HomeMy WebLinkAbout2025-06-30 SB Packet - ReleasedJOINT SELECT BOARD AND SCHOOL COMMITTEE MEETING
Monday, June 30, 2025
Select Board Meeting Room, 1625 Massachusetts Avenue, Lexington, MA 02420 - Hybrid Participation*
6:30 PM
AGENDA
ITEMS FOR INDIVIDUAL CONSIDERATION
1.Lexington High School Project Vote Timeline and Article 97 Update
ADJOURN
1.Anticipated Adjournment 7:30pm
Meeting Packet: https://lexington.novusagenda.com/agendapublic/
*Members of the public can attend the meeting from their computer or tablet by clicking on the
following link at the time of the meeting:
https://lexingtonma.zoom.us/j/82013535294?pwd=mGvKYC9PHOT8ByUHHa0a18jNRhRXpf.1
iPhone one-tap: +13017158592,,82013535294#,,,,*848540#
Phone +1 646 876 9923
Meeting ID: 820 1353 5294
Passcode: 848540
An Act Relative to Extending Certain State of Emergency
Accommodations: https://www.mass.gov/the-open-meeting-law
The next regularly scheduled meeting of the Select Board will be held on Monday, July 7, 2025 at
6:30pm via hybrid person participation.
Hearing Assistance Devices Available on Request
All agenda time and the order of items are approximate and
subject to change.
AGENDA ITEM SUMMARY
LEXINGTON JOINT SELECT BOARD AND SCHOOL COMMITTEE MEETING
AGENDA ITEM TITLE:
Lexington High School Project Vote Timeline and Article 97 Update
PRESENTER:
Board Discussion
ITEM
NUMBER:
I.1
SUMMARY:
Category: Discussion & Decision-making
The Board will receive an update from members of the Project Team regarding Article 97 and the overall
project timeline, including anticipated Special Town Meeting and Referendum dates.
SUGGESTED MOTION:
FOLLOW-UP:
DATE AND APPROXIMATE TIME ON AGENDA:
6/30/2025
ATTACHMENTS:
Description Type
Article 97 Presentation and Project Timeline Backup Material
Article 97
Article 97 of the Amendments to the Massachusetts Constitution, approved by the voters in 1972,
established a right to a clean environment including its natural, scenic, historical, and aesthetic
qualities for the citizens of the Commonwealth.
To authorize the change in use of Article 97 land, the Town must secure a two-thirds vote of
Lexington Town Meeting, a two-thirds roll call vote of both houses of the Legislature, and a
determination and finding from the Secretary of the Executive Office of Energy and Environmental
Affairs (EOEEA) following submission of required documents to their office.
Locus Map
Existing Protected Area of Land Use Proposed Protected Area of Land Use
Existing Protected Land Use Proposed Protected Land Use
Existing Area Before Transfer Proposed Area After Transfer
Proposed Land Delineations After Transfer
This map identifies the
limits of land that
protected under Article
97 before and after land
swap.
Area with no color
overlay is existing land
for school use not
protected under Article
97 that has not changed.
Area with blue color
overlay is existing land
protected under Article
97 that has not changed.
Area with orange
color overlay is
existing land that will
be changed to “not
protected under
Article 97”.
Area with yellow
color overlay is
existing land that will
be changed to
“protected under
Article 97”.
What is the Article 97 Process?
An Act Preserving Open Space in the Commonwealth, known as the Public Lands Preservation
Act (PLPA), codified in November 2022, establishes process for Legislature to authorize
change in protected land.
PLPA process:
1. Notify public and EOEEA and conduct alternatives analysis demonstrating all other
options to avoid or minimize Article 97 disposition have been explored and no other
alternatives exist or are feasible
2. Submit alternatives analysis to EOEEA via PLPA portal and make analysis public
3. Identify replacement land that is of equal or greater in value as determined by an
appraisal
4. Dedicate the replacement land in perpetuity
Article 97 & Project Timeline
January 02, 2024
Initial project introduction call with Massachusetts Environmental Policy Office (MEPA)
March 15, 2024
Initial project introduction call with Executive Office of Energy and Environmental Affairs
(EOEEA)
May 15, 2024
Follow up call with EOEEA for project update and PLPA portal process discussion
July 30, 2025 (to be confirmed)
Community Meeting for Environmental Justice (EJ) Discussion
August 13, 2025
Community Meeting to Discuss Project Budget
Article 97 & Project Timeline
August2025
Lexington to submit application to Executive Office of Energy and Environmental Affairs
(EOEEA) through PLPA portal
Submission includes:
•an explanation of why the proposed change in use is necessary;
•an alternatives analysis;
•maps and descriptions of the impacted land;
•maps and descriptions of the proposed replacement land;
•a description of the current Article 97 uses and natural resource value;
•an appraisal report;
•approvals by public agencies; and
•submission of the draft authorizing legislation.
August 18, 2025
SBC must vote to submit Schematic Design submission (includes design, schedule and
budget) to MSBA (for October MSBA meeting)
August 28, 2025
Schematic Design Submission to MBSA
Article 97 & Project Timeline
September 8, 2025
Team will present Schematic Design to Select Board per Integrated Building Design and
Construction Policy
September 2025 TBD
Community Meeting
Mid-September
Select Board votes to call for referendum and Special Town Meeting (per law, referendum
must be called by LSB at least 35 days out)
October 29, 2025
MSBA Board meeting to accept Schematic Design Submission and approval of the Project
Scope and Budget
October 2025 TBD
Community Meeting
Article 97 & Project Timeline
November 3-4, 2025
Lexington Special Town Meeting – 2/3 vote required for both Exclusion & Article 97
November 17, 2025
Debt Exclusion Referendum
Fall/Winter 2025/2026
Anticipated timing of EOEEA issues decision on proposed change in use
Fall/Winter 2025/2026
Lexington will file a bill with the Legislature following Special Town Meeting approval and
EOEEA determination.
Winter/Spring 2026
Anticipated timing of Legislative action on proposed bill
July 2026
Break ground
See the Project Website for additional FAQ’s related to this topic: LHS Website