, the school administration employed other strategies to manage
rising elementary and middle school enrollments. The administration executed a small-scale
change to school assignment maps in 2016. The main goal of this effort was to provide some
relief to the most overcrowded schools—Bridge, Bowman, and Fiske Elementary Schools.
However, since not all school building projects were completed at this time—including the new
Hastings Elementary School, the new Lexington Children's Place and both middle school
expansions—there was insufficient space district -wide to make adjustments to middle school
assignment areas or fully relieve overcrowding. Knowing another larger scale redistricting effort
was on the horizon, the adjusted elementary school assignment areas were applied to newly
enrolled students only. No students already enrolled were asked to change schools at this time.
As of October 1, 2016, 103 students were assigned to new schools based on the new
elementary maps, with the majority of these students entering Kindergarten.
13
Shortly after the 2016 change in school assignment maps, the district briefly explored the use of
"buffer zones." A buffer zone is a specific geographic area or set of areas within a community
where residential addresses can be assigned to one of multiple possible schools to maximize
flexibility. Upon registration, a student living in a buffer zone would be assigned to one of the
possible schools based on enrollment and capacity conditions. Although this approach is
employed by some neighboring communities including Arlington, Brookline, and Newton, the
approach was ruled out in Lexington after community deliberation. Instead, a practice known as
"flexible assignment" was adopted beginning in the spring of 2016.
Flexible assignment allows the administration to consider current school capacities when
placing any newly registered students. Students may be assigned to an adjacent school outside
of their assignment area, if their assigned school is considered "near or at capacity". The
approach offers advantages and also presents challenges. It allows the administration to make
assignment adjustments when class sizes are over the established class size guidelines.
However, the flexible assignment approach is a time -intensive process to administer, and it can
create inefficiencies in transportation with overlapping service areas. Furthermore, it can be a
difficult experience for newly arriving families who are looking for more certainty in their child's
school placement. In addition to these limitations, there have been a number of students
considered for flexible assignment who were ultimately placed at their originally geo-coded
school due to factors such as the absence of a nearby bus route to an adjacent school, lack of
room in adjacent schools, or an older sibling already assigned to the geo-coded school.
Although flexible assignment can be a helpful tool, it is not a complete solution to school-based
capacity challenges.
Newly available space created by a series of middle school and elementary building projects,
including the new Hastings School completed in February 2020, enabled the administration to
implement a comprehensive redistricting plan. The goal of this redistricting plan, approved by
the School Committee in December, 2019 and fully implemented in 2020-2021, was to
effectively use newly available school capacity to fully relieve overcrowding in schools and
ensure equitable and appropriate learning environments for all students across the district.
14
V: STUDENT ENROLLMENT & TRENDS
Enrollment: 2020-2021 Update
Student enrollment is often a key driver of many decisions of a school system and community.
This includes decisions about budget, academic offerings and services, facilities, transportation,
staffing and other logistical considerations. The study of student enrollment is fundamental to
the master planning process, as it is a core element of the needs assessment. Table 2
summarizes the most recent annual enrollment numbers recorded as of October 1, 2020, for the
2020-2021 school year. Prior to the latest round of redistricting, Bridge, Bowman and Estabrook
were Lexington's largest elementary schools. Enrollment had been roughly equivalent across
the district's two middle schools. With the implementation of new assignment maps now well
underway since approval in December 2019 and the new and much larger Hastings elementary
school now open, Hastings is now LPS's largest elementary school. We also see higher
enrollment at Diamond middle school.
IIII � by
Illy s of Octdir 1, 2021
cohortsSpecial challenges related to space and staffing, when relatively large or very small student
^ through a schoolmay e year-to-year resource and staff
reallocations. Current cohort sizes of note are highlighted in blue and gold in Table 2. We
currently have relatively rid' cohortsof graduation (yearof
graduationof graduation+' • of 0
graduationand very likely linked to the ongoing Coronavirus pandemic, the incoming kindergarten cohort
(year of i, in 2020-21compared
4 students during the previous years).
15
•14 11 12
lotal
Lex Children's Place 57
....................
�....... .......... ..............................................
57
.
Bowman
54
71
75
87
89
94
470
Bridge
39
57
65
69
74
96
400
Estabrook
66
79
90
97
87
103
522
Fiske
,""I'
41
58
_,,,,,,
62
75
62
89
,,,,,,,,,, ,,,,„,,.,
,,,,......, ........,. ,,,
387
Harrington
44
67
77
85
97
76
446
Hastings
65
76
111
94
123
96 1
1
565
Clarke Middle
278 302
301
1
881 f
I
Diamond Middle
289 299
324
912
I
I
Lexington High550
, ,,,,,,,,,,,,,
,,,,,,,,,,,
,,,,,,,,,,,,,,,s
......,,,,,,,,,s,,,,,,,,,,,,,,,,,,s,,,,,,,,,,,,,,,,,,,,,,,
f 599 582 530
2261
Total (PK 12) 57
13
408
480
507
532
554 567 601
625 550 599 582 530
6901
cohortsSpecial challenges related to space and staffing, when relatively large or very small student
^ through a schoolmay e year-to-year resource and staff
reallocations. Current cohort sizes of note are highlighted in blue and gold in Table 2. We
currently have relatively rid' cohortsof graduation (yearof
graduationof graduation+' • of 0
graduationand very likely linked to the ongoing Coronavirus pandemic, the incoming kindergarten cohort
(year of i, in 2020-21compared
4 students during the previous years).
15
Lexington's overall enrollment peaked in 1969. During this year, the district served just ov-T-
9,600 students and had 11 elementary schools, three middle schools and one high scho
Enrollment dropped precipitously over the next two decades. I
Chart 1 shows more recent historical total enrollments from the last 30 years. Chart 2 sho
enrollment changes by grade level for the same time period. A more recent enrollment pe1
-
occurred in 2019 when K to 12 enrollment was 7,190 (or 7,259 PK to 008 12). Leading up to th
peak, K - 5 elementary school enrollments had been on the rise from 2•to 2015. During th
time period, the district gained an additional 375 students in grades K - 5. There were al
increases experienced at the secondary level, but enrollment growth was not as acu
9000
7000
6000
SOGO
40GO
3000
20GO
7.000
I PrelK iiiiiiiiiii IK -5 6-8 11111119-12
- -- - - ---------- -- -- . . ......................
�6, �6, 61 "b
Oiart 1. 1 ex[ngtan IDWWIic Sd[iodls Grade 12 Aniiniudl
In 2019-20, just before the pandemic, elementary enrollment had somewhat stabilized, with a13
year average annual growth rate close to 0%. Growth had shifted to the secondary level
larger student cohorts previously making their way through the elementary level entered t
secondary grades. The 5 year average annual growth rate prior to the pandernic was 2.5%
the middle school level and 1.7% at the high school level. I
M.
I ,,II PreIK — K-5 ..........:6-8 —9-12
3 �0
3000
2500
2790
2261
2000 " 11
...... 1793
1500
1.000
RE
M
0
?lx V ,�V o"
0�,iiart 2. 1 eArigtan ��)UWIic Sdhodls Arvnua�l I'lly Grade I evdl
Ifith the Coronavirus pandemic, like many school systems across the Commonwealth, LP
experienced a drop in enrollment for the fall 2020-21 school year. As of October 1, 2020, K-1
enrollment was 6,844 (or 6,901 PK— 12). This was a decrease of 278 students, or -3.9% K-1
from the previous year, the largest decrease since the 1982-83 school year when enrollme
contracted by 275 students or -5. 11 M. I
The majority of this decline comes from the elementary level (229 out of the total 278 decream
from the prior year). A portion of this decrease appears to be the consequence of lower th
typical kindergarten enrollments. As of October 1, 2020, Lexington enrolled 309 kindergart
students (compared to 382 to 414 students during the previous years). Although K enrollme
had been declining prior to this year, this year's decline of 73 K students was much sharper.
Review of student transfer reasons (Table 3) show increases in the number of studen'
transferring to other public schools in Massachusetts, transferring to private schools
Massachusetts, transferring to schools out of state or switching to homeschooling. The large
increase was in the number transferring to in-state private schools (an increase of 112 studen-I
from the prior year).
17
II IIIV IIII 3: �I�)S ""'1111°"'iiriiia i sfeir IIeasans II"" Y22s. Illi' 202
Gracie in
October
October
October
October
October
October
October
October
FY21
2019-20
2020-21
2019-20
2020-21
2019-20
2020-21
2019-20
2020-21
IAC
3
5
0
7
3
5
0
1
2
11
2
11
5
5
0
5
2
4
3
1
10
11
12
0
2
3
3
9
2
17
4
8
0
1
4
2
10
2
12
4
12
1
4
5
5
6
1
10
11
20
0
0
6
6
3
6
20
10
13
0
7
6
10
2
13
5
18
0
2
8
3
22
3
21
6
13
0
0
9
8
5
14
14
19
16
0
0
10
1
5
8
10
13
7
0
1
11
2
3
3
8
7
6
0
0
12
5
1
1
4
6
1
0
Total
50
93
45
157
104
136
1
15
This is consistent with information gleaned from our School Attending Children data, which
shows for the last ten years, just under 90% of Lexington children attend one of the local public
schools, accounting for the majority of school aged children who reside in Lexington. During the
most recent year (2020-21), this proportion decreased slightly to 86.8%. Consistent with other
datasets available to LPS, it appears a greater number of Lexington families opted for
homeschool (0.3% in 2019-20 to 0.7% in 2020-21) or enrolled in an in-state private or parochial
school (8.7% in 2019-20 to 10% in 2020-21). You can view public statewide Students Attending
Schools reports IIfIIt,K�iY e.
Even with recent enrollment declines related to the COVID-19 pandemic, which largely
impacted elementary and middle school grades, LHS enrollment was in line with projections for
the 2020-21 school year and remains high, still far exceeding the capacity of the building. LHS
enrollment was projected to be 2,295 for the 2020-21 school year. Actual enrollment of 2,261
was within the lower bound of the confidence interval (±40).
For further detail, district enrollments by grade level can be accessed here. District annual
growth by grade level can be accessed her .. Enrollment by grade and annual growth by school
can be accessed here,
..............................
iu:
Enrollment Projections: 2020-2021 Update
Each year the district reviews new student enrollment based on October 1 and produces
updated enrollment projections. These projections are offered as a planning tool, but not a
definitive prediction of future enrollment. Projections are built on the assumption that historical
data and enrollment patterns can offer clues about the future. However if new variables not
present or accounted for in historical data are introduced (i.e. a global pandemic) that have an
impact on enrollment, enrollment projections based on this data are unlikely to hold.
In addition to the context offered earlier, at the time of this report, distribution of a newly
available Coronavirus vaccine had just begun. While this is very much welcomed news and may
allow for a return to more typical school operations, we continue to plan and budget in a highly
uncertain environment. The current pandemic has affected the economy and is likely to have
continuing economic impacts. We do know regional and other high level economic conditions
generally do have an impact on our enrollment and we therefore must be mindful of this going
forward.
For the purpose of future planning, LPS will carry forward the enrollment projections and
confidence intervals' produced in FY2019 (see Table 4). The decision to carry over the prior
year projection assumes 2020-21 enrollment is an outlier and will therefore be excluded from
future enrollment projections. It also assumes successful, wide distribution of an effective
COVID-19 vaccine in addition to continued use of risk mitigation strategies for the remainder of
the 2020-21 school year. If COVID-19 can be dramatically reduced allowing a return to normal
operations, this projection also reflects an assumption that the majority of families who delayed
kindergarten enrollment or transferred into local private schools will return to LPS. For scenarios
where smaller numbers return, the lower end of the confidence interval should be considered.
I°°'a III MIIe eiuriur°ein'tIllllllllllui uu°oIIIIIIIIui eui t Illi'° uirclbc'tloiiii°i liiitlllhi Ceuin°tliii eince IIIIuin'teuir° alllla
K -5 2790 2997
2987
2982
3009
3065
3075
3085
3086
3096
±70
±70
±70
±70
±75
±75
±75
±80
±80
6-8 1793 1876
1870
1873
1837
1777
1767
1793
1793
1849
±55
±60
±65
±70
±75
±80
±90
±95
±100
9-12 2261 2396
2444
2455
2509
2508
2499
2471
2471
2407
±50
±50
±60
±60
±70
±70
±80
±80
±90
A specific point estimate of future enrollment is of limited usefulness because it does not acknowledge the associated uncertainty.
In recognition of this, upper and lower 90% confidence intervals are produced for all enrollment projections. Correct interpretation of
such intervals is that, if the underlying conceptual model is correct, there is a 90% chance that the confidence interval contains the
true value of future enrollment. However such conceptual models are often not completely correct in which case the confidence
intervals correspond to lower probabilities; these effects are difficult to quantify. It is recommended that plans based on projections
consider the confidence intervals and incorporate appropriate flexibility.
19
Updated enrollment projections and the confidence interval S2 that informed the master planning
process are summarized in Table 4. The most recent set of enrollment projections suggest that
elementary enrollments will remain stable. Middle school enrollment is expected to be stable for
the relative short term (i.e., the next 4 years), and then decline somewhat in the second half of
the forecast window. High school enrollments are projected to peak in 2024-2025 at around
2,500 students. Even after this peak, the existing high school facility will continue to remain
over capacity.
About LPS Projections:
For the set of projections published here, a version of the Cohort Survival Method was
used, which is one of multiple models the district runs each year. In this version, future
kindergarten enrollments are based on a linear model that incorporates 30 years of
historical kindergarten enrollments. Average grade -to -grade progression rates are then
applied to the rest of the grades.
Projections include 90% confidence intervals, reflecting the inherent uncertainty
associated with projections. Correct interpretation of intervals is that there is a 90%
chance that the confidence interval contains the true value of future enrollment. It is
recommended that plans based on projections consider this confidence interval and
incorporate appropriate flexibility. LPS will continue to monitor enrollment very closely
and strongly encourage those engaged in planning to consider multiple future
scenarios..
Enrollment projections provide a description of what enrollment may look like, assuming
previous enrollment patterns will repeat and the underlying conditions and drivers of enrollment
trends will persist. It is important to keep in mind that projections are not destiny, and they are
always subject to change. Applicable to recent events, this analysis of enrollment was
completed in the fall of 2019, prior to the current global pandemic and the likely economic
downturn to follow. When considering these data, we should take a cautionary approach, as
there has been a significant change in overall conditions since this analysis was first completed,
which will likely impact future enrollments. Moreover, longer range forecasts are less reliable.
Enrollment projections can help inform future short- and long-term planning, but they should
always be interpreted and used along with other information. It is for these reasons that
flexibility and acknowledgment of future uncertainty are particularly important features of the
Lexington Public School's Master Plan.
Z A specific point estimate of future enrollment is of limited usefulness because it does not acknowledge the associated uncertainty.
In recognition of this, upper and lower 90% confidence intervals are produced for all enrollment projections. Correct interpretation of
such intervals is that, if the underlying conceptual model is correct, there is a 90% chance that the confidence interval contains the
true value of future enrollment. However such conceptual models are often not completely correct in which case the confidence
intervals correspond to lower probabilities; these effects are difficult to quantify. It is recommended that plans based on projections
consider the confidence intervals and incorporate appropriate flexibility.
20
VI: SUMMARY OF ADVISORY COMMITTEE RECOMMENDATIONS
After careful analysis of the aforementioned information, the Lexington Public Schools Master
Planning Advisory Committee makes the following recommendations and comments.
(a) MPAC review indicates that no new space is presently needed at the preschool
or elementary level, nor is it likely to be needed for several years. However,
elementary school enrollments must be carefully monitored for opportunities to
replace aging facilities in the event of more dramatic enrollment declines or for
another episode of unexpected enrollment growth.
(b) MPAC review indicates that no new space is presently needed at the middle
school level, although enrollments may stay near or just over capacity for
several years. Similar to the case of elementary school enrollments, middle
school enrollments should be carefully monitored.
(c) In light of current and projected LHS enrollments being substantially higher than
a reasonable estimate of the school's capacity, the Master Planning Advisory
Committee strongly endorses the plan to increase the size of the high
school facility by replacing it with a new building or by completing a
comprehensive renovation with additions.
The Master Planning Advisory Committee endorses redistricting to balance school -by -school
enrollments, if needed. The Advisory Committee also recommends that the Town actively looks
for opportunities to acquire new properties that could serve, if the need arises in the future, as
the site for a seventh elementary school or third middle school, as the location of the School
Central Office in case the Old Harrington site needs to be used for school expansion or swing
space for a new or renovated high school project. In addition, the Advisory Committee has
recommended that a publicly -available document be prepared by the Department of Public
Facilities along with LPS with an inventory of all school building systems, including life -safety,
heating, mechanical, and others, as well as measures of sustainability. This will be regularly
reviewed along enrollment numbers and projections, the condition of school building systems,
recommended master plan strategies, the current Town of Lexington Integrated 13uildin� Desi�n
& Construction Policy and Checklist and other information pertinent to the utilization of school
facilities and should inform any adjustments to the above recommendations.
21
VII: STRATEGIES PRIORITIZED BY GRADE SPAN,
ENROLLMENT PRESSURE, AND ASSOCIATED COSTS
Preschool and Elementary (Grades PK -5)
PK -5 Current Conditions
As noted above, the current data suggest that enrollments at the elementary level were
relatively stable prior to the pandemic, declining only in the last year. No new space is needed
currently at the elementary level due to the substantial additional K-5 space made available by
Lexington Children's Place moving out of Harrington Elementary School, and the opening of the
new Hastings Elementary School with significantly more classroom sections available than in
previous years. Elementary school enrollments need to be carefully monitored for unanticipated
episodes of enrollment growth.
Elementary Enrollment: Lower than Projected
If future elementary enrollment is lower than projected, it would allow all class sizes to fit within
School Committee policy guidelines. A significant decrease in the enrollment opens up the
possibility that either the Bridge or Bowman Elementary School, two of our oldest school
buildings, could be closed temporarily for renovation, saving the Town the costs of performing
required repairs and improvements while the school remains in service. Alternatively, if the
enrollment decreases to the point that one of the six elementary schools is no longer needed, it
could be used as swing space if another school is being considered for replacement or
renovation. In order for school consolidation to occur, there must be sufficient capacity at the
other five elementary schools to accommodate the residual enrollment at a particular school
including the district -wide special education program that is housed at that school. While there
are many ways that school consolidation could be managed, it remains unlikely that the district
would have such a reduction in enrollment in the foreseeable future based upon the current
enrollment forecasts and trends.
Elementary Enrollment: As Anticipated
If the enrollment follows the anticipated profile, there will be sufficient capacity within the existing
facilities to accommodate the enrollment. Strategies such as flexible assignment or redistricting
should be considered as necessary in order to balance enrollment with the capacity of each
school. The capacity at the existing schools tends to match the anticipated enrollment with little
to no underutilized space at any of the facilities given current class size guidelines.
Elementary Enrollment: Higher than Projected
If future enrollment is higher than expected, strategies other than redistricting or flexible
assignment must be considered. Redistricting and flexible assignment are stopgap measures
intended to temporarily balance overcrowding in schools while alternative strategies are under
consideration. The most obvious non -brick -and -mortar strategy is to increase class sizes,
22
although smaller class sizes are a hallmark of Lexington Public Schools. The Advisory
Committee took into consideration the possibility of transferring one or more of the district -wide
special education programs from within the school system to an out -of -district venue, but this
strategy was quickly eliminated. Special education students require stability and all our children,
both with and without disabilities, deserve to learn together with their peers in their community.
The Advisory Committee considered the possibility of changing the grade levels serviced by the
elementary schools (e.g., moving fifth grade to the middle schools), but this is an unrealistic
strategy at present given that we lack sufficient space elsewhere in the system to offload an
entire grade level. Finally, if additional space is required to accommodate elementary students,
the district will continue to engage in space -mining exercises and explore the purchase of
portable or modular construction and/or the addition of permanent classroom space before
pursuing the construction of a seventh elementary school.
Middle School (Grades 6-8)
Middle School Current Conditions
Renovations and additions of both the Diamond and Clarke Middle Schools to increase capacity
were just completed in 2017. Those projects were planned several years before that when the
middle school enrollments were lower than now but increasing. Prior to the pandemic, both
schools were close to capacity. With the implementation of new assignment maps, we are now
seeing the desired higher enrollment at the Diamond middle school, the larger of the two middle
schools. This provides much needed relief from overcrowding to our Clarke Middle School.
Recent enrollment declines at the middle school level have also offered some relief. If
enrollment rebounds post -pandemic and current projections hold, the middle school enrollments
will stay near or just over capacity for several years. Similar to the case of elementary school
enrollments, the middle school enrollment figures need to be carefully watched.
Middle School Enrollment: Lower than Projected
If future enrollment is lower than projected, this would allow our middle school team sizes to be
at or below their desired levels. The current team sizes for Grades 6-8 typically include 80-92
students per team, with an average team size of 86 students. The students are spread out over
four core subjects, resulting in 21.5 students per class. One strategy to consider should there
be a significant decrease in enrollment at the middle school level would be to move the fifth
grade up to from the middle schools or to move the ninth grade down from the high school to
alleviate overcrowding at those levels. To successfully implement this strategy, there would need
to be a reduction of students equivalent to an entire grade. Projected forecasts suggest one
grade level is the equivalent of approximately 600 students.
Middle School Enrollment: As Anticipated
If the enrollment follows the anticipated profile, there will be sufficient capacity within the existing
facilities to accommodate the students. If the enrollment forecasts hold true, we do not
anticipate a need for new middle school construction. If necessary, we will continue to utilize
23
flexible assignment and redistricting to periodically balance the enrollments at the two middle
schools.
Middle School Enrollment: Higher than Projected
If future enrollment is higher than expected, the number of students per team will need to be
increased, at least until additional space can be provided. Flexible assignment and redistricting
should also be utilized to balance the enrollments at Diamond and Clarke. If the enrollment
increases beyond some to -be -determined point, additional space will be required, likely in the
form of an addition to one or both middle schools. Depending on the anticipated duration of the
increase, portable, modular, or permanent construction would be in order. At present, it seems
unlikely that the enrollment will increase to the point that a third middle school should be
seriously considered.
High School (Grades 9-12)
As we consider master planning strategies at the secondary level, Lexington High School
presents a different set of challenges. The purpose of this section is to describe the rationale for
a core high school capital project; to elaborate on the critical analyses that led to the Advisory
Committee's recommendation; and to examine strategies that may be necessary to consider in
the next few years.
High School Current Conditions
Exceeding Planned Operating Capacity
A significant and steady uptick in enrollment has led to an increase of over 1,000 students in the
district in the past ten years. The school district has consistently experienced overcrowding in all
of the elementary, middle and high school grades, but nowhere is the overcrowding felt more
intensely than at Lexington High School (LHS). Analysis of enrollment data indicates that by the
year 2024-2025, the LHS projected enrollment could reach roughly 2500+ students and could
continue at or near that level for the foreseeable future. Even if enrollment does not reach
2,500+ students, any measurable increase puts additional pressure on the planned operating
capacity for large core spaces, such as the cafeteria and lunchroom spaces, as well as the
instructional spaces. The core spaces were designed for 1,850 students, and the current high
school enrollment would need to decline by approximately 450 students for the core spaces to
be within the planned operating capacity. Even in these unpredictable times, such a scenario
seems unlikely.
Significant Overcrowding
The significant overcrowding at Lexington High School creates a serious challenge for our
community. Nearly 100% of existing classrooms are undersized; 100% of science rooms do not
meet the MSBA standard of 850 square feet, and approximately 30% of general education
24
classrooms do not meet the recommended square footage guidelines. Common areas such as
cafeterias and hallways are inadequate for their intended functions. Teaching and learning are
impacted on a daily basis, and overcrowding creates safety hazards, such as congested
hallways. Educators are forced to search for space to teach and collaborate, and LHS is in a
constant state of retrofitting classrooms to ensure all students have access to fundamental
learning experiences.
LHS lacks adequate space for invaluable learning experiences in areas such as the science
labs and the performing arts. Many students must eat lunches in hallways, as there is not
enough seating in the dining areas to accommodate all students. Hallway spaces are already
congested with mobility equipment due to inadequate storage and students trying to complete
schoolwork, creating additional health and safety concerns. Many campus doors have been
locked in an effort to tighten security; however, this means there are fewer viable routes to move
from one building to another, which further exacerbates overcrowding in the hallway.
Overcrowding also impacts our ability to implement an innovative schedule that would enable
LHS to meet the 990 -hour time -on -learning requirement. An innovative schedule would require
approximately 10% more space at LHS than does the current antiquated 8 -period schedule that
negatively impacts time -on -learning. Moreover, the impact of overcrowding has resulted in
inadequate space for students with disabilities in the LABBB Collaborative Program and the
Intensive Learning Program (ILP), as well as a shortage of space for English Language
Learners (ELLs). Due to space limitations, the administration is unable to create inclusive,
in -district programs for students with disabilities who should be educated with their peers
whenever possible.
In the 2008 and 2020 New England Association of Schools and Colleges (NEASC) Accreditation
Reports, LHS earned a rating of "Does Not Meet the Standard" due to the poor condition of
the facility. The accreditation team reported in 2020: "Enrollment has outpaced the addition of
buildings, creating significant space issues in classrooms, the cafeteria, and other facilities."
Unmet Programmatic Needs
Overcrowding and the poor condition of the LHS facility necessitates repeated short-term capital
planning exercises that are burdensome, costly, and not conducive to excellence in teaching
and learning. While we have undertaken many complex planning exercises in order to deliver
the curriculum, the efforts recently undertaken to ensure that all students can participate in
Science are illustrative of the challenges we face. Prior to the pandemic, two options were
considered (1) implement alternative scheduling and course sequence changes to
accommodate increasing enrollment; or (2) build two additional Science Labs at a cost of $1.1
million. A request for funding was submitted and approved at the 2019 Fall Special Town
Meeting.
In light of the future new or renovated high school, the request was rescinded and a decision
was made to implement a short-term plan for a fraction of the costs. The complex,
less -than -ideal short-term plan temporarily ensures that LHS students have access to Science
25
Labs. The plan did not cost the $1.1 million originally anticipated; however, there were
approximately $150,000 in associated costs related to the relocation, equipment, chemical fume
hood and ventilation, eyewash, minor plumbing upgrades, and furniture. These temporary
measures add up and do not adequately address the students.
A series of complex steps had to be implemented to avoid the $1.1 million Science Lab
construction project. The LHS short-term space reconfiguration plan commenced in 2019-2020.
In order to ensure that students had access to Science Labs, we added one Biology Room,
which necessitated a series of moves.
1. Earth Science (Room 313) becomes the 6th Biology classroom;
2. Physics (Room 303) becomes Earth Science (from 313);
3. Room 418 becomes Physics Room (from 303);
4. Materials from Room 418 are moved to first floor storage; and
5. Room 418 offices are shifted to Rooms 413, 401, 300, and 301.
In 2020-2021, one Chemistry Room was added, necessitating the following additional changes:
6. Retrofit Room 420 (Biology) to be a Chemistry room;
7. Relocate Biology from Room 420 to Room 315 Earth Science;
8. Relocate Earth Science (Room 315) to 301 (Staff/Academic Support);
9. Relocate Resource Room (309);
10. Relocate Staff Room, Academic Support, and offices to Room 309.
LHS regularly engages in these kinds of space reconfiguration exercises. If the high school
enrollment continues to increase per current projections, accommodations will be necessary for
a population of 2,500+ students. As a school community, we are sure to be faced with many
more difficult choices in the foreseeable future.
Advisory Committee Recommends A New or Renovated High School
The Advisory Committee undertook a series of planning exercises throughout to surface and
synthesize recommendations for consideration by the full Advisory Committee. As outlined in
the "About Our Planning Process" section of this report, the High School Working Group
(HSWG) reviewed student enrollment data for grades 9 through 12, developing recommended
strategies based upon enrollments that were "higher than anticipated" (2,450 - 2,650); "as
anticipated" (2,250 — 2,450), and "lower than anticipated" (under 2,250). A summary of the High
School Working Group's initial recommendations can be found here: HSWG
Recommendations. Given the extensive needs of the Lexington High School facility, the HSWG
strongly endorses two permanent construction priorities whether overcrowding exists or not.
The following recommendations were adopted by the full Master Planning Advisory Committee:
1. To fully replace the existing Lexington High School facilities; or
2. To expand and renovate the existing high school buildings.
K-^
A project to either replace or renovate will be one of the most expensive projects ever
undertaken by the Town of Lexington. The Master Planning Advisory Committee strongly
endorses the plan to increase the size of the facility by replacing it with a new build or a
comprehensive renovation with additions. The Advisory Committee recognizes that it would be
highly advantageous to team with the Massachusetts School Building Authority (MSBA) to
receive both planning and financial assistance from them. The Advisory Committee has
endorsed the third submission of a Statement of Interest to the MSBA, due June 25, 2021. They
further recommend low-cost non -permanent structures (e.g., portables and tents) as stop -gap
measures to temporarily meet the critical needs for additional space at Lexington High School.
A capital project of this magnitude requires a substantial financial commitment, reinforcing the
Advisory Committee's recommendation that we continue to explore the possibility of a
partnership with the Massachusetts School Building Authority (MSBA). The actual price of the
project remains to be seen, but several smaller high school construction projects that are
currently under completion are in the $400 million range. Lexington's effective reimbursement
rate (i.e., the actual grant -funded percentage from the MSBA after ineligible costs) is estimated
at approximately 25%. Given the anticipated costs, the effective reimbursement rate from the
MSBA would be a significant contribution to the overall costs of a new or renovated high school.
If the MSBA invites us into the capital pipeline and voters support a new or renovated high
school, the State would fund approximately a quarter of the school construction/renovation
project, and the remaining three-quarters of the funding would be assumed by Lexington
taxpayers.
The MSBA has a dedicated funding stream that is derived from one penny of the State's 6.25%
sales tax. If the MSBA invites Lexington into its "capital pipeline," a feasibility study determines
whether to proceed with a project to replace or renovate and expand the high school. Since the
MSBA's support is not guaranteed, Advisory Committee discussions often centered around the
need for a Plan A for Lexington High School, as well as a Plan B. If a project is not funded by
the MSBA, the next step would be to analyze the costs to Lexington of an MSBA-supported
project at some estimated date in the future (Plan A) versus that of proceeding immediately
without support from the MSBA (Plan B). The degree of MSBA support, the effects of
construction cost escalation, the inherent value received from MSBA expertise, and the
constraints that apply to an MSBA supported project would all need to be taken into account.
Plan B is included in Table 5 via the priority "explore the feasibility of a Town -financed new
school construction or renovation project."
As we await the possibility of a partnership with the MSBA, the overcrowding issues and unmet
programmatic needs will continue to be a concern. The High School Working Group (HSWG)
strongly recommends that we explore portables or even less -permanent structures, such as
tents for outdoor eating. These stop -gap measures will enable us to meet additional space
needs and spend fewer precious resources, as we await approval for a new or renovated high
school. The Advisory Committee also recommends that we avoid the purchase of modulars or
more costly semi-permanent structures. Other space -mining recommendations were
considered but ruled out. For example, members of the Advisory Committee and the High
27
School Working Group do not support withdrawing from the district's 50 -year partnership with
the LABBB (Lexington, Arlington, Bedford, Belmont, and Burlington) Collaborative, nor do they
recommend increasing special education outplacements if it can be avoided. The Advisory
Committee wholeheartedly supports the district's commitment to the inclusion of students and
supports avoiding out -placements when possible. Members also strongly support the district's
commitment to students in the LABBB program. However, given the intense enrollment
pressures at LHS, the HSWG is open to exploring alternative locations for ILP3, a more
intensive sub -separate program currently experiencing some declining enrollments. Finally, the
HSWG recommends exploring multi -site solutions, i.e., buying property and placing specialized
programs near the LHS campus, as a method for reducing the amount of space needed on the
main campus.
Table 5 summarizes strategies at the high school level by type and description, and prioritizes
them by taking into consideration factors such as enrollment pressure and costs. Strategies
labeled "Priority 1" should be among the first to be considered to address the specific enrollment
conditions or the facility's unique challenges; "Priority 2" strategies should be among the next
group to be considered, and so on. Strategies are classified according to three types, ranging
from most to least expensive (1) Permanent Construction; (2) Temporary Construction; and (3)
Non -Brick and Mortar.
While many of the HSWG's recommended strategies are incorporated into Table 5, others were
added, revised, or ruled out by a smaller steering committee of Advisory Committee members
(i.e., DiNisco Design, Director of Public Facilities, Director of Planning and Assessment, and
Superintendent of Schools). Once the list of high school strategies was refined, it was brought
back to the full Advisory Committee for final approval. Table 5 reflects the Advisory Committee's
agreed-upon list of prioritized high school strategies in order of importance.
High School Enrollment: Lower than Projected
Lexington High School is significantly overcrowded; if enrollment is lower than projected, must
first continue to explore the possibility of a new or renovated high school project. If future
enrollment is lower than projected, we have an opportunity to rethink and potentially shift the
remaining student populations and programs in order to renovate existing facilities. For the
sake of argument, let's imagine for a moment that a significant portion of our high school
population decides to learn through some alternative State -sanctioned remote option, such as a
Virtual High School, due to ongoing pandemic -related fears. While this scenario is unlikely, if it
were to occur we would not know the final enrollment figures for certain until October 1st, the
date by which enrollments are finalized. If we do have a lower than projected enrollment of
1,850 - 2,250 students in a given year, the window of opportunity to address existing facilities
issues would be relatively short. So what can we do if this occurs, particularly if we experience
lower than projected enrollments several years in a row? The deteriorating condition of the high
school facility needs constant attention and maintenance. It also would be an ideal time to
continue to implement the non -brick and mortar space -mining strategies identified by the
HSWG. The Advisory Committee also explored the possibility of consolidating grade
reconfigurations, such as bringing a grade up to the high school. Given the fact that the building
is already overcrowded, it would be a highly unlikely and unrealistic strategy, unless we
experienced multiple years of declining enrollments. A more feasible strategy would be to get a
head start on those projects that would alleviate future anticipated enrollment pressure, such as
those identified in this Lexington High School soace-mining document.
High School Enrollment: As Anticipated
If the enrollment follows the anticipated profile, with 2,250 - 2,450 students, we plan to continue
to explore a partnership with the Massachusetts School Building Authority to fully renovate and
expand or fully replace existing high school facilities. Further, we will continue to identify and
implement the space -mining recommendations outlined above. The Advisory Committee also
recommends the exploration of a Town -financed study to address outstanding community
questions, such as questions related to the design of a building using high quality building
standards and the land suitability for a new or renovated high school given the current site's
wetlands. It is important to note that this study or undertaking is not to be confused with the
feasibility study that is part of the MSBA's process. The purpose of the Town -funded study is to
answer specific issues raised by various Town committees related to the construction of
permanent buildings. Finally, if enrollments are "as anticipated," it presents an opportunity to
consider a range of temporary structures from tents to construction -style mobile options for
extra seating during lunches.
High School Enrollment: Higher than Projected
If future enrollment is higher than expected, with 2,450 - 2,650 students, there are a series of
strategies to be considered. Some of the strategies identified in Table 5 below are duplicative
and identified in the aforementioned sections related to lower than projected and as anticipated
enrollments, such as Priority 1.
1111
: : slodl111111 iiia iiir, iii ��� iiia l IIII°°°1111 ilii � mm iiu� iiu�u IIIA iiu ,
'"
29
Type: Permanent
Minor costs will be incurred to conduct a study or
The MSBA will
Construction.
analysis to address the community's outstanding
communicate the status of
questions.
our SOI Submission #3 in
Priority 2: Explore
1+
Substantial additional costs are associated with a
December, 2021.
the feasibility of a
new school construction project that is not
+.++
Could the timeline for
Town -financed study
subsidized by the MSBA.
completion of a renovated
to answer community
++++
Conduct an analysis to see if it is more
high school be expedited if
questions about
advantageous to build without external
funded locally?
permanent buildings
funding. Consider escalation costs as other
and construction.
communities have done to determine if it makes
sense to fund locally or wait for MSBA approval
(e.g., for every year we wait on a new or
renovated school, we can reasonably assume 6%
in escalation costs.
+++-
Director of Public Facilities to prepare an itemized
analysis/ breakdown of the $175M need identified
for Town -wide projects to maintain current
facilities. Identify and itemize the funding needed
for school -specific work and present to the Master
Planning Committee and School Committee.
Type: Non -Brick and
Science Lab renovations. Initial cost estimates
A comprehensive space
Mortar.
$1.5M; final cost approximately $150K.
mining exercise was
++++
Minor costs associated with additional moves
completed in January,
Priority 3: Identify
(e.g., IT relocation to Central Office building).
2019.
and implement space
In progress: Science Lab
mining options.
renovations and IT
Relocation completed in
July, 2020.
Type: Temporary
+.++
Continue to explore LABBB Collaborative
+.++
In 2021, review portable
Construction.
cost -share options given that the greatest number
needs with the Master
of LABBB students are on the LHS campus.
Planning Committee and
Priority 4: Plan for
++++
Portable cost estimates done by DiNisco in 2019
consider the submission of
occupancy of
were approximately $4M for less square footage
a proposal at Fall Town
portable (not modular
than what is currently used by LABBB.
Meeting.
or prefabricated)
It,
Portables meet both
additions for ILIHIS by
capacity and programming
the 2022-2023 school
needs and provide
year.
flexibility.
Type: Temporary
Cost estimates vary. Tents and Open Campus are
40-
Enrollment pressure exists
Construction.
affordable options that have been leveraged
now at the high school and
during the pandemic.
is especially taxing on
Priority 5: Consider
shared spaces (e.g.
options to alleviate
cafeteria).
the pressure on
shared large spaces,
such as tent -style
construction to
"Open Campus" to
create extra seating
during lunches.
30
Type: Non -Brick and Transportation costs may increase, depending on A comprehensive space
Mortar. the new site location. Based on current staffing mining exercise was
levels, the services provided, and ineligibility for completed in January,
Priority 6: Consider Circuit Breaker claims, a relocation may not result 2019 (see LH3 ap3u
alternative locations in extraordinary additional costs. Mining F�ecommendations
for sub -separate January 24. 2019 and
programs such as meeting presentation from
ILP3. March 8, 2019).
31
VIII: FOR FURTHER CONSIDERATION
Land Swaps or Purchase
Another strategy identified by the Advisory Committee members is an active search for new
sites for possible future school construction and/or swing space. The Advisory Committee
reviewed potential sites for a seventh elementary school or other school facilities should the
need eventually arise. Two such sites are the site of the current School Central Office Building
in the old Harrington School building and the Laconia St. school site. Neither of these has
sufficient area for an elementary school with associated athletic fields and both have other
drawbacks so neither is close to being ideal. The Advisory Committee therefore recommends
that the Town keep an eye out for properties that could be acquired to serve, if the need arises
in the future, as the site for a seventh elementary school or as the location of the School Central
Office in case the Old Harrington site needs to be used for school expansion.
The Advisory Committee also discussed land swaps or land acquisition through purchase or
eminent domain takings. The Lexington Public Schools currently owns the following sites:
• Old Harrington School: located at 146 Maple Street, next to Harrington Elementary
School and houses the LPS Central Office staff, as well as the following departments:
English Language Learners; Special Education; Curriculum, Instruction, Assessment,
and Professional Learning; Human Resources; and Innovation and Instructional
Technology.
• Laconia Street: This site does not have access from major roads and includes steep
topography. It also includes existing walking trails, and it is surrounded by privately
owned parcels.
• 173 Bedford Street: This site was previously occupied by Liberty Mutual and was
designed as office space. It was used as a temporary fire station, and is expected to be
used as a temporary police station in the future. The previous Town Manager indicated it
may be a useful swing space for LPS Central Offices, should the need arise to build
another school on the Old Harrington school site.
The Town of Lexington owns multiple other open sites, some of which are substantial in area.
Many are in conservation, while others have other types of special status. There also may be
some privately owned open areas that are substantial in terms of size. It is not clear that any of
these sites would be an appropriate site for a school facility. Nonetheless, the Advisory
Committee noted that as long as the possibility that one of these land holdings might be useful
as a site for a school facility in the future, it wished to go on record that such possibilities, even if
remote, should be kept in mind by town officials.
32
High Performance Facilities
In October 2019, the Select Board and School Committee (SC) approved the Intecarated
Buildin Design &Construction Policy for all Town funded building projects, including LPS
school building projects. The goal of this policy is to "achieve the highest reasonably attainable
and economically viable performance standards for health, energy, and resilience." According to
this policy, a high performance facility will build on the LEED standard but with a particular
emphasis on:
• Creating a healthy environment, by focusing on indoor air quality and ventilation,
minimizing the use of toxics and minimizing burning of fossil fuels onsite.
• Creating an energy efficient, low operating cost structure by (1) optimizing layout to
maximize passive energy and maximize onsite renewables, (2) selecting materials and
equipment that allow the facilities group to minimize energy use and cost and (3) striving
for a net zero facility.
• Maximizing the utility of the buildings, from a resiliency standpoint, taking into account
short term weather events (e.g. heat waves, black outs, storms or floods) and expected
longer term changes in climate conditions
Hastings School and Lexington Children's Place were both developed using the performance
standards included in the Integrated Building Design & Construction Policy. Per the Integrated
Building Design and Construction Policy, any future projects, including a new or renovated high
school, will include steps to answer key questions related to the specified building standards.
This analysis would inform the design of any new LPS buildings.
Town staff are working on developing similar high performance standards for existing buildings.
Once established, the Facilities department will work with a stakeholder group to develop a High
Performance Building Operations Policy that will state our objectives and approach to
measuring building baseline performance. This subsequent monitoring for adherence to these
standards will allow LPS and the Town of Lexington to identify and prioritize gaps to close,
integrating any necessary work into the capital planning and maintenance schedules.
33
Sallll a iiir a iii I t iina s Illk IIII e Illlllllli iii a iii°°g
The Town of Lexington Department of Public Facilities has negotiated several solar energy
Power Purchase Agreements (PPA) to install solar energy systems for nine schools (see Table
6). The projects will provide significant economic and social benefits to the Town of Lexington.
°"'a lllh Mlle tt Ill aaJiii uii to in S61io6I SoIIIair IIIIIIIIIII uu° aur °tauu°�i
i::::::coinornic I1::3einetl1t4
.............................................................................................................................
The Power Purchase Agreements (PPA) take advantage of various state and federal incentive
programs to deliver savings to the Town. The Town is expected to save $7,735,311 over the
20 -year PPA duration. The solar energy systems generate revenue for the Town in the form of
electricity savings, PILOT payments paid by the developer, and energy storage (battery) related
savings.
I Ilealft['i IE:: einetlits,
......................................................................................................
The Lexington Children's Place and Hastings Elementary School are projected to be net -zero
energy facilities.
34
The solar energy systems at the nine schools will produce 4,428,102 kWh of renewable
electricity annually. This represents approximately 40% of the Town of Lexington's annual
electricity use. This reduction is equivalent to the electricity used by 600 homes and provides
$2.3 million in health benefits from greenhouse gas emission reductions over 20 years.
Additionally, the avoided fossil fuel consumption from these projects will result in a yearly
2,255 -ton reduction of CO2 emissions.
Lexington teachers utilize the solar energy systems as educational tools, including real-time
monitoring and dashboards available to students, and for public outreach at school or public
events.
IX: NEXT STEPS AND ONGOING REVIEW
To ensure a flexible master planning process, the district will continue reviewing key reports and
other information relevant to capital planning decisions and publish a brief update no less than
two times a year (January and June). These updates will include critical highlights from data
sources relevant to capital planning and described in further detail below, the status of projects
underway, and any major adjustments to the district's master planning documents.
Reviews will be facilitated by the Superintendent of Schools, Director of Facilities, the Assistant
Superintendent of Finance and Operations, and the Director of Planning and Assessment. We
will engage other local bodies and departments, such as the School Committee, the Select
Board, the Planning Board, the Appropriation Committee, the Capital Expenditures Committee,
Sustainable Lexington, and various school departments (e.g., curriculum, special education).
We will engage these stakeholders to gather new information and provide opportunities to weigh
in on decisions related to school projects, well in advance of their implementation.
In subsequent reviews, we should consider the following data sources and contacts:
I°°alll 11 ui ii iii f° r
� IIIC'f� uir�. ui iii
Annual review of LPS enrollment & projections
Population trends based on Town Census
Annual Town and LPS budgets
Anticipated programmatic curricular/pedagogical shifts
Anticipated programmatic changes in special
education
35
LPS Dir. of Planning & Assessment
Town Assessors & Town Clerk
LPS Assist. Superintendent of Finance and
Operations
LPS Directors of Elementary and Special
Education
LPS Director of Special Education
LPS strategic planning updates
LPS Superintendent of Schools
Mechanical systems review & replacement plan
Director of Public Facilities
General space utilization inventory and facilities
update (e.g. major renovations to existing facilities or
Director of Public Facilities/Building
new construction since last review)
Principals
Housing and development trends (e.g. updated
information related to housing inventory, occupancy
Town of Lexington Planning Department
rates, permits and teardowns, new development,
sales, changes to zoning)
Annual review of Town's land holdings
Town of Lexington Planning Department
Sustainability policies and requirements, including
Director of Sustainability
adherence to the Town of Lexington Integrated
Director of Public Facilities
Building Design & Construction Policy
Updates from Town Comprehensive Plan
Town of Lexington Planning Department
Updates from Town's Capital Plan
Director of Public Facilities
W.
Appendix A: ABOUT OUR PLANNING PROCESS
In the early stages of the master planning process, the overarching vision was focused on
achieving consensus on the next "core" or high-priority capital project for the Lexington Public
Schools. Initially, the Advisory Committee anticipated a need to focus on additional elementary
school spaces, as previous growth has been concentrated at this level; however, updated
enrollment data suggested that attention be focused on the secondary level.
The first Advisory Committee meeting was held on September 18, 2018. Members agreed that
the current planning effort should be viewed as a continuation of the last round of master
planning. The district fully updated its facilities master plan in 2014, with the assistance of
Symmes, Maini & McKee Associates (SMMA). Shortly thereafter in February 2015, the
Lexington Budget Collaboration Summit (Select Board, School Committee, Appropriation
Committee, and Capital Expenditures Committee) published their consensus position, generally
referred to as the "School Buildin Project Consensus PIan91 or "Consensus Plan." Advisory
Members suggested that we reference these previous plans as a reference point and to identify
accomplishments.
Over the course of the first few meetings, preferred elements and features of the revised Master
Plan were identified. These elements were based on the individual expertise of Advisory
Committee members, as well as a review of the prior Master Plan and sample planning
documents from other communities. Members agreed the tone should be objective, explicit,
transparent, and accessible, and envisioned a plan that would include a thorough problem
identification and needs assessment. Information that Advisory Committee members were
particularly interested in reviewing included an overall educational vision and programmatic
assessment, current space inventory and usage, current facility conditions, specific analysis of
special education facilities and needs, analysis of enrollment and potential enrollment drivers,
and financial modeling, including predictable maintenance costs.
Advisory Committee members also were interested in understanding the broader community
context and vision for the future in terms of, e.g., sustainability goals and major municipal capital
projects. They wanted the plan to describe the process used to develop solutions, including
details about what information was reviewed and what solutions were considered. With respect
to solutions or options, in addition to capital projects to expand facilities, it was agreed that the
plan should identify other strategies that can be used to manage growth, such as redistricting or
grade reconfigurations. Finally, members agreed the plan should be explicit and clear about
intended outcomes and the expected timeline.
The planning process was expected to take into account a wide range of information and
options, and Advisory Committee members knew from the outset that some unknowns would
remain at the conclusion of the master planning process, e.g., that longer-term enrollment
projections are not necessarily accurate, especially because of the possible occurrence of
economic downturns and the completion of new housing developments. Therefore, it was
37
agreed that the plan should include built-in flexibilities. The plan should reasonably anticipate
scenarios with lower, higher, and mid-range enrollment growth, while being clear about the
parameters and assumptions that were used. Furthermore, following the example of the School
Building Project Consensus Plan, the Compendium will be reviewed annually and adjustments
will be made as needed.
The Advisory Committee moved onto a series of meetings devoted to a thorough needs
assessment, including gathering and reviewing relevant information. With assistance from the
Enrollment Advisory Group (EAG), the Advisory Committee closely reviewed available
enrollment and projections. Integrating new enrollment information, DiNisco Design conducted
and shared the results of an overall space inventory, including planned operating capacities.
Building upon information gathered by DiNisco Design, a team of LHS staff and administrators
offered additional details on current space challenges, implications given potential future
enrollment, and possible solutions. Capitalizing on the expertise and knowledge of Advisory
Committee members, the needs assessment was also informed by presentations from other
Committee members. For example, the liaison from the Lexington Appropriation Committee,
Alan Levine, provided an overview of financial considerations for ca ital tannin . Charles
Hornig from the Planning Board provided important overviews of school system history and
potential alternate school sites.
With a needs assessment complete, the Advisory Committee participated in a series of
collaborative activities designed to surface the most promising solutions. One of the most
productive was a grade span analysis of needs, based on enrollment projections and the
right -sizing of buildings. Advisory Committee members were divided into what we will refer to
as "Grade Span Working Groups" (GSWGs), which were arranged according to master planning
considerations for elementary (PK -5), middle (6-8), and high school (9-12). Each of the three
GSWGs was asked to (1) answer a series of planning questions; (2) develop a set of grade
span -specific recommendations; and (3) identify any missing or superfluous strategies they
would not consider and, therefore, should be removed from consideration. An important step in
this process was for each grade span group to make a final presentation to the full Advisory
Committee with an opportunity to debate recommendations. Grade span working groups then
took the feedback from the Advisory Committee and adjusted their recommendations
accordingly. DiNisco Designs also weighed in on the recommendations made by the GSWGs,
highlighting support for certain ideas or questions pertaining to strategies that they found
particularly problematic based on their knowledge of Lexington's school facilities and the data.
Based on the results from these exercises, the Advisory Committee developed a master list of
strategies to consider in the planning process. Eventually, this list was winnowed down to the
following strategies for further discussion:
❑ flexible school assignment;
❑ increases in class size, coupled with increased staffing (e.g. instructional assistants);
❑ repurposing non -instructional spaces (e.g. staff offices, conference rooms);
❑ repurposing art and music spaces;
❑ repurposing literacy libraries;
❑ the potential relocation of district -wide special education programs (e.g, Fiske to
Hastings or Estabrook);
❑ the use of modular additions to existing buildings;
❑ the use of the "Old Harrington," the current central administrative office building for a 7th
elementary school or a 3rd middle school; ;
❑ the purchase of property near existing schools for future expansion (e.g., housing
kindergarten in a modified home structure similar to the Lexington Montessori School);
❑ the use of the Laconia Street site for possible central administrative offices or a new
school;
❑ grade reconfigurations (e.g., move 6th grade from the middle school to the elementary
level or moving Kindergarten or 5th grade to a new location, move 8th grade to the high
school);
❑ land -swap opportunities or acquisition of land;
❑ the demolition and replacement of Bridge or Bowman and/or use as swing space;
❑ yearly space -mining exercises to be conducted by building principals in collaboration
with school community members.
39