Loading...
HomeMy WebLinkAbout1970-12-14-CPSSR-rpt.pdf REPORT OF COMMITTEE ON PROCEDURES OF STREET AND SIDEWALK RECONSTRUCTION PURPOSE To enable the town to more properly meet the needs of its' citizens for an adequate street and sidewalk reconstruction program. To enable citizens to better understand the street and sidewalk recon- struction program. To enable those citizens who are directly affected by street and sidewalk construction through the physical improvements to their neighborhoods and by the burden of additional improvements and betterments taxes, thereon, to have a more direct voice before the actual contracts are awarded and the reconstruction undertaken. To establish a more realistic annual Capital Expenditures Budget To make better use of the Engineering Services and the Engineering Department and the annual expenditures therein. To provide for a more rapid acceptance of new streets, thereby allowing for better care and maintenance of the town, which will in turn prevent more costly reconstruction at a later date. Revised 12/.14/70 -2- PLAN PHASE 1 PUBLISH STREET AND SIDEWALK LIST HOLD PRELIMINARY JUNE HEARING In the Spring the Selectmen will decide on the list of streets and side- walks to be considered for reconstruction, publish the names of these streets and sidewalks, and set dates in June for preliminary hearings for all interested citizens The purpose of these preliminary hearings will be to obtain information from interested parties regarding need for improvements and suggested major design features Information as to probable design will be provided by the Town Engineer to the extent such information can be made available without special surveys or detailed plans PHASE 11 PREPARATION OF PRELIMINARY PLANS During the summer months the Town Engineering Department will prepare preliminary plans based on a current field survey of the streets and sidewalks to be reconstructed. The design will take into account the aesthetic as well as engineering problems, including proposed tree plant- ing and landscaping. Design criteria will be flexible and may include sidewalk and slope easements to preserve natural features, varying width of streets, sidewalks, and grassed areas, etc, consistent with safety and good engineering practice. PHASE 111 FALL HEARING ON PRELIMINARY PLANS In the fall , there will be public hearings based on the completed pre- liminary plans No later than one week before the Fall Hearings the -3- proposed streets or sidewalks to be reconstructed will be staked out with orange markers in the ground and markers on those trees recommended for removal. PHASE 1V REVISION OF LIST On the basis of those hearings the Board of Selectmen will determine which projects are to be included for recommended Town Meeting action, and will establish the general design criteria for such projects. PHASE V PREPARATION OF FINAL PLANS TOWN MEETING ACTION 1 1 Based on the fall hearings and the established design criteria, final con- struction plans will be prepared When completed the plans will be sub- mitted to the Board of Selectmen for preparation of an article for the appropriation of construction money by the Town Meeting. Detailed cost estimates will be made or, if possible, bids will be taken prior to the Town Meeting, so that the exact amount of funds required can be determined IMPLEMENTATION 1 Declare a moratorium on the usual annual street and sidewalk construc- tion program, except for those sidewalks essential for the safety of school children. 2. The 1971 Town Meeting should have an article specifically allocating funds for the design and engineering of streets and sidewalks proposed for reconstruction. A similar article should be repeated annually based on a projected long-range program for street and sidewalk reconstruction. 4 0 -4- n. 3. The plan should be put in operation for actual construction moneys to be appropriated by the 1972 Town Meeting and annually thereafter 4. Construction moneys to be appropriated should include sums required for tree planting and landscaping, as proposed in the final plans pre- pared in Phase 1V of the plan. Revised 12/14/70