HomeMy WebLinkAbout1958-03-SSBC Lexington's Junior High School Program.pdf R E P O R T Standing School Building Committee
Lexington, Massachusetts
March 1958
a
1.
S y d
q a.
..mow Z
+
14@i1 t
' 'ttta
e"t1F, ",,..„ .' :
_ i«tTi•e
41
pa
w 1
%
a .1_,H;
; 4.[.�- ,.,,,,, - ._. ''. ... 1
r
, ji w i { i
I
i �', t.
5
LEXINGTON'S
JUNIOR HIGH
SCHOOL PROGRAM
Committee Superintendent o f Schools
ALVIN W. DAVIS JOHN BLACKHALL SMITH
ELEANOR P Fox Education Consultants
FREDERIC K JOHNSON CAMBRIDGE CONSULTANTS, INC
WILLIAM G POTTER
ROBERT B KENT, Secretary-Treasurer Secretary
AUSTIN W FISHER JR , Chairman DOROTHY D SEYMOUR
Committee Report
The Standing School Building Committee was established 1958 Town Meeting for the construction and equipping of a
under Article 37 of the Warrant for the 1957 Annual Town new Junior High School on land owned by the Town and
Meeting to handle all phases of school building projects appropriated $75,000 for the necessary expenses. There was
authorized by the Town. The Committee was appointed late not time to complete this assignment, although drawings and
in May of 1957 and held its first meeting on June 4. specifications are sufficiently complete for the estimate of costs
The 1957 Annual Town Meeting under Article 40 of given in this report. The Committee expects to have firm bids
in hand by the end of April 1958 at which time it will
the warrant directed the Committee to prepare final plans recommend appropriation of the necessary funds based on
and specifications and bring in firm bids for action by the
1958 Town Meeting for the remodeling of the present Junior the lowest responsible bid
High School and appropriated $40,000 for the necessary With two major projects and a very tight time schedule,
expenses This assignment has been carried out and bids are the Committee has met on the average of more than once
to be opened on March 18 The Committee will recommend a week since its formation. The amount to be done was so
appropriation of the necessary funds under Article 40 of the great that the Committee decided, in order to fulfill its
1958 Town Warrant on the basis of the lowest responsible responsibility properly, that it should retain educational
bid submitted consultants. The Committee has no reservations in stating
that this expenditure has been more than justified in shortening
Under Article 41 of its Warrant, the 1957 Annual Town the time required to carry out its assignments and in saving
Meeting further directed the Committee to prepare final plans money through taking advantage of information and ideas
and specifications and bring in firm bids for action by the which otherwise would not have been available
Complete drawings and specifications for both protects
may be examined by any citizen at the offices of the Super
intendent of Schools or of the two architects
Accounting for
Appropriated Funds New Building Renovation
(Paid or committed
under contract)
Architects and Engineers $70,000 00 $35,000 00
Site maps and borings 1,900 00
Consultants 2,000 00 2,000 00
Clerical Assistance 90 00 200 00
Office supplies, postage, etc. 156.43 127 35
Report (estimated) 250 00 250 00
Balance 603 57 2,422 65
Total Appropriation $75,000 00 $40,000 00
Respectfully submitted,
AUSTIN W FISHER, JR., Chairman
The Function of the
Standing School Building Committee
The basis for the design or renovation of any school
building is the education program established by the School
Committee. This determines the number and type of teaching
stations, the size of classes and the necessary general facilities.
In addition there are state laws governing public buildings in
general and schools in particular with regard to factors
involving health and safety The School Building Assistance
Commission also has standards for the approval of new
school plans Within the framework of these requirements
the Committee and its architects and consultants must work
out a design which provides the Town and the School Depart
ment with the best practical building at the lowest possible cost.
The Junior High School Program
The objective of the Junior High School, as established
by years of success throughout the country, is to provide for
a sound transition from the closely directed, fixed group
system of grades 1 to 6 to the more flexible, individual
program of the High School. In another sense, it is intended
to cover the period of adjustment between childhood depend
ence and adolescent independence. It is not the function of this
report to present or justify this program. However, it is
important to note that it brings about some differences in
building requirements from either elementary or high schools.
From 1929 to 1953, Lexington had in effect a three year
Junior High School. However, it shared a building built for
a Senior High School with the upper three grades In 1953,
grade 9 was moved to the new High School and grades 7 and
8 shared the building for two years with a Central Elementary
School. Since 1955 it has been occupied by grades 7 and 8
only As of September 1959, the High School will not have
room for the four upper grades and the present building
will not be adequate for grades 7 and 8 The School Committee
proposes a return to an up to date program of a three year
Junior High School system, by providing a new building
in addition to the present facility to solve this problem. The
1957 Town Meeting in effect approved this approach. The
Standing School Building Committee was requested to provide
in these two buildings a total normal capacity of 1700 pupils
and a maximum capacity of 1800 to 1850
Remodeling of the Present Facility
Architect C. HARRY ERICKSON, Lexington
Engineers CLEVERDON, VARNEY AND PIKE, Boston
The present Junior High School building is structurally practical for the building to be left unoccupied during a
sound on a small but adequate site in a good location. The school year, there is no advantage from a school operation
older part was built in 1908 and the rest added in 1925, all point of view Economic forecasters indicate that construction
on the basis of use as a High School. While no significant costs will continue to rise significantly in the next few years
changes have ever been made, the building has been well so that postponement for two or three years would mean a
maintained. There is no reason why it cannot be used as a higher cost to the Town. Furthermore, some of the items in
Junior High School for at least another twenty years if the program cannot be further delayed and would have to
properly renovated according to the proposed program. be done separately at somewhat higher cost.
This Committee has been charged with providing for The Committee considered carrying out the program over
the same educational and activities program and, insofar as two or three years Several of the major problems such as
possible, the equivalent in facilities as is being provided for lighting and ventilation involve essentially the whole building
the children who will use the new building. It has also It would be much more efficient to complete all needed work
considered that all facilities should be brought up to a while the various trades are in the building. Overhead items
condition such that only normal maintenance will be required would be lower if the job were done all at once. Any incon-
for at least the next twenty years venience to school operation can be scheduled and will occur
The Committee had the advantage of two previous studies only once. Since the cost of the project can be bonded over
of the renovation problem, one by the Junior High School a ten year period, the Committee decided that the most
Survey Committee in 1955 and the other by the School economical approach for the Town is to include all essential
Committee and the Architects Collaborative which resulted items under one general contract to be carried out during
in a proposal to the 1957 Annual Town Meeting. This proposal the spring, summer and early in the fall of this year Some
items have been included which were not in the 1957 proposal.
was rejected The present Committee was then provided with
$40,000 and directed to reconsider the problem and to bring On the other hand, the Committee has not included a number
in final bids to the 1958 Annual Town Meeting A complete of possible changes, which,while desirable, were not considered
resurvey of the facility has been made and the Committee of sufficient importance to justify their cost to the Town.
has reconsidered all aspects of the problem in preparing the The proposed renovation program can best be presented
specifications on which bids will be based. under four major headings (1) modernization of general
Careful consideration has been given to the advisability services, (2) changes or improvements to specific areas needed
of further postponement. Since the need for the facility is to satisfy the program or to make them fully useful, (3)
clear and there is no time in the future when it would be redecoration and repairs and (4) equipment.
Modernization of General Services First Floor
(about 40% of total cost)
Move Principal s office to. present Superintendent s
The present lighting is far below today s standards office with minor changes (The School Committee
throughout the building (7 vs 25 foot candles in classrooms) has decided to provide facilities elsewhere for the
Installation of fluorescent fixtures throughout, though in them- Superintendent and his staff, releasing the equivalent
selves more expensive than incandescents, will avoid the of four classrooms.)
necessity for rewiring and will be cheaper to operate for
the same illumination. Convert present Principal s office to adequate library
Enlarge three classrooms in old section by moving
The existing heating and ventilating system is below corridor wall which must be replaced anyway
standard and poorly controlled. An increase in air circulation
is required but will be offset by more efficient use of fuel with Minor revisions in other classrooms, music rooms
modern control Individual room units in the old section will and stage.
replace the present central fan and ducts. New separate systems Provide floor in light well beside auditorium for
in the gymnasium and auditorium will permit the present storage and conference rooms.
central blower to satisfy requirements in the new section.
Some plumbing changes and improvements are required Second Floor
including a new hot water system. The sprinkler system
must be expanded. Convert present library and adjacent classroom to
art rooms.
It is important to note that while state health and safety
Provide floor in light well beside auditorium for
laws cannot be made retroactive, once any revision is proposed rest and work rooms for teachers
zt must bring the building up to the full present requirements
in order to be approved Minor changes in science rooms and other classrooms.
Changes and Improvements Third Floor
(about 30% of total cost) With the release of four classrooms by the removal
of the Superintendent s office, the required capacity
Basement—no items in this category of 800 to 850 pupils can be realized without use
Ground Floor (this is the area of major change.) of the third floor Space is actually available for
Expand and improve the kitchen by rebuilding only three classrooms There are operating disad
front steps to building.
vantages to a four-story building and the safety
Expand the cafeteria and teachers dining room. problem in case of fire or panic is real.
Rebuild present boys locker room for girls (Present The total direct cost of renovation of this area (not
area so bad that girls do not take showers) including related fees and other overhead charges) for regular
Relocate homemaking rooms to area of present girls use of 90 pupils was estimated at $45,000, including satisfying
locker room, putting all girls activities together on state safety codes and providing proper lavatory facilities.
north and east sides. This cost per classroom or per square foot approaches the cost
for building the equivalent new space. For these reasons the
Provide new boys locker room in area near shops
Committee decided that the third floor should be abandoned
in space now largely used for fans and ducts.
as instructional area. Access will be restricted by locked folding
Minor rearrangement in shop and drawing areas. gates so that the area can be used, if desired, for storage or
Balance of ground floor rearranged for storage, occasionally for special supervised student projects No changes
maintenance, student activities and audio-visual space. or redecoration will be made in this area.
Redecoration and Repairs
(about 15% of total cost) Equipment (about 15% of total cost)
Under this category all areas will be repainted using a The revisions and improvements plus a few special
modern color scheme and repairs and patching to floors, walls requirements of the 9th grade will necessitate some new
and ceilings will be made as necessary Many areas of the equipment. The bulk of this cost will be in kitchen and
building already are in need of this now and with the changes cafeteria equipment, lockers for physical education and corridor
in lighting and ventilating in practically every room as well use, a new folding door in the gym to replace worn-out canvas
as other revisions, a complete redecorating job will be essential curtain, new instructors tables for science, homemaking equip-
following their completion.With the several trades in the build ment. Replacement of existing equipment is limited to those
ing under regular supervision during the program, redecoration needed items which must be installed by a contractor
can be done most efficiently as part of the overall contract.
Cost of the Program
Accurate cost estimates for a renovation program are
extremely difficult. Final bids (on the basis of 27 drawings
and a 250 page book of specifications) will be on hand to
form the basis of the actual request for appropriation at the
1958 Annual Town Meeting. The architect and the engineers
have analyzed the program carefully and estimate that the
total cost should not exceed $570,000 including the $40,000
already appropriated. This includes items of 10% of the
general contract for contingencies, 10% for architectural and
engineering fees plus provision for a clerk of the works and
other committee expenses. In estimating the portion of the
total cost for the four categories described above, all of these
overhead items were distributed on a proportional basis.
By special Act of the State Legislature (Chapter 4 of
the Acts of 1958), Lexington is permitted to borrow for a
ten year period outside of its debt limit up to $600,000 for
this project. Recommendations as to the actual pattern of
financing will be presented to the Town by the Appropriations
Committee and the Capital Expenditures Committee.
tarbeme nWsreuuNTS
SAMNA T LM >,3133,1 Aw2[G.na
.Cuomt C aLD ® J I®
lTOILET >PEOM/
D
C s1.TIw >Aus STOeAo[ • �
>ToE31 EA UK. �Tte- te-- 1r-•. 0
•-f-
�
t SEAMS SA TTees.
JT 51.01.42 a9 TELMILLs'WoeNOON [ > 'iD ®
A ® T( I®
onto Zoom 41 WOMEN TM/UM'21STb Fee KOOM 12 wokws Mart ' L TJI e 51
N Ller.ecy 1<Nue.
D AUDIO-Vlsu4t 41 STOLL.4 Wote Ae[A 1^
N T SCAMS DINING b u[ntte took.
T D T CIAN 19 ADM NISTALTIDN OIf,e2
b tITCN[N 90 V ca PCINCIPAS S E C 1`�
9 LecnvlNo R ST02AGL 51 Pe1NC PAL ll
I�' IF , 1 til' , Wim/,
m 06120y22a X GOATS}5,oeece Y III ll, A :' 0 v
21 CAMELIA U AUD,T000N
22 ALT N STAG.
23 STUD'NT ACTIvrty eh D'ouvr hers
Loc
ey
21 LoeS2 Boy,Loc.[,YOWL
CL[CTe1cAL 96 GILs'Locatea
Km
u
u(ootl u INATLUCToe
17GLDTU132G 195NON[t,
9e LIVING ALcov[ 20 DU N4
29 LtN[Dlel N[Gun I I 11®I
Jo LY4l G2OUP ID>TtUGT,DN 22 Geou 133,221•2, �'6 QA`
31 4Ne(mote121.3 OcxnTu 25 PASS G./WAN.E
St Ukleoew3 2,30200042 ®
J1.
y 2
.11I
® �®1®1®i® 2 3� _
:1® 0
—r i
„-„, T-0 ,.....J
1"1 �� .0
.:OI. _
._____.
„ivr�
r,
r II/® • Iii ® 1
Ili-
►> t
, ilit
L v I S T r ®� F L is. II R
L_ J
Ii--
®-re1t° 14 C
® I
@
0
o ® Q ��
. ;.0.7,,,, d s,
„ dkms.'vt
v „yW rind, . ~r ' p; E . ,, -, ,_e At
4 4
•
i .,7N. ,:¢4arf Y�L 3' 'ht:': '^
4,,'.-2F,.Eby'afi.,°,:f.'fi-', ,`A,'.:'"ir,r .' 4Z'f,
.,k,,-
e 4 f44;..114,101 S'
O '; "`.SYS"• ,,,r,,-:=014, - .,. ,.
Yl, +�R: ...
_,_ w
C'
V::
The New Junior High School
Architect CHARLES H. COLE 2ND, Lexington The Building
Engineers CLEVERDON, VARNEY AND PIKE, Boston
Landscape Architect SHURCLIFF, SHURCLIFF AND Descriptive material on the building and a floor plan
MERRILL, Boston follow The Committee has done its best to take the following
factors into account in all its decisions
Equipment Consultant SAMUEL CRABTREE, Belmont
1 The education program prepared by the School
The Site Committee.
2 State and local health and safety regulations.
A 35-acre site for this building was purchased by the
Town in 1957 on the basis of options arranged previously The 3 Effective use of the site.
land is located near the Fiske School in the area between 4. A permanent and attractive building without frills
Adams Street and Burlington Street as indicated on the small and extras.
map on the back cover About 4 acres in the southwest corner 5 Efficient and controllable pupil traffic.
is an attractive wooded knoll while 9 acres in the northeast
corner is low swampy land. The balance is a relatively flat 6. Isolation of noisy areas.
field, well adapted for both the building and the play fields. 7 Provision for minimum maintenance.
A trunk sewer runs through the middle of the site While 8. Flexibility for future program changes.
this has caused some problems in the location of the build-
ings, it permits substantial savings since otherwise a long 9 Lowest practical cost.
run of connecting sewer or extensive filter beds would have The Committee believes that the proposed plan will
been required. provide the Town with an attractive and economical facility
The Timing
In spite of the utmost effort on the part of the Committee
and its Architect it was not possible to complete the work
properly in time to have final bids ready for the Town Meeting
in March. It was felt that it would be better not to risk short
cuts or ask for an appropriation on the basis of an estimate
The present plan is to open bids late in April and call a
special Town Meeting about a week later to request an appro-
priation based on the lowest responsible bid.
Barring any serious delays because of strikes or unusual
weather, there is enough time to complete construction by
September of 1959 providing ground can be broken by
early June
EDUCATIONAL DATA BUILDING DESCRIPTION
Pupil Capacity 900 Structural System
Non-Specialized Classrooms 20 Reinforced Concrete Grid Flat Slab
Special Classrooms 15 Curtain Walls
Homemaking 2 Arts and Crafts 2 Roof
General Science 5 Planning 1 Structure Reinforced Concrete
Music 2 Shop 3 Poured Gypsum
Special Facilities Surface Four ply Tar and Gravel
P Windows
Cafeteria 350 Health Room Aluminum Projected-out Vents
Kitchen Teachers Room
Library Offices Exterior Walls
Auditorium 500 Remedial Facing Brick or Concrete
Activity Rooms Audio-Visual Backing Masonry Block
Guidance Rooms Storage Rooms Partitions
Masonry Block Cinder or Concrete
Floors
Concrete Framed and on fill
Lighting
Teaching Areas Fluorescent
CONSTRUCTION COSTS Other Areas Incandescent
Estimated Costs Finish
Contract Price $1,830,000 00 Walls Paint, stain, glazed tile
Per Square Foot $ 19 31 Floors Vinyl-Asbestos tile
Per Pupil $ 2,033 00 Ceilings Acoustic tile, Paint
Heating
Additional Costs Low Pressure Steam Oil Fired
Architect-Engineer $ 115,000 00 Sanitary System
Equipment $ 200,000 00 Public Disposal Sewer
Contingency $ 75,000 00 Water Supply
Total Estimated Cost $2,220,000 00 Public Town Water System
a00
1, ---- c‘• 3 )
7za •z \,)
I m `/
/' OOK RU N
\\
ATMOfCNE
O
T..
G F.L4•i1
ok
1/4cir---0--
J `,ys4,P
� TLOCK ��'
__._,..___
Ra, F15KE ��,
�//M�': 0„
�•
) I-4 0--poi/
SCHOOL_
vie lik
PARK ijJ
loilAriglio
in il
ill
,N, 4,..:. .0,iy, , .. ' _......iiii.....
. ars'' t=9 O ' WOODLAND RD
, 6 icc
A „0"4.4,,
��
AVE' MERtAMY ---w "9` r *:;$ 11 I �; Q
N,to ' vV
RD.
` rS`AkE aRgWk R. �_HCk� GO CW ✓ R� i04) S ` r / ��l4• 64" /4.k
, \i . _ ,, ryn
4GOQ AVE• �qO .
4.
•
4.
/ ss
3
? P� vP ti.
'QSE •• • ; •i )1.0"
„ Oypus. BOG A �1A040111641- 14 4.14' WK3, �(LAM G•,r'' .�t j a
us
cr
41.7f
`t. /BEDFORD
_ r r em°% >. 4. �,.,_
o 461
s
r
Sec 34 66,P L &R
ANNUAL TOWN MEETING TO BE HELD U S POSTAGE
PAID
IN MARCH, 1958 Lexington, Mass.
Permit No. 3011