HomeMy WebLinkAbout1970-09-21-CPSRUE-min.pdf Memorandum September 24, 1970 COMMITTEE ON PROCEDURES OF STREET RECONSTRUCTION AND UNDERGROUND WIRING 1 Meeting was held on September 21, 1970 at Mr. Eisenberg' s home. Present Mrs. Natalie Riffin Mr. Hugh M. Chapin Mr. Herbert W. Eisenberg 1. Those present agreed that Mr Eisenberg would be Chairman of the Committee. Mr Abbott had called earlier in the day with the same suggestion, that Mr. Eisenberg be Chairman, as well as to indicate he would be unable to attend the meeting but would be available for any of the work on underground wiring. 2. After some discussion concerning the underground wiring problem it was suggested that we ask Mr. Abbott and Mr. Graf to obtain as much information as possible for presentation at the next meeting of the Committee. 3. The rest of the meeting concerned the discussion of possible procedures and questions connected with street reconstruction. One question was, "Does the money for the design and engineering of the streets come out of the funds allocated under a separate article by the town meeting for the reconstruction of streets or out of the regular engineering budget?". 4. A suggestive procedure for preliminary investigation might be that first there be a notification of the street or streets to be reconstructed similar to that which is now held At this point the Community could make their feelings known concerning the proposed reconstruction. Next there would be a hearing with preliminary plans based on a definitive survey and indicating major work to be done, at which time the Community would have a better idea of the actual work to be done and trees to be removed. Finally, there would be a hearing based on final construction plans and the town meeting would then be asked to vote reconstruction money based on those final or possibly revised final plans. Please note this is not the recommendation of the Committee but only a suggestion as a basis for starting our investigation. - 1 - f L Memorandum September 24, 1970 COMMITTEE ON PROCEDURES OF STREET RECONSTRUCTION AND UNDERGROUND WIRING 5. During the meeting a call was received concerning the question of Downing Road at which there is a current problem concerning trees to be removed due to reconstruction. Natalie Riff in said she would attend the tree hearings on behalf of the Committee and would report on the situation. It was agreed that the Committee would be available to the selectmen in this situation if so desired, but had no recommendations concerning the current problem. 6. It was next suggested that we contact the individuals or Boards prior to our next meeting for their reaction on street recon- struction. Mr Chapin would contact the Appropriation Committee and Capital Expenditures Committee; Mrs Riff in would contact the Planning Board ; Mr. Eisenberg would talk with Mr. O'Connell and Mr. McSweeney. 7. The next meeting was set for Monday, October 5th at 8 45 P.M. at 55 Hancock Street. ectfully submitted, Rejsp �E 7CtEct] ..,AWs)1/4 Herbert W. Eisenberg INE/h - 2 -