HomeMy WebLinkAbout1940-08-12298
SELECTMEN t S MEDT ING ,
August 12, 1940.
A special meeting of the Board of Selectmen was
held in the Solectmen's Room, Town Office Building, at 4150
P.Y. Chairman Giroux, and Messrs. Saran and Potter were
present. The Clerk was also present.
The Clerk was instructed to call a meeting of the
Ambulance committee appointed to establish rales and regulations
committee for the use of the ambulance for Thursday evening, Aug-
ust 15 at 8100 P.M.
Mr. Beach appeared before the Board. The Chairman
Complaint told him that he had received a complaint that the W.P.
res W.P. A. men working on the North Hancock Street drain were
A. mene using bad language, etc. He requested Mr. Beach to talk
to the men about the complaint.
Letter was received from Chief Edward W. Taylor
suggesting that the following equipment.be purchased for
the sambulance t
Short Wave Radio Receiving Set '
1 Loader Light ever Rear Door
No 1 First Aid Kit
4 Rubber Sheets 72" x 108"
12 Bed Sheets 45" x 90"
12 Pillow Cases
4 Feather Pillows- 18" x 28"
6 All Wool Blankets 60" x 80" (singles)
12 Huck Towels 12"_ x 18"
12 Face Cloths 12"
6 Bath Towels 22" x 44"
The Chairman said that he had talked to the Town
Accountant about these supplies, and it had been decided
that they could be paid for from the Unclassified Account.
Supplies It was decided to purchase all of the supplies, with the
for am- exception of the short wave radio set and the loader light
bulance over the rear door, and to charge the expense to the
Unclassified Account.
The Chairman said that James Guthrie used to be in
charge of the welfare crew and was paid fifty cents per
hour. Mr. Guthrie had been ill, but is now able to return.
Mr. Potter moved that Mr. Guthrie be returned to his former
position at the same rate of pay. Mr. Sarano seconded the
' and it was so voted.
1
u
299
A letter was received from Metcalf & Eddy recommend-
ing the issuance of a change order on Contract B., (Sal-
vuccl contract) Vine Brook Drainage Project, granting an Change
extension of time for the completion of the work included order*
In the contract, of 240 calender days. Mr. Raymond recommend-
ed that the change order be approved.
Mr. Potter moved that the change order be approved and
signed. Mr. Saran seconded the motion, and it was so voted.
The meeting adjourned at 5:02 P.M.
A true record, Attests
Clerk.