HomeMy WebLinkAbout2025-03-13-LBAC-minTown of Lexington
Bicycle Advisory Committee-03/13/2025
March 13, 2025 / 7:00 PM / Parker Room
Members present: Tom Shiple, Jonathan Bernays, Dave Armstrong, Jim Cadenhead, Jonathan
Schwarz, Suzan Chen
Also present: Mike Tabaczynski, Jay Abdella from the Economic Development Office
1. Meeting minutes from February 6 meeting
Approved
2. Wayfinding Sign Project update - presented by Jay Abdella
Some signs moved, others removed. Kiosk at Grain Mill Alley will be in a spot where people
can congregate without blocking access. Budget doesn’t allow for additional signs at Hartwell
Ave and Westview St as requested. Meriam St sign moved over towards Visitor Center for
visibility. Questions about the cost of replacing the map panel on the kiosk. Kiosk at Grain Mill
Alley will be next to the bench, not under the tree on the right as it was previously.
Mural project overview - starting with Lexington Center. Collaboration between Center
Committee, Historical Society, and Economic Development. Designed to bring art into the
center, allow pedestrians and bikers to linger as well as to increase foot traffic. Safety aspect -
adding to a culture of slowing down and calming traffic. Initial murals will be on columns on the
back of the depot. Project would begin installation in June and completed in July. One lane
cordoned off while being installed. Note from Jim about heavy traffic in this area especially in
the summer, and would it be possible to avoid the highest traffic times. Jonathan Bernays
suggests active guidance via lines painted along the bikeway to indicate where viewers should
stand. Discussion around the possibility of painting the bikeway green there and if MBTA
permission would be required. Other discussion around if it’s a great place to have a mural at
all given the traffic.
East Lexington murals - 3 locations, Berman’s, Busa, and Shops at 135-145 Mass Ave. Goal is
to boost foot traffic from the bikeway to nearby businesses. Painting in May and installation in
June/July. For the Berman’s trailer, one lane of the bikeway will need to be cordoned off for one
week. Dave asked about a bike rack at Berman’s and if that would be part of the work.
3. Worthen Road Working Group update - Jim
Met with Town Manager’s office. Trying to list the Worthen Rd area listed as a school zone,
which would come with a speed reduction during school hours. Longer term, looking at adding
a multi-use bikeway/shared path along the eastern side of Worthen (high school side). DPW
has done a basic assessment and says the path would be feasible. Dave adds that adding
painted bike lanes in Worthen itself would not be possible according to DPW at the current
width. Motion proposed and passed to add committee support for the idea of moving forward
with the school zone idea. Tom discussed the notion that parking on Worthen for students is
considered sacrosanct.
4. Bike Safety Working Group - Jonathan Bernays
Discussion of a new working group to identify and propose solutions for safety issues for
cyclists. Motion proposed and passed to adopt the charter with slight modifications
5. Bikeway Block Party Endorsement by LBAC - Jim
Looking to repeat the block party again, September 14th. Motion to endorse the event again
raised and passed.
6. Liaison Reports
Tom Shiple as liaison to Planning Board - 3 Militia Way project removed battery charging from
central bike parking for liability concerns. Bike Parking Working Group submitted some
suggested changes to the bylaws but Town has been too busy to get those changes in for
Town Meeting. Postponed for now. Most of these changes can be enacted by Planning Board
with a public meeting, thinking about asking for that once the current spate of housing projects
are through the board.
7. Other Business
Friends of Lexington Bikeways - March 23, Coffee on the Bikeway. Park near Seasons 4.
Hoping for 6 during the year. Will also have a presence in the Patriots Day Parade. Looking for
volunteers for Bike to Work Day again as well. Town has several Safe Routes to Schools
projects they’re working on. Will be adding Bicycle Skills WIN blocks at Clarke this year,
eventually hoping to expand to Diamond.