HomeMy WebLinkAbout2025-03-19-REC-min-attRECREATION COMMITTEE TOWN OF LEXINGTON, MASSACHUSETTS v5_MaRN,\. x N O \1 APRIL 19'" �xlNc�rt�� ANNUAL REPORT ON RECREATION CAPITAL PROJECTS SUBMITTED MARCH 2025 RECREATION COMMITTEE MEMBERS RICK DEANGELIS (CHAIR) 9 CHRISTIAN BOUTWELL (VICE CHAIR CLAIRE SHETH 0 CARL FANTASIA • WEIWEI LI • RENEN BASSIK 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT TABLE OF CONTENTS Foreword............................................................................................................................................ 1 FY2026 Recreation Capital Projects Summary Statement................................................................ 3 FY2026 Recreation Capital Project Proposals Center Complex Playground Replacement (2025 ATM Article 10g) ...................................... 6 Old Harrington/Maple St Athletic Fields (2025 ATM Article 10h) ......................................... 7 Lincoln Park Field #3 Replacement (2025 ATM Article 10i) .................................................. 10 Pine Meadows GC Equipment (2025 ATM Article 11)........................................................... 11 Lincon Park Parking Lot (2025 ATM Article 12k)...................................................................12 FY2026 — FY2030 Recreation Capital Projects Summary Table ..................................................... 13 FY2026 — FY2030 Recreation Capital Projects Summary List ........................................................ 15 FY202— - FY2025 Recreation Capital Project Updates FY2025Appropriations.............................................................................................................16 FY2024Appropriations.............................................................................................................21 FY2023Appropriations.............................................................................................................24 FY2022Appropriations.............................................................................................................27 Appendix A: Athletic Fields Major Capital Projects 2025 — 2045 ....................................................29 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT FOREWORD Welcome to the Recreation Committee Capital Projects Report. The official charge of the Recreation Committee does not require submission of an annual report to Town Meeting, but we believe that such a report can provide useful information to the community regarding the numerous capital assets that support recreation in Lexington and the capital expenses associated with their ongoing maintenance. The Town of Lexington has developed an extensive recreation infrastructure comprising 62 athletic fields and hard courts, 11 playgrounds, 2 aquatics facilities, a track, and a nine hole golf course. In addition to routine annual maintenance, all of these assets require periodic, larger scale renovation and/or replacement projects in order to maintain their existing level of quality and playability. Indeed, the bulk of recreation -related capital expenditures fund just such projects, and the professional staff of the Recreation and Community Programs Department have developed robust long-range forecasting of the approximate need for such projects (see for example Appendix A). As projects draw near, the Recreation Committee and the Recreation and Community Programs Department work together to fit them into our 5 -year capital plan, which is then further refined in collaboration with the Town Manager and Finance Department, the Select Board, the Appropriation Committee, and the Capital Expenditures Committee during the annual Town budgeting process. The Recreation Committee believes that the Town faces two critical challenges to the ongoing maintenance of recreation capital assets and the provision of recreation fields and facilities at the current levels of availability and quality: 1) the impact of the Lexington High School building project and 2) the reliance of the Town on Community Preservation Act (CPA) funds for the completion of recreation -related capital projects. The impact of the Lexington High School construction project on the availability of existing fields will pose a challenge in the coming years. That said, the Recreation Committee appreciates the effort of the School Building Committee (SBC) and project team over the past year to understand and mitigate, to the extent possible, the impact of the LHS project on the athletic fields at the Center Recreation Complex including the prior exclusion of Center Field 92 (varsity softball) from 1 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT the construction zone and the current effort to also avoid impacting Center Field #1 (varsity baseball). The protection of the Center # 1 and Center #2 fields, and thus also the Center #7 overlay field, will support the LHS softball and baseball programs, the Recreation and Community Programs Department's summer programing, and numerous other users of those fields. Nonetheless, there will still be substantial challenges to our field user groups resulting from the loss of the Crumb football field, Fitzgerald little league field, JV baseball field, cricket overlay field, and Worthen Road practice field, and we continue to pursue multiple, collaborative approaches to address those challenges. Additionally, the Committee supports the intention of the SBC and project team to replicate on site any fields that are lost to the new building footprint in a community -friendly design and configuration. That said, the (re)development of the lost fields will be among the very last elements of a lengthy and complex construction process, and the Recreation Committee is concerned that any budget overruns, a non -zero likelihood in a project of this magnitude, will naturally accumulate to the final steps of the project, and could thereby delay and/or reduce the scope of the field reconstruction phase of the LHS school building project. We will look forward to continued collaboration with the SBC and project team throughout the project to smoothly navigate the redevelopment of lost fields. In recent practice, the Town has largely relied on CPA funding to complete the majority of recreation -related capital projects with the typical exception of capital projects at the Pine Meadows Golf Course (funded from the Recreation Enterprise Fund) or capital project expenses directly associated with artificial turf (funded from the General Fund). Although this practice has worked quite well to produce our high-quality recreational infrastructure, the Recreation Committee believes the combination of the annual uncertainty regarding the Commonwealth's contribution into Lexington's CPA fund and the growing community interest in greater CPA -based funding of affordable housing initiatives raises the possibility that the prior practice may not be sufficient to sustain the ongoing capital costs of Lexington's recreation assets. Our intention raising this point here is to catalyze conversation and discussion with the Select Board, Town Manager's Office and Finance Department, Capital Expenditures Committee, and Appropriation Committee, among others, regarding what, if any, changes in funding policy and/or practice may be necessary to support Lexington's highly valued, community -wide, recreational assets into the future. 2 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT Recreation Capital Summary Statement - FY2026 The intent of this summary is to provide additional context for the Fiscal Year 2026 Recreation & Community Programs Capital Program Submission that is submitted by the Recreation and Community Programs Department as part of the Town's annual CIP review process and includes not only capital projects proposed for FY2026 appropriation, but also capital projects anticipated for an additional 4 years, i.e., a 5 -year capital plan. The Town has enjoyed great success over the years in developing its recreation infrastructure, and ongoing capital investment to maintain and/or replace it is critical to continuing to provide existing recreation opportunities to our residents. As a result, most Recreation capital expenses are "level - service" projects, i.e., those necessary to maintain the recreation, leisure activities, play, sports, and physical education as they are currently being enjoyed by residents. Such projects most commonly comprise end -of -life renovations and replacements and/or updates to meet current recreation industry best practices. The professional staff of the Recreation and Community Programs Department are to be commended for the work they've done over the past several years to track and prepare for the end -of -life renovation and/or replacement projects at our parks and playgrounds, playing fields and courts, and at the Pine Meadows Golf Course. In considering potential capital projects, the Recreation Committee and the leadership of the Recreation and Community Programs Department work together closely to balance multiple, at times competing, factors including: • fulfilling the Recreation Committee charge of "...administering, expanding, and promoting recreation, leisure activities, play, sports and physical education."; • maintaining the level of facilities and services as currently being provided to the community; • protecting and sustaining the fiscal health of the Recreation Enterprise Fund; • responding to community needs including as identified in the Recreation Facilities and ADA Compliance Study (2017), the 2020 Community Needs Assessment, the Comprehensive Study of Athletic and Outdoor Recreation Facilities (2021-2022, by members of the Sports Advisory Council, and by direct resident communication; • enhancing the facilities and services provided to the community; • aligning with the goals and priorities of other Town boards and committees including but not limited to the Select Board, the Conservation Commission, and the Lincoln Park Subcommittee; • and honoring Town bylaws and Town Meeting resolutions. Capital Impact of/Response to the LHS Project It should come as no surprise that in addition to the above factors, the Lexington High School building project is exerting a substantial influence on recreation -related capital planning. The 3 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT "Bloom" massing option that was unanimously selected by the School Building Committee to advance in the project process will result in the project -long closure of the Fitzgerald Little League Field, the Crumb Football Field, the JV baseball field, the overlay cricket field, and the Worthen Road practice field until their eventual relocation and reopening as the final phase of project completion after 5-6 years. In a noteworthy recent and very welcome development, it is our understanding that in the most recent project planning the Center 1 field (varsity baseball). Center 2 field (varsity softball), and Center 7 overlay field (Center 1 and Center 2 outfields) will no longer be impacted at all by the Bloom design for the LHS project. Nonetheless, the loss of fields during the LHS project will exacerbate the existing deficit in field availability that is well-known among the field user groups and was quantified and documented in the aforementioned Comprehensive Study of Athletic and Outdoor Recreation Facilities (2021- 2022), and we anticipate that the operations of essentially all current field users in Lexington will be substantially impacted by LHS -related field closures for multiple years. Recreation began to take steps to mitigate the anticipated impact of a LHS project on field availability in the fall of 2022 by revising the FY2024-FY2028 5 -year capital plan to reflect the: 1) one year acceleration of the schedule of end -of -life renovations of the three fields at Lincoln Park to FY2024, FY2025, and FY2026 so that all are completed and ready for another 8-10 years of use prior to initiation of the LHS project; 2) installation of athletic lighting to Lincoln Park Field 1 and Field 3 in FY2024 (Field 2 already has lighting) to maximize the availability of those fields for use; 3) development of new athletic fields at the Old Harrington site in FY2026 so that the new fields can be completed and ready for use prior to initiation of the LHS project. Items 1 and 2 are on schedule for timely completion with the renovation of Lincoln Field 1 and the installation of athletic lighting at Field 1 and Field 3 completed in November 2024, funds appropriated at ATM 2024 for the renovation of Lincoln Field 2 and the project going out to bid imminently, and the appropriation request for the renovation of Lincoln Field 3 coming before this 2025 ATM. Recreation remains hopeful that this 3 -year replacement cycle for the fields at Lincoln Park will be completed by the end of 2026. The pursuit of Item 3, the construction of new athletic fields on the site of the Old Harrington building, and its completion prior to closure of fields for the LHS project is less certain. The challenges include difficulty in accelerating the pacing of the design process and the evolving funding environment for recreation -related capital projects as the demands on Community Preservation Act (CPA) funds have grown. 4 2025 RECREATION COMMITTEE CAPITAL PROJECTs REPORT Operational Impact of LHS Project -related Field Closures As mentioned above, the recent development that Center 1, the varsity baseball field, will remain online for the duration of a Bloom project is welcome news as that is the only field in town suitable for varsity -level baseball. However, the other field closures will nonetheless cause significant disruption to field users. The Recreation and Community Programs Department is actively engaged in communication and outreach with the Lexington Public Schools (LPS) Athletics Department and the Sports Advisory Council, comprising representatives from the organizations that are field permit holders, in an effort to quantify likely field time deficits, identify critical core needs, seek opportunities for compromise, and explore alternative field sites in neighboring communities. The Recreation and Committee Programs Department is also modeling the potential impacts on Departmental programming, e.g., summer programs, both in terms of how loss of fields may impact what programs can be offered to Lexington residents and also how such loss of programming will impact the revenue of the Recreation Enterprise Fund from which the Department's operating expenses are paid. There is ample reason for concern about the financial health of the Enterprise Fund during the LHS project. FY2026 Capital Project Proposals For FY2026, Recreation proposes 4 level -service capital projects that are necessary to maintain existing recreation assets as they are currently provided to the community and 1 enhancement capital project that represent an addition to the recreation assets in Lexington. Proposed level -service capital projects: • Pine Meadows GC — equip. replacement • Center Rec Playground replacement • Lincoln Park Field #3 replacement • Lincoln Park parking lot replacementD&E Cost: $70,000 Funding: Rec EF Cost: $1,490,000 Funding: CPA Cost: $1,950,000 Funding: CPA/General Cost: $375,000 Funding: General Fund Proposed enhancement capital projects: • Old Harrington Athletic Fields D&E Cost: $1,197,904 Funding: CPA incl. potential future artificial turf costs Cost: $2, 000, 000 Funding: General Fund These FY2026 appropriation requests for capital recreation projects are described in more detail in the following pages. 5 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT ARTICLE I OG: CENTER COMPLEX PLAYGROUND REPLACEMENT The Recreation Committee, in collaboration with the Recreation and Community Programs Department, requests an appropriation of $1,490,000 in FY2026 from Community Preservation Act (CPA) funds to update and replace the playground equipment and install new safety surfacing at the Center Playground at the Center Recreation Complex. The playground at the Center Recreation Complex, aka the Center Playground, is one of two "community" playgrounds in Lexington, i.e., serving the entire community, and sees heavy use. The playground was last replaced in 2006 with an estimated lifespan of 15-20 years, and the play equipment is beginning to fail and the engineered wood fiber surface material is no longer providing sufficient universal access for residents with mobility challenges. The playgrounds in Lexington are inspected 3-4 times per year by Recreation and DPW staff that are certified by the National Recreation and Park Association (NRPA) as Playground Safety Inspectors. In recent years, inspections of the Center Playground have identified approximately $100042000 per year of repairs necessary to maintain safe operation. In 2020, all of the playgrounds in Lexington were subject to an external audit by Innovative Playground Services, Inc. The 2020 audit identified the following concerns at the Center Playground: • play elements on the ages 2-5 and ages 5-12 structures are worn and pose pinch hazards; • the stair side rails to the 80" high platform of the 5-12 structure does not have currently required protective barriers; • the swing equipment is heavily worn. This project includes replacing the existing equipment with new, universally accessible play structures, installing poured -in-place safety surfacing, and improving ADA -compliant access to the site. Additionally, an independent third -party inspection will be conducted following project completion to ensure compliance with safety regulations. A FY2026 appropriation for this project will allow its completion prior to initiation of the LHS building project, reducing potential issues of timing and/or staging with that project. The current plan for the "Bloom" design that was selected by the School Building Committee for advancement in the project process will not impact the Center Playground or access to it. The $1,490,000 appropriation request comprises the following estimated components: Design and Engineering $5,000 Construction $512,000 Equipment $873,000 Contingency $100,000 Total $1,490,000 0 2025 RECREATION COMMITTEE CAPITAL PROJECTs REPORT ARTICLE I OH: OLD HARRINGTON/MAPLE ST ATHLETIC FIELDS *Note 1: The Old Harrington Athletic Field Project, and the appropriation request in this article, is contingent upon the passage of 2025 Annual Town Meeting Article 16e, an appropriation for the demolition of the Old Harrington building. * *Note 2: At the time of submission of this report, the project design remains in development and this article remains the topic of active and ongoing evaluation and discussion among Recreation, the Town Manager's Office/Finance Department, the Select Board, and others. The appropriation request is subject to change. The Recreation Committee, in collaboration with the Recreation and Community Programs Department, requests an appropriation of $3,197,904 in FY2026 toward two elements of a project to construct new athletic fields at 146 Maple Street, the current location of the Lexington Public Schools (LPS) Central Office Building: 1) $1,197,904 from CPA funds for the completion of construction documents, and 2) $2,000,000 from the General Fund to be held in contingency if the project design includes artificial turf fields. The 2021-2022 Comprehensive Study of Athletic & Outdoor Recreation Facilities identified an annual deficit of 6,100 hours between field availability and field demand. Specifically, the Town has a shortage equivalent to one (1) large rectangle, multi-purpose field and fourteen (14) small rectangle, multi-purpose fields. This project aims to reduce this deficiency by constructing a rectangle field facility at 146 Maple St that will ideally accommodate concurrent play on two full-size, rectangle fields, multiple concurrent small fields (created by dual -lining and sub -division of the frill -sized fields), and a cricket field overlay. The proposed development of these fields addresses two recreational needs in Lexington: 1. the long-standing, existing deficiency in athletic field availability in town, as documented and quantified by Weston and Sampson in the aforementioned analysis of fields in 2021- 2022, and experienced and noted by to all athletic field users, including the organizations represented on the Sports Advisory Council; 2. the temporary but lengthy (5+ years) additional loss of field space that will occur during the LHS building project. To offset the impacts of point 2 above, Recreation has pursued an aggressive timeline to bring new athletic fields online at Old Harrington/Maple St as close as possible to the time of the anticipated loss of fields at the Center Recreation Complex. 7 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT' The original intent for this project was to follow what has become something of a standard two- step procedure for recreation -related projects: 1) bring an appropriation request to Town Meeting to fund the development of a project design and 2) bring an appropriation request to Town Meeting to fiend the construction of the project design created in step 1. We are now pursuing a 3 -step process for this project: 1) seek appropriation for project design (completed; 2024 STM), 2) seek appropriation to complete construction documents (pending; 2025 ATM), 3) seek appropriation for construction costs (2026 ATM). Following is a brief description of each step including how the project plan evolved from a 2 -step to a 3 -step process. Step 1 — Project Design Funding: The first step, development of a project design, began at 2024 STM with the approval of Recreation's request for an appropriation to develop the project design. At the time of the submission of this report, the design process is ongoing and includes evaluation of natural grass, artificial turf, and hybrid options for field construction and consideration of the installation of athletic lighting. The design process involves soliciting input and feedback from user groups, such as the Lexington Public Schools and our community athletics programs, Town departments, boards, and committees, and from the community at large. To this end, one project - specific public meeting was held on March 11, 2025, and a second will occur in late March/early April. As of the writing of this report, the Recreation Committee intends to vote on a final project design at its April 8, 2025 meeting to be presented to 2025 Annual Town Meeting as part of Step 2 (see below). Step 2 — Construction Document Funding: Our original intention in the fall of 2024, consistent with prior practice for recreation capital projects, was to seek combined design and construction fundings in a single step at 2025 ATM. During the Town budgeting process in the fall of 2024, the original appropriation request that was proposed for FY2026 was for a total of $6,180,000 ($4,180,000 from Community Preservation Act (CPA) funds and $2,000,000 from the General Fund/tax levy). This appropriation request was proposed because although the final project design ivouldn't be knoivn until the spring 2025, the request was sufficient to cover the entirety of the highest potential construction costs that would arise if the final project design was for artificial turf fields with lights and was made with the understanding that if the design process yielded a lower cost option, any excess appropriated funds would simply be returned to their source. Consistent with past practice, e.g. Lincoln Field playing surface replacement projects, the $2,000,000 appropriation requested from general fund/tax levy represented the estimated costs of artificial turf that would not be fundable by CPA, again to be available if the selected design included it. However, in the course of the Community Preservation Committee (CPC)'s fall 2024 fund allocation deliberation process, it became clear that a majority of the CPC supported a distribution of available CPA funds that would result in insufficient funds to support the Recreation appropriation request for $4,180,000. Consequently, the Recreation Committee voted to reduce the request for CPA funds for the Old Harrington Athletic Field project from $4,180,000 to 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT $1,197,904, an amount equal to the available CPA funds, which was subsequently approved by the CPC. Additionally, as mentioned above, per prior practice the Town only appropriates from the General Fund for recreation -related capital projects if it is necessary to cover the costs of artificial turf materials that are ineligible for CPA funding. Therefore, the current appropriation request of $2,000,000 from the General Fund will be spent only if the final project design is for artificial turf fields. In light of the limited CPA funding available for this project, it was no longer possible to pursue the 2 -step process that has been something of the norm for recreation -related capital projects. As a result, we are now pursuing the funding for the project in a 3 -step process, ivith this 2025 ATM Article IOh comprising Step 2, an appropriation for the completion of construction documents. Step 3 — Construction Funding: If 2025 ATM passes Article 10h, the construction document process will be completed during calendar year 2025, and Recreation will seek to bring to 2026 ATM an appropriation request for the construction costs to complete the project. If the funding process proceeds as outlined above, Recreation estimates the following project timeline: • 2026 ATM: appropriation request for construction funding; if approved: • 2026 spring/early summer: project out to bid • 2026 fall/early winter: project starts • 2027 fall: project complete and fields open (IF artificial turf) • 2028 spring: project complete and fields open (IF grass) E 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT ARTICLE 101: LINCOLN PARK FIELD #3 REPLACEMENT The Recreation Committee, in collaboration with the Recreation and Community Programs Department, requests an appropriation of $1,950,000 in FY2026 ($860,000 from Community Preservation Act (CPA) funds and $1,090,000 from the General Fund) to conduct an end -of -life synthetic turf replacement and reconstruction of Lincoln Park Field #3. This split funding approach has been reviewed and approved by Town Finance and Town Counsel and has been used to successfully complete prior synthetic turf field projects in Lexington. Lincoln Park Field #3 was last renovated in 2016 with an estimated lifespan of 8-10 years, and this end -of -life replacement project has been on the Recreation 5 -year Capital Plan since 2021.Of note, this project represents the culmination of this three year end -of -life replacement cycle. The project includes a professional evaluation to determine whether any of the subsurface/base can be reused or if a full replacement is required to ensure the safe function of the field. The project scope includes the removal of the existing surface turf "carpet," laser grading of the subsurface, inspection and repair (as needed) of the drainage system, installation of a new shock pad, replacement/recycling of the infill material, replacement of the surface turf, replacement of the wooden anchors with concrete and edging around the immediate field perimeter, and restoration of the walkways and surrounding areas of the field. In early 2023, Recreation convened the "Athletic Playing Surface Working Group" to evaluate the pros and cons of various field material options and to identify opportunities to reduce or eliminate the use of undesirable components of athletic fields. The Working Group comprises professional town staff from the Recreation and Community Programs, Health, Sustainability, Conservation, and Public Works Departments and representatives from the Board of Health, Sustainable Lexington Committee, and Recreation Committee. The ongoing effort of the Working Group has resulted in the adoption of pine -based infill material instead of crumb rubber, careful evaluation and testing of the surface carpet materials, and continued improvement in the reuse of removed materials and ensuring that artificial materials that can't be reused are not incinerated. This approach has been followed for Field #1 and Field 42 and will also be followed for Field 43. The $1,950,000 appropriation request comprises the following estimated components: Design and Engineering $89,500 Project Management $51,500 Construction $1,644,000 Equipment $0 Contingency $165,000 Total S1,950,000 CPA Fund $860,000 General Fund $1,090,000 10 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT ARTICLE 11: PINE MEADOWS GOLF COURSE - EQUIPMENT REPLACEMENT PROGRAM The Recreation Committee, in collaboration with the Recreation and Community Programs Department, requests an appropriation of $70,000 in FY2025 from the Recreation Enterprise Fund as part of the ongoing Pine Meadows Golf Course Grounds Equipment Capital Program. The appropriation will be used to purchase a greens mower and a utility vehicle to replace the existing machines that were bought in 2009 and 2006 with a 10 and 13 year expected lifespan, respectively. Prior to each end -of -life equipment replacement, we collaborate with the Department of Public Works to evaluate the potential for replacing grounds maintenance equipment with electric - powered options. At this time, there are not feasible electric alternatives for these pieces of equipment. 11 2025 RECREATION COMMITTEE CAPITAL. PROJECTS REPORT ARTICLE 12K: LINCOLN PARK PARKING LOT DESIGN The Recreation Committee, in collaboration with the Recreation and Community Programs Department and the Department of Public Works, requests an appropriation of $375,000 for the design and engineering (D&E) services for the reconstruction of parking lot at Lincoln Park. Parking and traffic flow at the Lincoln Park parking lot has been problematic for many years due to the size of the spaces and the organization of the entry and exit points. The Transportation Safety Group (TSG) has assessed the parking lot and agrees that improvements are needed to improve the flow of traffic and reduce safety concerns for park users. The components of the park including the five athletic fields, the community playground, and the fitness stations and nature paths are heavily used year round, from dawn to dusk, and in the evenings with athletic lighting. The project goals will also include the design of a safe multi -use path out to Lincoln Street, which was a need highlighted in the Town -wide Bicycle and Pedestrian Plan of 2024. 12 2025 RECREATION COTVINIITTEE CAPITAL PROJECTS REPORT FY2026 - FY2030 RECREATION CAPITAL PROJECTS SUMMARY TABLE' Capital Program FY2026 FY2027 FY2028 FY2029 FY2030 Pine Meadows GC Grounds Maintenance' $0 $130,0003 $89,0004 $105,0005 $0 Pine Meadows GC Grounds Equipment' $70,0006 $30,000' $0 $80,000$ $0 Playgrounds $0 $0 $0 Center Playground $1,490,000 Lincoln Park Playground' $1,465,000 TBD Athletic Fields" Lincoln Park Field #3 $1,950,00011 Old Harrington Fields 12 $3,197,90413 $TBD Lincoln Park Softball Field $350,000 Garfield Field $250,000 Sutherland Field $350,000 Franklin Field $350,000 Center Rec Complex — Center Track Field $1,200,000 Center Rec Complex - Track $390,000 Hard Courts $0 $0 $0 $0 Pickleball14 $2,025,000 Aquatics $0 $0 Old Reservoir $125,000 Mabee Town Pool $50,00015 Parks and Park Environs $0 Lincoln Park Boardwalks $830,000 Lincoln Park Parking Lot16 $375,000 TBD Park Amenities" $50,000 $50,000 I'S 0 FE: Project timing subject to the availability of funds. Project costs are estimates. 'Pine Meadows GC Grounds Maintenance and Grounds Equipment capital expenses are typically funded from the Recreation Enterprise Fund. 32°d green & bunker/3" airway 4practice green/ I" tee 53" hole bunker & irrigation 6greens mower & utility cart 'greens aerator & sprayer 'triflex mower 9 project timing dependent on coordination with the Lincoln Park Parking Lot project 10All Athletic Fields capital projects shown are end -of -life replacements/renovations with the exception of the Old Harrington Fields project. 13 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT � � S 1,235,000 CPA Fund - S715,000 General Fund 12 Old Harrington Athletic Fields project dependent on DPF project to demolish Old Harrington building (Article 16e) 13Decreased from original S6,180,000 request to cover D&E and maximal construction costs as a result of CPA funding shortfall. "Recreation would like to meet the high community demand for dedicated pickleball courts, but no site has been identified for new court construction. "Lockers and security renovation. 16Replacement of the parking lot at Lincoln Park is a collaboration with DPW and DPF. "Funding to cover the cost of the end -of -life repair/replacement of park amenities such as benches, fencing, water fountains, etc. 14 2025 RECREATION COMMITTEE CAPITAL. PROJECTS REPORT FY2026-FY2030 RECREATION CAPITAL PROJECTS SUMMARY LIST NB: Project timing subject to availability of funds. Project costs are estimates. FY2026 • Center Recreation Complex playground replacement: $1,490,000 • Lincoln Park Field #3 replacement: $1,950,000 • Lincoln Park Parking Lot (*with DPW) Design and Engineering: $375,000 • Old Harrington Athletics Fields: $3,197,904 • Pine Meadows GC replacement of equipment: $70,000 (Rec EF) FY2027 • Old Harrington Athletic Fields construction: TBD • Lincoln Park playground replacement: est $1,465,000 • Lincoln Park boardwalk system replacement: est $830,000 • Lincoln Park softball field renovation: est $350,000 • Lincoln Park parking lot construction (*with DPW): TBD • Pine Meadows GC replacement of equipment: est $30,000 (Rec EF) • Pine Meadows GC course renovations: est $130,000 (Rec EF) FY2028 • Athletic Fields — Garfield field renovation: est $250,000 • Aquatics — Old Reservoir dredging: est $125,000 • Site amenities: $50,000 • Pine Meadows GC course renovations: est $89,000 (Rec EF) FY2029 • Athletic Fields — Sutherland field renovation: est $350,000 • Pine Meadows GC replacement of equipment: est $80,000 (Rec EF) • Pine Meadows GC course renovations: est $105,000 (Rec EF) FY2030 • Center Rec Complex center track field replacement: est $1,200,000 • Center Rec Complex track resurfacing: est $390,000 • Athletic Fields — Franklin field renovation: est $350,000 • Aquatics — Mabee Pool lockers and security system: est $50,000 • Hardcourts — pickleball court construction: est $2,025,000 (*site not yet identified) • Site Amenities: est $50,000 15 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT RECREATION CAPITAL PROJECT UPDATES Y2025 APPROPRIATION UPDATES Athletic Fields — Bowman Field End -of -life Reconstruction • 2024 ATM Article 10c • FY2025 Appropriation: $545,000 • Funding Source: CPA • Current Status: Project out to bid • Target Project Start: TBD • Target Project Completion: TBD • Project Lifespan Upon Completion: 12-15 years The 2024 Annual Town Meeting appropriated $545,000 of FY2025 Community Preservation Act (CPA) funds for the reconstruction of Bowman Field as part of the ongoing Athletic Fields Capital Program. The field was last renovated in 2008 with an expected lifecycle of approximately 15 years. Over that time, the field has experienced the normal deterioration associated with use exacerbated by poor drainage at the site. Currently, the home plate area is higher than the pitcher mound, the backstop and player areas are deficient, large portions of the field are frequently unplayable as the result of standing water, ADA compliant access is poor, and the current lack of irrigation precludes adequate maintenance of the natural grass surface. This project comprises complete reconstruction of the field including laser grading and drainage improvement, installation of a new irrigation system and new natural grass, and replacement of the backstop, signage, and benches. Additionally, the project will improve the accessibility of the site in accordance with the Recreation Facilities and ADA Compliance Study (2017)1 and in collaboration with the Commission on Disabilities. The project will also include improvements in the access to the Dunback Meadow Conservation Area in collaboration with the Conservation Department and Commission. https://ww�,v.lexingtonma.gov/DocumentCenterNiew/5182/Comprehensive-Study-of-Athletic-and-Outdoor- Recreation-Facilities-2021-2022---Final-Report?bidId= 16 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT Lincoln Park —Fitness Stations • 2024 ATM Article IOd • FY2025 Appropriation: $160,000 • Funding Source: CPA • Current Status: Design phase. • Target Project Start: TBD • Target Project Completion: 2025 • Project Lifespan Upon Completion: 15-20 years The 2024 Annual Town Meeting appropriated $160,000 in FY2025 from Community Preservation Act (CPA) funds to replace the exercise equipment comprising the fifteen fitness stations along the Teresa and Roberta Lee Fitness/Nature Path at Lincoln Park. This project will replace the equipment with modern equivalents with an expected life cycle of 20 years. The replacement exercise equipment will be similar in nature to what is installed outside the Community Center and will be specifically chosen to be fulfilling for residents of wide ranging abilities. The completion of this project will provide a notable increase in the outdoor, "free play", fitness opportunities for residents that may not derive benefit from other athletic resources. The $160,000 appropriation request to complete this project was based on cost estimates provided in August 2023 by vendors for updated, in-kind, replacement of existing equipment. 17 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT Hard Courts — Valley Courts End -of -Life Reconstruction • 2024 ATM Article l0e • FY2025 Appropriation: $492,000 • Funding Source: CPA • Current Status: Project out to bid • Target Project Start: Spring 2025 • Target Project Completion: Summer 2025 • Project Lifespan Upon Completion: 10-15 years The 2024 Annual Town Meeting appropriated $492,000 in FY2025 from Community Preservation Act (CPA) funds to reconstruct the Valley Courts. The Valley Courts is a dual use facility that is lined to provide use as 2 regulation tennis courts or 4 pickleball courts in accordance with dual sport lining guidelines of the United States Tennis Association (LISTA). The asphalt base layer of the Valley Courts was constructed in 2008 with an estimated lifespan of approximately 10-15 years. In 2021, the courts were resurfaced to address superficial cracking with an estimated lifespan of 3-5 years. In 2023, the annual safety inspection revealed additional surface cracking, and it was subsequently determined that the base asphalt substrate (c.2008) had reached its end -of -life. The original replacement project design called for installation of post -tension concrete courts, expanded parking (from 4 spaces to 7), and the addition of an on-site storage shed. However, site consultation with the Conservation Department revealed the need for a stormwater management system, which resulted in project cost estimates that were more than $250,000 over the appropriated funds. After discussion with the Recreation and Community Programs Dept staff and the project architect, in recognition of the likelihood that post -tension concrete construction bids will come in well over budget, the Recreation Committee voted unanimously to send the project out to bid for post -tension concrete but with the inclusion of asphalt construction and parking as alternate options with the intent to pursue asphalt reconstruction if that represents the in budget option. 18 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT Lincoln Park — Field #2 Reconstruction • 2024 ATM Article IOe • FY2025 Appropriation: $1,810,000 • Funding Source: CPA ($492,000) and General Fund ($665,000) • Current Status: Out to bid • Target Project Start: June 2025 (at conclusion of LHS Athletics spring season) • Target Project Completion: September 2025 • Project Lifespan Upon Completion: 8-10 years The 2024 Annual Town Meeting appropriated $1,810,000 in FY2025 from CPA funds ($1,145,000) and from the General Fund ($665,000) to conduct an end -of -life replacement of the synthetic turf system at Lincoln Park Field #2. Lincoln Park Field #2 was last renovated in 2015 with an estimated lifespan of 10 years, and the project has been on the Recreation 5 -year Capital Plan since 2021. This project represents the second year of the three year end -of -life replacement cycle for the Lincoln Park Athletic Fields; Field #1 2024, Field #2 2025, Field #3 targeted for 2026. In 2023, the Recreation Committee and Recreation and Community Programs Department convened the Field Surfaces Working Group (FSWG) to evaluate the pros and cons of various field material options and provide advice to Recreation on opportunities to address community member concerns about the materials used in artificial turf fields while continuing to meet user group needs and the athletic field demands in the Town. The FSWG comprises professional town staff from Recreation and Community Programs, Health, Sustainability, Conservation, and Public Works as well as representatives from the Board of Health, Sustainable Lexington Committee, and Recreation Committee. The work of the FSWG contributed to improvements in the Field #1 replacement project and has continued to inform the bid specifications for the Field #2 project including: • the use of pine -based infill material instead of crumb rubber; • improved bid specifications for the surface carpet materials including expanded testing for organofluorine compounds; • improved bid specifications for the disposition of materials removed during the renovation including assurance that such materials are not incinerated. 19 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT Pine Meadows Golf Club Grounds Maintenance — Fuel Area Reconstruction • 2024 ATM Article 11 • FY2025 Appropriation: $110,000 • Funding Source: Recreation Enterprise Fund • Current Status: Completed August 2024. The 2024 Annual Town Meeting appropriated $110,000 from the Recreation Enterprise Fund for the reconstruction/replacement of the fueling area used for the grounds maintenance equipment and renovation of the practice area. The `'fuel bays" are located in proximity to the clubhouse and parking lot and provide a safe and secure diesel and gasoline storage and refueling area. The fuel bays were last replaced in 2002 and deteriorated through 20+ years of regular usage and weathering and need to be replaced. In keeping with the goals of the Town Meeting Climate Emergency Resolution (STM 2020-2), we explored the potential to eliminate the need for such fuel bays by moving to electric powered grounds maintenance equipment, but at this time there are not viable electric alternatives for these types of specialized commercial -grade mowing and maintenance equipment. Recreation will continue to collaborate with the Department of Public Works to evaluate alternative equipment as it comes to market. Of note, the golf carts at the course are electric; the fuel bays are for the grounds maintenance equipment only. 20 2025 RECREATION COMMITTEE CAPITAL, PROJECTS REPORT FY2024 APPROPRIATION UPDATES Lincoln Park — Field #1 Renovation and Field #1 & #3 Athletic Lighting Installation • FY2024 Appropriation: $3,391,500 [2023 ATM Article l0i] • Funding Source: CPA ($2,475,000) and cash capital/tax levy ($916,500) • Current Status: Completed • Project Start: June 2024 • Project Completion: November 2024 (punch list completion Spring 2025) • Estimated Lifespan — Field #1: 8-10 years • Estimated Lifespan — Athletic Lights: 15-20 years End -of -life renovation of Field 41 and installation of athletic lighting at Field #1 and Field #3. Athletic Fields — Bridge Field End -of -Life Renovation • FY2024 Appropriation: $285,000 [2023 ATM Article 10j] • Funding Source: CPA • Current Status: design phase (delayed by COVID backlog) • Target Project Start: June 2025 • Target Project Completion: Fall 2025 • Project Lifespan: 10-15 years End -of -life renovation of the field including laser site grading, repair/modernization of the irrigation system, installation of new natural grass, installation of new backstops, benches, and signage, and ADA compliance upgrades to improve accessibility. Playgrounds — Justin Park Playground End -of -Life Replacement • FY2024 Appropriation: $155,000 [2023 ATM Article l0k] • Funds Source: CPA • Current Status: Project canceled, and CPA funding returned. Playground will be phased out. The Justin Park playground was installed in 2003 with an estimated lifespan of 15-20 years and consists of play elements for children 2-5 years old. During the project design process, consultation with the Conservation Department and Conservation Commission revealed project challenges associated with the site's proximity to/location in wetlands zones, and resident engagement in neighborhood design input meetings was relatively sparse. In light of these factors, as well as the relative proximity of the location to two other neighborhood parks (Marvin, Kineens) and Recreation's recognition of the strain being placed upon CPA funding in Lexington, the Recreation Committee agreed with the recommendation of the 21 2025 RECREATION COMMITTEE CAPITAL PROJECTs REPORT Recreation and Community Programs Department and voted to cancel the project and return the appropriation to the CPA fund. The existing playground equipment will be monitored closely for safety and will be removed without replacement as it reaches end -of -life, and the playground will be phased out. The Recreation and Community Programs staff and Recreation Committee will continue to engage with community stakeholders to evaluate potential future recreational uses for this site. Pine Meadows Golf Course Clubhouse Renovation — Design & Engineering Documents • FY2024 Appropriation: $120,000 [2023 ATM Article 16g] • Funds Source: free cash/cash capital • Current Status: Completed Funding for solar study and design and engineering documents was appropriated at 2022 ATM and 2023 ATM, and those project elements were completed in 2024. Construction funding ($2,575,000) was sought by the Department of Public Facilities and approved at 2024 Annual Town Meeting (Article 25). The project went out to bid in November 2024 and construction is anticipated to being early in 2025 with target completion of late 2025. Addition information can be found at: https://lexin onma.Rov/1971/Pine- Meadows Pine Meadows Golf Course — Grounds Maintenance • FY2024 Appropriation: $124,000 [2023 ATM Article 11] • Funds Source: Recreation Enterprise Fund • Current Status: Active • Project Start: 2024 • Project Completion: cart paths completed • Project Lifespan: 15-20 years This project comprises the renovation of the cart paths at the 7" and 8' holes and the practice area. Pine Meadows Golf Course — Grounds Equipment • FY2024 Appropriation: $110,000 [2023 ATM Article 11 ] • Funds Source: Recreation Enterprise Fund • Current Status: ordered awaiting delivery • Project Start: late 2023 • Project Completion: pending (delivery can take 1-2 years) 22 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT • Equipment Lifespan: 15-20 years This appropriation for the purchase of a Toro Groundmaster rough mower, a Turfco topdresser, and a tow behind turbine blower was part of the ongoing Pine Meadows Grounds Equipment Replacement Plan. Aquatics — Mabee Town Pool Water Chemistry Controller • FY2024 Appropriation: $35,000 [2023 ATM Article 11] • Funds Source: Cash Capital • Current Status: Completed • Project Start: September 2023 • Project Completion: October 2023 • Project Lifespan: 20 years 23 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT FY2023 APPROPRIATION UPDATES Center Recreation Complex — Bathroom/DPW Building Renovation • FY2023 Appropriation: $400,000 [2022 STM Article 5] FY2023 Appropriation: $680,000 [2022 ATM Article l0e] FY2022 Appropriation: $915,000 [2021 ATMArticle 16g —indefinitely postponed] • Current Status: Completed • Project Start: March 2023 • Project Completion: November 2023 • Project Lifespan: 20+ years The original request for funding of $915,000 for the project was indefinitely postponed by the 2022 Annual Town Meeting. A request for $680,000 of funding for a scaled-down project was approved by the 2023 Annual Town Meeting. A request for $400,000 in supplementary funding to pursue the project after all public bids came in over the original appropriation was approved at the 2023 Special Town Meeting. The revised project was completed in November 2023. Hard Courts — Farias and Gallagher Courts End -of -Life Reconstruction • FY2023 Appropriation: $2,500,000 [2022 STM Article l0f] • Current Status: Completed • Project Start: Summer 2023 • Project Completion: Spring 2024 • Project Lifespan: 10-15 years for Farias Courts; 20+ years for Gallagher Courts Playgrounds — Kinneens Park Playground End -of -Life Replacement • FY2023 Appropriation: $200,000 [2022 ATM Article 10g] • Funds Source: CPA • Current Status: Completed • Project Start: October 2023 • Project Completion: November 2023 • Project Lifespan: 15-20 years 24 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT Athletic Fields — Fiske Field End -of -Life Renovation • FY2023 Appropriation: $250,000 [2022 ATM Article 10h] • Funds Source: CPA • Current Status: Active • Project Start: October 2024 • Project Completion: Spring 2025 (prior to Little League season) • Project Lifespan: 10-15 years This appropriation was for the complete end -of -life renovation of the field including laser site grading, repair/modernization of the irrigation system, installation of new natural grass, installation of new backstops, benches, and signage, and ADA compliance upgrades to improve accessibility. Lincoln Park — Master Plan • FY2023 Appropriation: $100,000 [2022 ATM Article 10i] • Funds Source: CPA • Current Status: Completed • Project Start: January 2023 • Project Completion: September 2024 • Project Lifespan: 20 years The Lincoln Park Master Plan as prepared by Activitas, LLC can be found here: https://lexingtonma. gov/DocumentCenterNiew/ 12911 /Lincoln -Park -Master -Plan -Oct - '7%; ATA - Pine Meadows Golf Course — Grounds Maintenance • FY2023 Appropriation: $95,000 [2022 ATM Article 11 ] • Funds Source: Recreation Enterprise Fund • Current Status: Completed • Project Start: 2022 • Project Completion: 2023 • Project Lifespan: 15-20 years This appropriation was for several grounds maintenance projects to maintain the quality of the course including: bunkers (2" a 7th 8t" and 9th holes), tees (8th and 9th holes), and cart paths (5th hole). 25 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT Aquatics — Mabee Town Pool Water Heater • FY2023 Appropriation: $60,000 [2022 STM Article 10] • FY2023 Appropriation: $31,000 [2022 ATM Article 16h] • Funds Source: Recreation Enterprise Fund • Current Status: Completed • Project Start: April 2023 • Project Completion: May 2023 • Project Lifespan: 10+ years. There were two FY2023 appropriations made for this project. First, $31,000 was appropriated at 2022 ATM to fund an engineering study of the use of solar energy to power a new water heater. Second, $60,000 was appropriated at 2022 STM to purchase and install a solar powered water heater system. 26 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT FY2022 APPROPRIATION UPDATES Community Center Sidewalk and Patio Installation • FY2022 Appropriation: $110,000 [2021 ATM Article 10a] • Funds Source: CPA • Current Status: Completed • Project Start: May 2022 • Project Completion: May 2022 • Project Lifespan: 15-20 years Playgrounds — Rindge Park End -of -Life Playground Replacement • FY2022 Appropriation: $170,000 [2021 ATM Article 10b] • Funds Source: CPA • Current Status: Playground completed. ADA improvements pending. • Project Start: April 2022 • Project Completion: June 2022 (playground). ADA target: TBD • Project Lifespan: 15-20 years This appropriation was for the end -of -life replacement of the playground at Rindge Park and improvements to site accessibility. The ADA improvements have not yet been completed as efforts are underway to "bundle" the ADA improvements that are associated with multiple recent/pending capital projects, e.g., Valley, Rindge, Fiske, Harrington, Bowman, and Bridge, to accrue cost benefits associated with sending a larger single project out to bid. Athletic Fields — Muzzey Field End -of -Life Renovation • FY2022 Appropriation: $155,000 [2021 ATM Article 10c] • Funds Source: CPA • Current Status: Completed • Project Start: April 2024 • Project Completion: June 2024 • Project Lifespan: 10-15 years This appropriation was for the complete end -of -life renovation of the field including laser site grading, repair/modernization of the irrigation system, and installation of new natural grass field. 27 2025 RECREATION COMMITTEE CAPITAL PROJECTS REPORT Pine Meadows Golf Course — Grounds Maintenance: 1St/2"d Fairway Drainage D&E • FY2022 Appropriation: $25,000 [2021 ATM Article 11] • Funds Source: Recreation Enterprise Fund • Current Status: D&E completed. Project on hold. • Project Lifespan: n/a This appropriation was for the production of design and engineering documents for a project to improve drainage along the 1St and 2nd fairways. The D&E was completed, but the project is on hold as the result of concerns of the Conservation Commission. Pine Meadows Golf Course — Grounds Equipment • FY2022 Appropriation: $62,000 [2021 ATM Article 11 ] • Funds Source: Recreation Enterprise Fund • Current Status: Completed • Project Completion: Received 2023 • Equipment Lifespan: 10 years This appropriation for the purchase of a Toro fairway mower was part of the ongoing Pine Meadows Grounds Equipment Replacement Plan. 28 Adams Field Bowman Field Bridge Field Center Track -track Center Track Field - field Center Track Field - lights Center Field 1(Var Softball) - field Center Field 2 (Var Baseball) - field Center Fields 1&2 - lights Clarke Field Crumb Field Diamond Field Estabrook Field Fiske Field Fitzgerald Field Franklin Field Garfield Field Harrington Field (existing) Harrington Field 1(proposed) Harrington Field 2 (proposed) Harrington 1&2- lights (proposed) Hastings Field 1V Baseball Field Lincoln Park Field 1- field Lincoln Park Field 1- lights Lincoln Park Field 2 - field Lincoln Park Field 2 - lights Lincoln Park Field 3 -field Lincoln Park Field 3- tights Lincoln Park Softball Field Lincoln Park Little League Muzzey Field Sutherland Field Worthen Road Field Calendar Year 2 2 estimated min life ®estimated max life _estimated replacement 2024 8-10 yrs ^20+yrs replacement TED pendingother project disposition funded replacement project Last Major Renovation Estimated Lifespan 2 2 2 2 2 2 2 2 2 2 2 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 2 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 0 0 0 0 0 0 0 0 0 0 3 3 3 3 4 4 4 4 4 4 2024 2016 -20+yrs 10-15 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 2015 10-15 2 2 2 yrs 0 0 0 0 0 0 2025 10-15 yrs 0 0 0 0 0 0 2025 10-15 yrs 0 0 2018 10-12 2 2 2 yrs 2 3 2018 8-10 yrs 3 3 3 1=25yrs 3 3 2020 4 4 4 2010 10-15 yrs 4 5 2010 10-15 yrs 8 9 0 1 2 3 2019 >=20yrs 6 7 8 9 0 1 2014 10-15 yrs 4 5 2011 10-15yrs 2020 10-15 yrs 2015 10-15 yrs 2025 10-15yrs 10-15 yrs 2011 10-15 yrs 2 2 2011 2024 10-15 yrs 2024 8-10 yrs ^20+yrs 2025 2 2 8-10yrs 2017 2015 -20+ yrs 8-10yrs 2024 2016 -20+yrs 10-15 2021 yrs 10-15yrs 2013 10-15 yrs 10-I5 yrs 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 Recreation Committee Update: March 2025 Update and review of 2024 LFM use of Worthen Road Practice Field The weekly Lexington Farmers' Market at the Worthen Road Practice Field continues to be a successful partnership, with feedback from customers, farmers and vendors and LFM staff positive and consistent with the previous years of Worthen Road Practice Field use. Specific feedback focused on ease of parking, an enjoyment of the open and beautiful space, and the community feel and positive "vibe" that the site gives as part of the Center Recreation Complex. There are concerns about the instability of the entrance surface, the distance to walk from parking and the single entrance, and ongoing discussions with the Commission on Disability on how to make the site more accessible. LFM leadership continued to rely on strong partnerships with town departments to navigate challenges that arose. We are extremely grateful to the Recreation Committee, Department of Public Works and Town Manager's office for their support and assistance in making this a successful year at Worthen Road. Following are specifics related to the use of Worthen Road Practice Field: Town assistance for market site: • The DPW installed barricades around the market site for the full season which were essential in creating a safe market environment with a single entrance and exit off the access road. • This practice allows LFM staff and volunteers to monitor the field in order to ensure appropriate use and enforce rules and regulations, including no dogs allowed on site. The barriers also create a more secure work environment for the farmers and vendors with tents that back up to Worthen Road. • Trash and recycling pickup and additional safety cones were provided by the DPW and compost was picked up on Thursdays by market partner Black Earth Compost. Garbage pickup by the town was inconsistent, leading to bins with garbage and rainwater accumulating. We worked with DPW to ensure more consistent emptying of garbage bins by the town. Field Conditions: • In comparison to 2023, it was a hot and dry market season, with multiple days over 90 in mid summer. This did create dusty conditions at times and challenging with wind. • The field surface was impacted by the track and field cage, with divots left on the field. We worked with the DPW and James Hall to ensure that there were dedicated field checks and filling of divots before the Tuesday market, but still had to fill a fair amount on our own on occasion. • As has occurred annually, the market entrance was worn down by the end of the season. LFM staff used temporary measures to keep customers away from unstable ground, including marking off areas and moving the customer entrance closer to Worthen Road for a safe pedestrian entry. • LFM management worked with the DPW to find workable solutions to protect the field surface and entrance area. • To minimize damage, farmers and vendors were required to abide by a 5 mph maximum speed limit while on the field. • On average, 10 - 14 essential vehicles remained on site during market hours, including farmers/vendors who required in -truck storage needs, generators for cooling products per BOH requirements, and vendors with mobility or ADA needs. Inclement weather: • The LFM worked closely with the Lexington DPW to monitor weather and adapt field use in the case of inclement weather. The drainage on the field is generally very good, with only extreme rain conditions making the field boggy. We continue to emphasize the importance of keeping the market open for the 24+ small farms and businesses that rely on the LFM for their livelihood, and the variability of weather reports 24 hours before the market. • We continue to emphasize timely and effective communication on weather and field conditions, including shifting setup location on the field; this includes LFM input onsite to assess conditions Tuesday am. • We were grateful to not have to shift the market to an alternate location in 2024 due to emergent weather or dangerous field conditions. Thank you to Melissa Battite for her continued assistance in devising alternate plans for market relocation if necessary. • The LFM will continue to work with Town departments and the DPW should the market need to be relocated to LHS parking lot in summer and pool parking lot in September and October. Note that LFM board and staff make every effort to come up with mitigating strategies to avoid relocating the market on Tuesdays, as it limits farmer vendor participation and negatively impacts customer attendance. General Parking: • Customers parked on Worthen Road and surrounding public parking areas. Farmers/vendors also used the parking lot by the Little League field on Park Drive. • With support from the Lexington Police Department and dedicated signage, the LFM offers senior, ADA, and standard customer parking. This included three marked ADA spots near the center playground by the back of the football field and two new ADA spots on Worthen Road near the access road entrance. • LHS students driving to school were receptive on market days, and respected the posted signage reserving spots for LFM customers. Customer Access: • Response to concerns over ADA access for those with mobility issues continue to be under the management of the DPW, Commission on Disability and the Conservation Commission. Concerns expressed by customers and members of the Commission on Disability include the distance to walk from parking to the market, an unstable market surface, the distance from the ADA spots by the playground to the market site, and the curb cut on Worthen Road to the access road limiting wheelchairs. Recreation Committee Request: 2025 Special Event Permit for LFM use of Worthen Road Practice Field Calendar and Dates of Operation May 27 - October 28, 2 pm - 6:30 pm; market closes at 6 pm in October. Set up will begin at approximately 11:15 - noon and the market site will be cleared by 7:30 pm. November 25 (Thanksgiving FEASTival). 12-4 pm. Set up will begin at 10 am and the market site will be cleared by 5 pm. On market days, LFM staff will remain onsite until all farmers and vendors have left. Signage: Two banners, 8 ft. x 5 feet to be hung on the fence abutting Crumb Football Field and facing Worthen Road. Double Banner 8x3 with Food Assistance Logos.pdf One small 5x3 foot banner to be hung on storage shed during summer market season and during winter market season January - April. Fees: REQUEST that fees for site use are waived as has been the practice since 2021. Bathrooms (required to provide restroom access for formers/vendors) • Access to restrooms by playground through November 25, 2025 Thanksgiving FEASTival. Barricades: • REQUEST that the DPW place yellow barricades along Worthen Road and down the bike path to the entrance of the market space as in the past. These barricades o prevent customers from entering the market space during setup when vehicles are moving on the site o create a safe entrance space on a level surface o enable the LFM to enforce BOH and Rec. Comm regulations banning dogs onsite o provide a security barrier behind farmers and vendors whose tents back up to Worthen Road (managing market flow and diminishing chance of theft) o prevents vehicular threats to public safety • REQUEST that barricades remain around the LHS track and field cage to prevent customers from entering cage There is no need for barricades along the woods or backing up to Crumb football field fence. Entrance: The LFM will continue to work with the DPW and the Recreation Department to maintain a safe and accessible entrance for market participants, including a stable surface area for pedestrians. Farmers and Vendors/Capacity, Tents & Parking: • Total of —28 tents each market day, including artisans, musicians and community tent • Tents are weighted and/or staked into the ground for safety in wind • Vendors drive onsite for easy loading/unloading; based on storage (farms), energy generation needs (generators) or ADA and mobility needs, a limited number of vendors keep their vehicles onsite by their tents by previous agreement with Market Manager. • We estimate that there will be a maximum of 14 vehicles on site per market, and frequently less. These vehicles will be parked on the perimeter of the market space. • Those vehicles not remaining on site would park further down Worthen Road or in the Park Drive parking area by the small baseball field. Customer Parking: • Adequate parking is available on Worthen Road, the Center Playground lot and in the surrounding area. Spots are reserved by traffic cones for market hours put out Monday evening before market day. • Following procedures coordinated with the Lexington Police Dept, 2-3 spots will be reserved closest to the market for senior parking. Market Storage: Lexington Farmers' Market will continue to store all of its materials outside of the market hours in the shed built onsite for this purpose. The only exception will be for any materials provided by the Department of Public Works, including garbage cans, or any materials used at the entrance in case of inclement weather. Garbage/Recycling: • The LFM will work with DPW re garbage and recycling bin dropoff and timely pickup, and make arrangements with Black Earth Compost for compost pickup on Thursday. Inclement Weather: • LFM staff will consult with the Recreation Committee and the Department of Public Works as to field conditions in case of extreme weather. The LFM is a rain and shine market and remains open unless there are safety concerns. Alcohol Use Policy: As permitted by the Town of Lexington, the Select Board and the MA Department of Agricultural Resources, the LFM requests a continuation of the 2021 Alcohol Sales policy at the weekly farmers' market. There is no consumption on site, including no sampling and no sales to anyone under 21 years old per state law. Food Truck: REQUEST to allow a hummus food truck to participate in the market as in the past four years. This food truck would attend monthly at the market, making hummus and tabouli bowls onsite for customers. • The food vendor is required to have all the appropriate permits from the Lexington Board of Health and receive approval from the Town Manager's office as well. • The food truck would be located close to the access road and is approximately 25 feet in length. NEW REQUESTS for 2025 REQUEST that as in 2024, the LHS track and field coaches and athletes walk the field in advance of the Tuesday market to fill in any divots from throwing practice, and create a stable and safe walking surface for those using the site on Tuesdays. H OX J � as �a `AW Z J I=O LLZ H _ W J X � W Z O V ti f; W H } W 0LL F W Y U O am Z Z J -a 0 c W i W Qw LL> o� w Q 1�-z zt2 4 a(A >D J i - (A W Z w0 Ow •fem o o .w A a� •? e� 00 0 S- :2 bee 0 41 onom MCL 4 .P �mee O Ln cbe. tm .c OUND �. I-,u� per' op. •c .�0 a ASA .� be.— P.. tm N w ' - . . . 3 O u W D a tr o .� Q u o `.I/ t� .O 0 Z CL cl e t'd O — uj z 0 S •v qq<C O p d '� u J Z - m t�f N 41 CL �P V tv ¢ W 'a c S a .0 UI �. 1 ad 1 �Ol I - 0 J CL w Z O no C• 0 .c C. ta m° 40 0 CL Em A to 13 mm mm bm . 4) ZI to 4w � O oO O a., a C � � 0 v a, v F . j �' u ® 41 � CL .P O 75ton ur) O -c to t u0 N � N 0 s m 0 O ® u O O , o N U ,o O Q) { yF 4i�77 M N _N N -� O C O N C J �-' u ,� O o O - v - z O Q- 4-J O 0 O 4-1 Q cin O' N vi S�. 4-1 ? s bo ed si. Cid 0 ZIE 1 • si. 0 0 • 0 ' P y ff•+4�� � : � 1 , R 2- 1 72-1 R 1{X yt a e T T Fill t A i x � 1�. now t E� h R e t A i x � ;�i sal f•1" �:_ t .c' � 4 4Y o S R` 7a J f 74 dt1 4 i. yJ. S _ E • • Yter. Aw LU i ............................................................• W's lips /a q to OC _V M .�►:An LA } LLJ LA la'1 Q N U a r„ s v! D O +=.f= •....................... LU i r /a q to OC _V LA } LLJ LA la'1 Q N U a r„ s v! +=.f= •....................... N co r /a q Ix uj LA } LLJ LA Q N U D O 3 wQ d K (..,.,,..% u7 i•� Q Z Lij W N J Z Q O Z Q. N 0 o ai ro L Q ai aj a � a, Ln 0 0 ro ,Y u u r6 M r6 12� 0- 0 • C- 4 -J 0 S-- 0 0 cli 4-J ro Q ro m or O a, a- aj L- ai u ra 0 No ro X E O Ln to _ 0 r6 0 ul Ln Z w M 4-J \ j 0 L- W ro l ru L QJ fo I 1 0 c: r6 0 Ln -0 clj ai r u aj N 0 LL 0 u R3 s u • 0 a, a, au a, ro 0 4-1 Ln Ln aJ u L) ro 0 z • a, u C - r6 aJ ro E E L- ai ai I 0 0 J • Ln ro CU 7; 4-J Ln ro Ln 0) C- 4 -,p 4-J C- 0 rU 0 0 a �Q cu Ln Ln :3-- W ci i R ro U ai ai aJ n Ln Ln 0 Ln I � 4-J 0 C- 4-1 ro c .0;ff • C- ro u r Y ro C- ro C M E 0 L ai N m W • W N LL a.. 0 G 4! = cqs N WW Cep Z u3E 0 0 0 0 0 0 0 o O O o O o o o to o in N M N N rl r -I sanies 0 0 0 0 0 0 o 0 0 0 Ln rn r14 H sanleA T Q) v _ Z) - -------- - Y a L LL V) N N o4 '^ Ln ���JJJ v UL + u o v E ti° c a, E a Q) a v L v (A a � a � Y Q a(A UU sv��s u 0 0 0 0 0 0 0 o O O o O o o o to o in N M N N rl r -I sanies 0 0 0 0 0 0 o 0 0 0 Ln rn r14 H sanleA T v _ Z) - -------- - U- D O LL V) N N o4 '^ Ln ���JJJ ° -- c Y O UL + u L o° a° N o.. mO ro U 0 0 0 0 0 0 0 o O O o O o o o to o in N M N N rl r -I sanies 0 0 0 0 0 0 o 0 0 0 Ln rn r14 H sanleA _ Z) - -------- - - a v V) N o4 '^ Ln ���JJJ ° -- c Y O UL + u (0a c c c v 41 �_ o o °- cn L a O O O O O O O 0 lf1 O to O lIl O O to O Ln O Lf) 1f1 N O I- Ln N O lf1 N O I- M N sanIPA sanlen L Ln N L Ln i1 Ol 1N: ® O LL O LL O V U ;yam O C o O Ln 41 M aC7 C C U 3 c Z J J L E U ON ON O O O co tD d' O O O O rl r4 O Ln O Ln sanleA `1l r' -q sanlen Z a J L LL Q1 � LL CL UO J Ln Z) I O C CC O O ra LL Z 4-J . N • z i ., 0 z U L �J V) O ° u J J c- 0 O O O O O O O O O O O O O O O O O O O O O O O O Ln O Ln O u1 Ln d' m N �y m NN -4r-I san l eA v sanlen �— 4,x O Q) f6 00 a C oLL O u Ln O QJu o o V) � v � c� .� z z Ln 0 >�_ � I -J J 0 J z ° _ CD L O O o O O o O Q O !!1 O lIl O N O O Ln O Ln O U'f Uf N O Il Uf N O Ln N O I- L(1 N -1 -4 O O O O -i ri ri sanlen sanlen J � LL LL O � c � °�- �, O c Q o 979 O ) cm � L- u n ♦ (D � 0 L I Z �- ED Z r6 °Ln U Q * J j J p �l V OO O O O O O O O 00 � N oO � OO O ln sanlen N -4 -4 sanlen � ��_x ee Lexington RCCUATION & COMMUNITY Town of Lexington Recreation and Community Programs Melissa Battite, CPRP Tel: 781-698-4800 Director of Recreation and Community Programs Fax: 781-861-2747 Recreation & Community Programs March 2025 Report Save the Dates & FYI • Monday, March 24th — Annual Town Meeting will begin. Town Meeting prep (article speeches, presentation slides, and supporting documents) is ongoing. Thursday, April 17th— Monday, April 21St— Lex250 Saturday, May 3rd — Lexington Little League Opening Day Parade Saturday, May 24th — Discovery Day LHS Building Project • LHS Building Project Forum #10 is scheduled for Wednesday, March 191h at 6:30pm. Celebrations • Charlie Schroeder successfully passed the Certification Park and Recreation Professional (CPRP) exam on February 28th. A total of seven staff members now have the CPRP certification. • The department was awarded the Million Coaches Challenge grant, which will provide free training from the US Soccer Foundation to youth sports coaches in 2025. Lexington was one of fifty-two receipients, and one of two from Massachusetts. • Kate DeAngelis was the Keynote Speaker at the Inclusion Summit at UMASS Lowell. She presented to over 50 attendees representing schools, hospitals, non -profits and community organizations with a focus on bringing Inclusion to your agency. Inclusion • On Tuesday, March 18th, 2025, Melissa Battite and Kate DeAngelis presented the annual update on Inclusion and Adapative services and capital to the Commission on Disablity. • This past winter, a pilot program was held at the Cotting School for adaptive basketball. The program was a huge success and the location is ideal for adaptive programming. Additional programs will likely take place at Cotting in the coming seasons. www.lexingtonma.gov/recreation recdeptCEDlexingtonma.gov 39 MARRETT ROAD, LEXINGTON, MA 02421 (office) 1625 MASSACHUSETTS AVENUE, LEXINGTON, MASSACHUSETTS 02420 (mail) Marketing • Spring/Summer registration: o 994 Registrations 0 237 memberships o $786 donated to the Rec Scholarship Fund 0 2,294 reads on the brochure since we uploaded on Feb 22 o Peaked at 898 users on MyRec on 2/25 with over 51,000 event counts (average around 250 users and 4,000 event counts) March e -newsletter had an open rate of 72% and a click rate of 5% out of the 15,000 emails it was sent to. • Over the past 30 days the Spring/Summer brochure had over 4,263 reads and average read time of 6 minutes. • Over the past 30 days the MyRec website had over 9,600 active users. Inclusion • On Tuesday, March 18th, 2025, Melissa Battite and Kate DeAngelis presented the annual update on Inclusion and Adapative services and capital to the Commission on Disablity. • This past winter, a pilot program was held at the Cotting School for adaptive basketball. The program was a huge success and the location is ideal for adaptive programming. Additional programs will likely take place at Cotting in the coming seasons. Community Center • There were 221 reservation totaling 1,237 hours over the past 30 days. • Community Center visitation in the last 30 days was 11,946. • DPW/DPF/IT completed 13 work orders to help keep the building safe and usable for the public. • February Break classes at the Community Center consisted of Chess with 9 students, Right Brain Curriculum Lego City creators & Shark Tank Jr with 8 students, and a Citcuit Lab course with 13 students. Late winter youth classes started up in March (Chess, Youth & Adult Table Tennis, Combined Martial Arts, Adaptive Martial Arts, Dungeons & Dragons, Archery,Writing Wizards, Sports Zone 101) • Tom Romano and Kelsey Rollins collaborated to offer a program run by the LHS Seniorgraphed club who interview seniors in town to talk about their lives. The audio is recorded from the conversation, edited, and sent back to the resident. They interview 5 seniors on March 7th Programs & Services • During February School Vacation Week, the department offered two new programs including a licensed day camp, and an advanced skills basketball clinic from an outside vendor. o February Fun Camp was a licensed inclusive day camp offered over four days and included sports, arts and crafts, and STEM activities. 17 children participated in the February Fun Camp. o Prove Them Wrong provided a high level, four-day basketball clinic for middle school athletes. 15 athletes participated in the February clinic. Summer staff interviews are ongoing with the goal of filling all leadership positions before the end of March. Parks, Fields, & Facilities • Aquatics o We are still recruiting and interviewing candidates for aquatics positions, and we are mapping out orientation and trainings for aquatics staff. o Swim Memberships are currently on sale for both Residents and Non -Residents for the 2025 season. o The contract for Pre-season/Post-Season/On-call Maintenance Support at the Town Pool is out to bid and is due March 20tH o DPW is scheduled to begin preparing the Town Pool for the season after Patriots' Day. Athletic Fields o The spring field schedule has been finalized. o The synthetic turf fields will officially open for the season on Monday, March 17th for the LHS spring sports season. The target date to open the grass athletic fields is on or about April 11t, weather permitting. o No field permits have been issued on Friday, April 18th through Sunday, April 20th due to the Lex250 Patriots' Day weekend festivities. o The portable toilets are scheduled to be delivered to six parks (Adams, Bridge, Clarke, Diamond, Estabrook, and Harrington) on Monday, March 24th. The public restrooms at the Center Recreation Complex and Lincoln Park are tentatively scheduled to open in late -March or early April, pending temperatures and conditions. In the interim, portable toilets were delivered to these two parks on Friday, March 14tH o The LHS Baseball Boosters has decided to invest in improving the current batting cage located next to Center #1 rather than installing a brand new batting cage. This work in scheduled to begin during the week of March 24tH • Hard Court Surfaces o As of March 13th, a total of 249 tennis/pickleball memberships and 63 Battle Green Tennis League memberships have been sold for the 2025 season o Permitted use of the tennis and pickleball courts will begin on Tuesday, April 1St o The tennis and pickleball court reservations will go live on PlayLocal on a rolling basis throughout the season, two weeks before the reservation time. o New portable pickleball nets have been ordered for the Adams and Clarke Courts. o A large tree came down at the Farias Basketball Courts during the windstorm on the Thursday, March 6th. Thankfully, there was no damage. • Pine Meadows Golf Club o Lower pond dredging work beginning with surveys and delineation, etc o The Clubhouse renovation project has mobilized. Sports Advisory Council • The most recent Sports Advisory Council meeting took place on Tuesday, March 111h Budget & Capital • Prep for Annual Town Meeting continues as recordings for the various articles are in the process of being finalized. • Valley Courts — the public hearing was closed at the Conservation Commission meeting on Monday, February 24th. At its March 3rd meeting, the Conservation Commission voted to approve the project under the Massachusetts stormwater bylaw, but not under the more stringent Lexington stormwater bylaw. Activitas has requested to reopen the public hearing during the Conservation Commission meeting on Tuesday, April 8th. The bid opening for this project is scheduled for Thursday, April 3rd Fiske Field Renovation — a project check-in was held on Friday, March 7th. The contractor will remobilize in late March/early April, depending on the weather and field conditions, and work is anticipated to completed before the end of April. The next check-in is scheduled for Friday, March 28th. A final walkthrough has been tentively scheduled for Friday, April 25th with the construction fencing set to be taken down on Monday, April 28tH Harrington New Fields Construction Project — the first community meeting on the new Harrington athletic fields was held on Tuesday, March 11th. The conversation focused on potential designs (field types and layouts, amenities included, etc.) for these fields and there were just under 30 people in attendance. The second community meeting, which will focus on the proposed design, is scheduled for Tuesday, April 15th at 6:30pm. Funding for the full design and construction documents will be requested at Annual Town Meeting this spring and construction funds will be requested at the 2026 ATM. • Lincoln Field #2 — the bid opening was held on Thursday, March 131h and it appears that the bids came in within budget. Reference checks are being completed and the contract will be awarded in the coming weeks. • Pine Meadows Golf Clubhouse Renovation —the project is under contract and the contractor is scheduled to mobilize before the end of the month. • Reservoir Bathouse renovation — a walkthrough with Town staff from Recreation, DPW, DPF, and IT is scheduled for Thursday, April 3rd to review the items that need to be completed before the facility opens for the summer season. • Lincoln Park Boardwalk — the survey work is underway. vs M s 177s h Town of . exln ton b Massachusetts RECREATION COMMITTEE Frederick DeAngelis, Chair I Christian Boutwell, Vice Chair Claire Sheth I Carl Fantasia I Weiwei Li I Renen Bassik Tel: 781-698-4800 Email: recreationcmteAlexin�onmagov Web: www.lexin onmagov/511/recreation-communi�ro r�/511/recreation-communi�ro r The Recreation Committee comprises seven residents of Lexington who are appointed to three-year terms by the Town Manager with the approval of the Select Board. The current members of the Committee are Rick DeAngelis (Chair), Christian Boutwell (Vice Chair), Claire Sheth, Carl Fantasia, Weiwei Li, and Renen Bassik. The official charge of the Recreation Committee is to be "...responsible for the planning and administration of public playgrounds and recreational centers in the town. It is charged with administering, expanding, and promoting recreation, leisure activities, play, sports, and physical education." The primary interface of the Committee with Town Meeting is in terms of appropriation requests to fund capital projects to maintain the quality of the many recreation fields, courts, facilities, and other assets. Additional information will be available soon in the Recreation Capital Projects Report under Article 2 on the Town Meeting site. The Recreation Committee works closely with, and in support of, the Recreation and Community Programs Department in pursuit of our shared goal to provide a broad spectrum of high-quality recreation opportunities for all residents of Lexington. Indeed, we refer collectively to ourselves as "Recreation", which is not simply a convenient shorthand, but rather an intentional choice to reflect the closely aligned interests and highly collaborative efforts of the two entities. The effectiveness of the Recreation partnership is due in no small part to the dedication and professionalism of the executive leadership team: Melissa Battite, Director of Recreation and Community Programs Department; Christine Dean, Community Center Director; and Peter Coleman, Assistant Director of Recreation. The Recreation Committee holds standing public meetings at the Community Center in the evening of the third Wednesday of each month and project- or policy -specific community meetings as needed to address special topics. The agenda for monthly meetings (posted forty-eight hours in advance), and the minutes and associated materials for past meetings (posted following Committee review and approval), and information regarding capital projects (and so much more!) are available through links on the Recreation and Community Programs Department website: https://www.lexingtonma.gov/51 I/Recreation-Community-Programs From: Lexington, MA boards@granicuslabs.com Subject: andrea L jackson has submitted an application for Recreation Committee Date: February 22, 2025 at 15:57 To: Selectboard@lexingtonma.gov, recreationcmte@lexingtonma.gov USE CAUTION: This email came from outside the Town of Lexington. Do not click links, open attachments or respond to the email unless you recognize the sender, you are expecting the communication and you know the content is safe. A new application for Lexington MA Boards and Committees has been submitted. Applicant: andrea L jackson Boards Applied For: Recreation Committee Link: https://lexingtonma•aranicus,com/apps boards/applicants/?id=1886803 From: Lexington, MA boards@granicuslabs.com Subject: Andrea J Fribush has submitted an application for Recreation Committee Date: February 23, 2025 at 12:37 To: Selectboard@lexingtonma.gov, recreationcmte@lexingtonma.gov USE CAUTION: This email came from outside the Town of Lexington. Do not click links, open attachments or respond to the email unless you recognize the sender, you are expecting the communication and you know the content is safe. A new application for Lexington MA Boards and Committees has been submitted. Applicant: Andrea J Fribush Boards Applied For: Recreation Committee Link: https://lexingtonma.granicus.com/apps/boards/applicants/?id=1816266 From: Mark Andersen markandersenphd@gmail.com Lf Subject: Re: Online Form Submittal: Contact Us - Recreation Committee Date: February 27, 2025 at 11:50 To: Peter Coleman pcoleman@lexingtonma.gov Cc: Recreation Committee recreationcmte@lexingtonma.gov, Melissa Battite mbattite@lexingtonma.gov USE CAUTION: This email came from outside the Town of Lexington. Do not click links, open attachments or respond to the email unless you recognize the sender, you are expecting the communication and you know the content is safe. thanks Peter - was just trying to be helpful here. have a good day mark On Thu, Feb 27, 2025 at 8:57AM Peter Coleman <pcoleman@lexingtonma.gwv wrote: Good Morning Mark, Last night's Recreation Committee meeting was a one-off. Typically, the Recreation Committee meets the third Wednesday of each month, which would have been February 19th. However, with last week being the school vacation week, the meeting was moved to last night based on the availability of the Committee members. Once the decision was made to move the meeting to 2/26, there were no rooms available in the Community Center and that is why last night's meeting took place at the Police Station. I do not anticipate this being the case going forward. Have a nice day. Thanks, Peter Peter Coleman, CPRP, CPSI, CYSA I Assistant Director of Recreation Spring & Summer 2025 Program Registration I Tuesday., February 25th at 6am! Town of Lexington I Recreation and Community Programs A: 39 Marrett Road I Lexington, MA 02421 P: (781) 698-4803 1 F: (781) 861-2747 a-w1mFolO Lex i n on Creating Community Through People, Parks & Places From: noreply@civicplus.com <noreply@civicplus.corn> Sent: Wednesday, February 26, 2025 9:21:32 AM To: Recreation Committee Subject: Online Form Submittal: Contact Us - Recreation Committee From: Lexington, MA boards@granicuslabs.com Subject: Guy W Jarvis has submitted an application for Recreation Committee Date: February 28, 2025 at 21:26 To: Selectboard@lexingtonma.gov, recreationcmte@lexingtonma.gov USE CAUTION: This email came from outside the Town of Lexington. Do not click links, open attachments or respond to the email unless you recognize the sender, you are expecting the communication and you know the content is safe. A new application for Lexington MA Boards and Committees has been submitted. Applicant: Guy W Jarvis Boards Applied For: Recreation Committee Link: https://Iexingtonma.granicus.com/apps/boards/applicants/?id=1886930 From: Lexington, MA boards@granicuslabs.com Subject: Subha Sainathan has submitted an application for Economic Development Advisory Committee I Lexington Center Committee I Recreation Committee I Town Report Committee I Vision for Lexington Committee I Vision for Lexington Subcommittee on Local Election ... Date: March 6, 2025 at 11:20 To: Selectboard@lexingtonma.gov, economicdevelopmentcmte@lexingtonma.gov, centercmte@lexingtonma.gov, recreationcmte@lexingtonma.gov, townreportcmte@lexingtonma.gov, visionforlex@lexingtonma.gov, visionforlex@lexingtonma.gov USE CAUTION: This email came from outside the Town of Lexington. Do not click links, open attachments or respond to the email unless you recognize the sender, you are expecting the communication and you know the content is safe. A new application for Lexington MA Boards and Committees has been submitted. Applicant: Subha Sainathan Boards Applied For: Economic Development Advisory Committee I Lexington Center Committee I Recreation Committee I Town Report Committee I Vision for Lexington Committee I Vision for Lexington Subcommittee on Local Election Voter Participation I Vision for Lexington Subcommittee for Sharing Survey Information with Lexington Town Groups and Organizations Link: hops://I exi ngton ma.grqnicus.com/app-s/boards/applicants/?id=l 888807 From: KMc kimmamcc@gmail.com Lf Subject: Lexington Pickleball Club request to continue working towards solution with Lex Rec Committee Date: March 6, 2025 at 12:32 To: recreationcmte@lexington-ma.gov Cc: Melissa Battite mbattite@lexingtonma.gov, PK Shiu pk@pkshiu.com, Mona Altschuler monaaltschuler@gmail.com, Peter Coleman pcoleman@lexingtonma.gov USE CAUTION: This email came from outside the Town of Lexington. Do not click links, open attachments or respond to the email unless you recognize the sender, you are expecting the communication and you know the content is safe. Hello, The Lexington Pickleball Club's Board of Directors and the leaders of the Battle Green Tennis League are submitting the attached two letters to the members of the Lexington Recreation Committee. Our main goal is to show our commitment to working with the Committee to make a 6 court solution possible at the Adams location for the 2025 season. We believe this is possible considering timing and costs, and helps to meet the demand of this sport in our town while also providing more opportunities for the community to be active and build camaraderie. Thank you for your consideration, and we look forward to hearing from you soon. Best Wishes, Kim McCormick Lexington Pickleball Club Board Member G ro LEXfNGTO PICKLESALL March 6, 2025 Dear Members of the Lexington Recreation Committee, On behalf of the Lexington Pickleball Club Board and 1000+ members, we would like to extend our sincere appreciation for your ongoing efforts to enhance and support recreational opportunities within our community. Your dedication to maintaining and improving the town's facilities ensures that residents have access to spaces that encourage health, wellness, and commurtiity engagement. We also want to acknowledge that the committee has listened to our requests in the past, and we appreciate the opportunity to be part of discussions that aim to improve pickleball offerings for town residents. However, we are concerned that recent actions indicate a reluctance to work towards solutions that would benefit our residents and their growing interest in playing pickleball as a form of recreation. In particular, we have provided documentation to town staff for a reasonably priced solution to increase the number of courts at the Adams location from four to six, following a successful pilot program last season that demonstrated a strong need for additional space. The solution is a simple painting project with a minimal fence adjustment (to remove the "V" shape). We have also offered to assist with funding to help offset costs associated with this project and know that it is possible to complete this Spring with only 1 week of downtime. Despite this, our request appears to have been dismissed without reasonable justification. We believe that painting the Adams location to allow 6 pickleball courts is a simple, affordable solution trial wouo serve the oroaaer community ano augns witri ine commintme s mission to promote and improve recreational access. Given the substantial interest in this initiative and the LPC's commitment to being a proactive partner, we urge the committee to be open to approving this project for the 2025 season. We remain committed to working collaboratively and respectfully with the committee to reach a resolution that best serves Lexington residents. We would appreciate an opportunity to further discuss this project and explore viable pathways. Thank you for your time and consideration. We look forward to your response. Respectively, Lexington Pickk4WI Club, Board of Directors i_etter of Sup[x)rt for Dedication of Adani-:. CourLs to PicklebAl #i tt,le Green Tviinis, I_cagtx Frbruary 2 , ?ti?; Itt Iov,n of UNi-n,i;to:l Rt-crt`ation Dvpl_'tnilnt, i'atT, a> wlirt- critotI;vvP- tq ihr mcrnt.�rs trI Siic battle 6rec-11 l C111w, Lt•agur, :tr(, lt'r ing to expri':ti OW sialiport tor the t.l�` fication of Ad 3in2S Courts for pit klt.'ba . As, in t.0 t•.7ili(.ltic-tit il.a: cht r.�sl3cs tltc promotion and enitynicrtt of roque., in our coni nnunity, we '11C };rO int; interest anti t uniand fo- pickleball among resident, lilt: Fak dk:6-rccll t cni ie ixae,irc ita, t iwki s tiro it ettmmitfcd ti,,uppo=ting lllinan%et, tl_at vnhatnie rc'c;reationa, oppo twnitiC4 S%-ithatl k)Ur C01211- 1UnSCs. that the audition of kiodicated pickloloall hitt=t5 at dosis c_tuirt> Will �i�;ieificantls con.tributi, to lit, : ibrollcv and tit irir li L`,)l -,,r r't� offerings. Leitii t'ro]V, K,? r I Vti,ku, Cu Clw. i L3alklr t.iitta j"tri; i> Lca��t=a� kGarlct�snuiL.� nna;l c: int Mona Alt>Chuivr C o-( hair l3at#ic Grtxn I ettrI3t. 1_ ,'tt,ut. ?'1t>n,i,tltV'hUit'r ri �;Intaii-Ct�I11 From: Recreation Committee recreationcmte@lexingtonma.gov Subject: Re: Let's avoid overrides! Original Harrington School is an asset to meet MBTA Communities Act Infrastructure Needs Date: March 16, 2025 at 17:34 To: LVBH lexingtonma1977@gmail.com, Select Board selectboard@lexingtonma.gov, Town Manager Manager@lexingtonma.gov Thank you, Your email with others sent to the recreation email are included in the monthly meeting minutes as per usual. Sincerely, Renen Bassik From: LVBH <lexingtonma1977@gmail.com> Sent: Tuesday, March 11, 2025 3:10:05 PM To: Recreation Committee; Select Board; Town Manager Subject: Let's avoid overrides! Original Harrington School is an asset to meet MBTA Communities Act Infrastructure Needs USE CAUTION: This email came from outside the Town of Lexington. Do not click links, open attachments or respond to the email unless you recognize the sender, you are expecting the communication and you know the content is safe. Dear Members of the Recreation Committee, Members of the Select Board, and the Town Manager, Please see my attached letter regarding re -purposing the Original Harrington School to avoid future overrides. I would like to submit this letter for the Town record. Please acknowledge receipt of this email and the attached PDF file. Thank you, Vida Baterina Hom Lexington Resident since 1977 ********************** 175 Grove Street Lexington MA 02420 March 11, 2025 Lexington Recreation Committee Lexington Community Center 39 Marrett Road Lexington, MA 02421 RE: 1. Let's avoid overrides! 2. Original Harrington School is an asset to meet MBTA Communities Act infrastructure iveeas Dear Recreation Committee Members: Lexington is facing a major population change as a result of Article 34. Even the rollback of multifamily dwellings via the proposed Article 2 still promises a significant increase in population. Multiple development plans already before the Planning Board underscore the need for more infrastructures at a great cost to our town. It is prudent that Lexington puts a moratorium on razing our current existing assets, such as the original Harrington School, so these can be repurposed for a drastically changed town. The original Harrington School can be used for: • Lexington Public Schools' student capacity • Lexington Community indoor recreation spaces (the existing Gymnasium / Auditorium / Stage space is great for this, plus the many rooms) • Lexington Community meeting places & Library resources • Housing, similar to the condos at the original Parker Elementary School, apartments at the original Franklin Elementary School, condos at the original Hancock School, condos at the original Muzzey Jr. High School o Housing can be targeted to Senior Housing and Low-income Housing • Arts and Music education facilities, similar to Munroe Center for the Arts at the original Monroe School • Other education facilities, such as The Waldorf School at the original Adams Elementary School Destruction and disposal of this massive building will also result in severe negative environmental consequences. The Town and Recreation Committee should care about materials disposal and the environment. There are other possible sites that do not require demolition that can be used for baseball/soccer fields. For example, the undeveloped municipal lands off of Marrett Road near Clarke Middle School and the Community Center. Taxpayers do not want yet another override, to "replace" a school that we already have. Ubiquitous in the news media are the economic uncertainties due to what is happening at the Federal and State levels. US DOGE slashing jobs, grants, Social Security, Medicaid and Medicare. Trade tariffs, inflation, war. Lexington committees and boards, as fiduciaries, must preserve, not waste, our assets and exercise spending restraint. Do not demolish the original Harrington School just to have landscaped ball fields, when there are other, wiser, options. Sincerely, Vida Baterina Hom Lexington Resident since 1977 cc: Lexington Select Board Lexington Town Manager From: LVBH lexingtonma1977@gmail.com e Subject: Let's avoid overrides! Original Harrington School is an asset to meet MBTA Communities Act Infrastructure Needs Date: March 11, 2025 at 15:10 To: recreationcmte@lexingtonma.gov, selectboard@lexingtonma.gov, townmanager@lexingtonma.gov USE CAUTION: This email came from outside the Town of Lexington. Do not click links, open attachments or respond to the email unless you recognize the sender, you are expecting the communication and you know the content is safe. Dear Members of the Recreation Committee, Members of the Select Board, and the Town Manager, Please see my attached letter regarding re -purposing the Original Harrington School to avoid future overrides. I would like to submit this letter for the Town record. Please acknowledge receipt of this email and the attached PDF file. Thank you, Vida Baterina Hom Lexington Resident since 1977 175 Grove Street Lexington MA 02420 March 11, 2025 Lexington Recreation Committee Lexington Community Center 39 Marrett Road Lexington, MA 02421 RE: 1. Let's avoid overrides! 2. Original Harrington School is an asset to meet MBTA Communities Act Infrastructure Needs Dear Recreation Committee Members: Lexington is facing a major population change as a result of Article 34. Even the rollback of multifamily dwellings via the proposed Article 2 still promises a significant increase in population. Multiple development plans already before the Planning Board underscore the need for more infrastructures at a great cost to our town. It is prudent that Lexington puts a moratorium on razing our current existing assets, such as the original Harrington School, so these can be repurposed for a drastically changed town. The original Harrington School can be used for: • Lexington Public Schools' student capacity • Lexington Community indoor recreation spaces (the existing Gymnasium / Auditorium / Stage space is great for this, plus the many rooms) • Lexington Community meeting places & Library resources • Housing, similar to the condos at the original Parker Elementary School, apartments at the original Franklin Elementary School, condos at the original Hancock School, condos at the original Muzzey Jr. High School o Housing can be targeted to Senior Housing and Low-income Housing • Arts and Music education facilities, similar to Munroe Center for the Arts at the original Monroe School • Other education facilities, such as The Waldorf School at the original Adams Elementary School Destruction and disposal of this massive building will also result in severe negative environmental consequences. The Town and Recreation Committee should care about materials disposal and the environment. There are other possible sites that do not require demolition that can be used for baseball/soccer fields. For example, the undeveloped municipal lands off of Marrett Road near Clarke Middle School and the Community Center. Taxpayers do not want yet another override, to "replace" a school that we already have. Ubiquitous in the news media are the economic uncertainties due to what is happening at the Federal and State levels. US DOGE slashing jobs, grants, Social Security, Medicaid and Medicare. Trade tariffs, inflation, war. Lexington committees and boards, as fiduciaries, must preserve, not waste, our assets and exercise spending restraint. Do not demolish the original Harrington School just to have landscaped ball fields, when there are other, wiser, options. Sincerely, Vida Baterina Hom Lexington Resident since 1977 cc: Lexington Select Board Lexington Town Manager 175 Grove Street Lexington MA 02420 March 11. 2025 Lexington Recreation Committee Lexington Community Center 39 Marrett Road Lexington. MA 02421 RE: 1. Let's avoid overrides! 2. Original Harrington School is an asset to meet MBTA Communities Act Infrastructure Needs Dear Recreation Committee Members: Lexington is facing a major population change as a result of Article 34. Even the rollback of munitamuy awemngs via the proposea ,articie z sun promises a signmcant increase in population. Multiple development plans already before the Planning Board underscore the need for more infrastructures at a great cost to our town. It Is prudent that Lexington puts a moratorium on razing our current existing assets, such as the original Harrington School, so these can be repurposed for a drastically changed town. The original Harrington School can be used for: • Lexington Public Schools' student capacity • Lexington Community indoor recreation spaces (the existing Gymnasium ! Auditorium ! Stage space is great for this, plus the many rooms) • Lexington Community meeting places & Library resources • Housing, similar to the condos at the original Parker Elementary School, apartments at the original Franklin Elementary School, condos at the original Hancock School, condos at the original Muzzey Jr. High School Q Housing can be targeted to Senior Housing and Low-income Housing • Arts and Music education facilities, similar to Munroe Center for the Arts at the original Monroe School • Other education facilities, such as The Waldorf School at the original Adams Elementary School Destruction and disposal of this massive building will also result in severe negative environmental consequences. The Town and Recreation Committee should care about materials disposal and the environment. There are other possible sites that do not require demolition that can be used for basebaltlsoccer fields. For example, the undeveloped municipal lands off of Marren Road near Clarke Middle School and the Community Center. Taxpayers do not want yet another override, to "replace" a school that we already have. Ubiquitous in the news media are the economic uncertainties due to what is happening at the Federal and State levels. US DOGE slashing jobs, grants. Social Security. Medicaid and Medicare. Trade tariffs, inflation, war. Lexington committees and boards, as fiduciaries, must preserve, not waste, our assets and exercise spending restraint- Do not demolish the original Harrington School just to have landscaped ball fields, when there are other, wiser, options. Sincerely, Vida Baterina Hom Lexington Resident since 1977 cc: Lexington Select Board Lexington Town Manager From: Peter Coleman pcoleman@lexingtonma.gov (J Subject: Pickleball at Gallagher Date: March 13, 2025 at 14:10 To: Kathleen Lenihan klenihan@lexingtonma.org, Julie Hackett jhackett@lexingtonma.org, Naomi Martin nmar in@lexingtonma.org, Eamonn Sheehan esheehan@lexingtonma.org Cc: Steve Bartha sbartha@lexingtonma.gov, Kelly Axtell kaxtell@lexingtonma.gov, Recreation Committee recreationcmte@lexingtonma.gov, Melissa Battite mbattite@lexingtonma.gov, Peter Coleman pcoleman@lexingtonma.gov Hello, As we prepare for the upcoming spring season, this email is an annual reminder that pickleball is not allowed at the Gallagher Tennis Courts. The Recreation Committee came to this decision at the September 20, 2023 Recreation Committee meeting and the memo that was issued in October 2023 on this issue is attached to this email. Thank you for your continued cooperation and understanding. Thanks, Peter Peter Coleman, CPRP, CPSI, CYSA I Assistant Director of Recreation Spring & Summer 2025 Program Registration 1 -Tuesday, February 251—h at 6am! Town of Lexington Recreation and Community Programs A: 39 Marrett Road Lexington, MA 02421 P: (781) 698-4803 1 F: (781) 861-2747 .,;11 2-rO: Lexinciton o Creating Community Through People, Parks & Places When writing or responding, please be aware that the Massachusetts Secretary of State has determined that most email is a public record and, therefore, may not be kept confidential. PDF Memo to LPS re pickleb... her.pdf