HomeMy WebLinkAbout2025-03-13-GCC-min
Greenways available. are brochures when heads a give will eH audit. trail the for and signups volunteer for links send will He summer. the over holders map refill and trails check to
volunteers for asked Keith :reminder refills holder Brochure and Audit Sign Trail Spring soon. forms the get to expects she said Peggy Bikeways. Lexington of Friends the with tables
and tents share will GCC volunteered. Daisy and Bobak, Bob, shifts. hourly for volunteers for asked Keith pm. 3 to am 10 24, May Saturday Day, Memorial of Saturday Day Discovery am.
6 at rrivea will Daisy and Bob, Keith, up. setting with help for is need Real breakfast. the during hand on be will and bagels up pick to offered has Stephen Depot. the behind place
take will breakfast The am): 9 - 6:30 (~ 16 May Friday, Breakfast: Bikeway ngton.Lexi East in pm 1 is off Step Bobak. and Keith, Bob Daisy, be will marchers parade GCC : 19 April
Saturday, Parade, Day Patriots maps. out hand and network, ACROSS the about talk public, meet to good a provide should fair The LHS. at event the cover will Bob and Keith :pm 2-10
Fair, Sustainability LexCan 22 March Concord. and Arlington into signs route of extensions for allow Road Battle the of section Lexington the of ends both at signs route-end the that
mentioned Keith week. next signs route up put to begin will Bob and Keith signs: Road Battle on Update Lexington. ACROSS and committee the about more learn to meeting the on in sitting
was who Frohman, David introduced He opening. member GCC the for candidates possible four were there that mentioned Keith Reports/Updates: member. voting-non a as Mike of correction
following approved were notes meeting 13 February The Votes: Frohman David Tabaczyński, Mike Others: Liaison) Board (Select Pato Joe Kenyon, Susan Zoom: Via Perkins Stephen (Chair),
Ohmart Keith Moshiri, Bobak Liu, Daisy Hausslein, Bob Enders, Peggy present: Members Committee Zoom Via Or Building Office Town Room, Parker pm; 6-4 2025 13, March Minutes Committee
Corridor
together get Peggy email? what using owner/admin, be would who around, replaced. be to needs admin current if tyresponsibili the off hand to how about asked Keith site. new the
about publish can Old page. new the about information publish can old the but address; email old an using it build had administrator the deleted; be can’t FBI current The organically.”
“flow would it undertaking, small a be would Facebook a having feels she Susan idea. good a be might postings, cross allowing trails, regional other connect could a mentioned
was It followers. 600 ently are there information; closure trail pictures, providing routes, the to related solely was The postings. inappropriate two or one been there page; Lexington
ACROSS an is already there members reminded Susan moderation. of level low a thwi public the from feedback receive information, exchange to being of the likes he Mike asked. he
that, comfortable we are active; the to of investment of level the about asked Keith etc.). do, can members group what do, can moderator the what (e.g., presence Facebook Lexington
ACROSS for various of committee the review to spreadsheet a together put Mike :Goals Facebook of Discussion needed. permit the determine and at terrain the view to walk a do
to Karen on waiting still is he Keith Brook. Vine Lower and G Route to Street Webb Pierce, Solomon up picks trail new the Meadows, Great Arlington From 22: Route of map the showed
He Brook. Vine Lower and Meadows Great Arlington between ctionconne the provide to is explained Keith Connector: Pierce Solomon Proposed• survey. boundary a about to Karen on waiting
is He surveying. boundary the along move to funds donation Waterstone the of portion a use would ideally, that, Keith 8/Concord Route• K. Route overlapping and up linking plan,
Bowman of map a showed Keith place. can build boardwalk when about stewards other and him meet to need 15, April be Grant Don Keith rdwalk).boa of $3K about be Bowman for
build trail the added He project. Avenue Concord the for source funding reserve to wiser be might it months; six might release Waterstone the Mike available. not is work trail
for donation Waterstone $30K the from funds event the in would Fund Trust Abrams the Susan boardwalk, the for funding about discussion a In Saturday. members commission for walk
a be there and approved, been has the Stephen (Keith/Stephen): Update 3/Bowman Rte• projects: development route current of review Continuing Business Ongoing
with Enders Recorder: Parker the in pm 6-4 10 be will Meeting Next pm. 5:30 at adjourned was meeting The benches memorial of idea the and brochure new the :agenda
eth for Two account. Lexington ACROSS Instagram an creating and hashtags mentioned Stephen it. review to