HomeMy WebLinkAbout1938-01-10166
SELECTMEN'S MEETING
JAN. 10th, 1938. '
A special meeting of the Board of Selectmen was held
in the Selectmen's Room, Town Office 3uilding, at 7:30
P.M. Messrs. Ferguson, Giroux, Potter and Ross were
present. The Acting Clerk was also present. Mr. Giroux
acted as Chairman of the meeting. Eleven members of the
Town Meeting Members' Association were also present.
Mr. William C. Paxton, Jr., Supt. of the Highway
Division, and Mr. John W. Raymond, Jr., Supt. of Public
Works appeared before the Board. The budget for 1938 for
the Highway Department was discussed as follows:
Highway Maintenance
General Overhead $11,292.
Mr. Paxton stated that this item included supervision,
clerical help, office supplies and vacation pay for the
entire Highway Department. Last year this item on the
revised budget amounted to 08,837.00 and part of the
Highway
increase this year was due to the establishment of a
Department
Highway Road Machinery Account for which y200.00 a month
Budget.
'
was included in this item this year.
In regard to salaries, Mr. Paxton stated that he was
asking an increase for the clerk from $14. to $20. per
week and for the Assistant Superintendent from x`'30.00 per
week to $40.00. He stated that he felt both of these
persons were entitled to the salary increases and asked
for consideration in regard to this matter.
Mr. Giroux asked Mr. Paxton if it had been necessary
for him to lay off any regular men, due to lack of funds,
that had to go on relief on this account, and Mr. Paxton
stated that he had not laid off any of the regular men
in his department.
General Work $14,500.
Mr. Faxton stated that this amount was the same as
requested last year for this item. No questions were
asked in regard to the matter.
Maintenance of Road Surfaces $26,738.00
Mr. Paxton stated a last year he had asked for
$25,600. but had received an appropriation of approximately
$14,000.00, for this item. He stated that work should be
done on East Street, Oakland Street and Percy Road, and
if this work was not done, these streets would no longer
be a maintenance problem, but would become a reconstruction
'
problem.
C
L
Beedi_n_and Loaming $1500.00
Mr.Maxton sued that this was a new item this year
due to requests received during 1937 for seeding and
laaming the shoulders of roads in front of newly constructed
properties and seeding shoulders of roads which were con-
structed during the previous fall. There was considerable
discussion in regard to this item, it being the opinion
of some of the members of the Executive Committee that
property owners,should take care of grass plots adjoining
their own property.
Dumps and Ashes $2100.00
axton stated that the man who is taking care of
the dumps at the present time is considering retiring and
in this budget the salary for this work has been increased
to t22.00 per week. There is also an amount included for
"No Dumping" signs. There was little discussion in regard
to this item.
Traffic Regulation and Control 02225.
Mr. -Paxton s-taVecT that during the last year, Mr.
Raymond had investigated the stop sign problem and they
have therefom included an item for 17 stop signs at a
total cost of $160.00 in this appropriation. There is
also an amount of $175.00 for a traffic marker to be
used painting the solid white lines on the center of
streets. Mr. Paxton said that every year additional
regveests come in for these lines and he felt that money
could be saved by having a machine to do this work.
Under this item, the group discussed the matter of traffic
signals at length and asked Ti1r. Raymond several questions
in regard to putting the lights in proper condition so
they could receive the approval of the State Department.
Street Signs $550.00
r. ?axton.stated that the increase requested over
the 1927 appropriation would enable the department to
Continue on with the street sign program.
167
Drainage Maintenance
$3600.
'
Mr. Paxton stated that this estimate
the same as last year. This budget
was approximately
included flushing
pipes and cleaning catch basins, etc.
No questions were
asked in regard to this item.
Sidewalk Maintenance
$2800.00
Mr. Paxton sa that this item
was also approximately
the same as last year, and there was
no discussion regard-
ing the matter.
Guard Rail & Fence Maintenance
$300.00
. Paxton said that t ere was
no change in this
appropriation, the amount being just
enough to take care
of painting and repairing fences.
C
L
Beedi_n_and Loaming $1500.00
Mr.Maxton sued that this was a new item this year
due to requests received during 1937 for seeding and
laaming the shoulders of roads in front of newly constructed
properties and seeding shoulders of roads which were con-
structed during the previous fall. There was considerable
discussion in regard to this item, it being the opinion
of some of the members of the Executive Committee that
property owners,should take care of grass plots adjoining
their own property.
Dumps and Ashes $2100.00
axton stated that the man who is taking care of
the dumps at the present time is considering retiring and
in this budget the salary for this work has been increased
to t22.00 per week. There is also an amount included for
"No Dumping" signs. There was little discussion in regard
to this item.
Traffic Regulation and Control 02225.
Mr. -Paxton s-taVecT that during the last year, Mr.
Raymond had investigated the stop sign problem and they
have therefom included an item for 17 stop signs at a
total cost of $160.00 in this appropriation. There is
also an amount of $175.00 for a traffic marker to be
used painting the solid white lines on the center of
streets. Mr. Paxton said that every year additional
regveests come in for these lines and he felt that money
could be saved by having a machine to do this work.
Under this item, the group discussed the matter of traffic
signals at length and asked Ti1r. Raymond several questions
in regard to putting the lights in proper condition so
they could receive the approval of the State Department.
Street Signs $550.00
r. ?axton.stated that the increase requested over
the 1927 appropriation would enable the department to
Continue on with the street sign program.
167
Road Machinery Account $15,450.00
axton said at in figuring this budget, he had
not considered the turn -in values of equipment which
might be turned in. Included in this budget was a new
truck chassis, $900.00; a gas roller for t1500.00. He
stated that at the present time the department has a 5 -ton
gasroller and in order to make it run about $300.00 would
have to be spent on it and he felt that it had outlived
its usefulness. He felt that a smaller roller would be
better for patching work. Mr. Paxton stated that the Water
Department tractor hoist had been of great value to the
Highway Department, but with W.P.A. work, water and sewer
installation and drainage work, the machine was being
used a great part of the year, and the Highway Department
would like $20000. to purchase that piece of equipment.
They were also requesting $225. for a new paving breaker,
0225. for a brush cutter and $4,000.00 for a snow loader.
There was considerable discussion in regard to the purchase
of a snow loader and the members of the committee asked
Mr. Paxton and Mr. Raymond several questions in regard to
the matter.
Development of Loam Supply $1250.00
Mr. Paxton said that this figure included all the
loam estimates for constructiox, work, Chapter 90 work and
also for the Park Department. Mr. Paxton stated that Mr.
Raymond felt there was 5000 cubic yards of loam which
could be stripped from the Town farm property for about
$.25 a yard and left in a stock pile. If this is done,
when the departments took the loam, they would pay x.50
per yard for it. Mr. Raymond had tests taken of the loam
and found that it was very satisfactory.
Betterment Sidewalk Construction $1800..00
Mr. Paxton said that this was merely an estimated
figure as this work depended entirely upon the number of
requests regeived during the year.
Sidewalk Reconstruction $5250.00
Paxton sta e_.that Mass. Avenue was in very bad
shape in certain sections and this estimate included work
on various sections from the East Lexington Station up
to the High School where sidewalks are needed. He stated
part of this work would be granolithic and part of it
bituminous surfaces. He seated that this might possibly
be done as a W.P.A. project and the appropriation would
then be approximately $2800.00 for materials and trucking.
Highway Cons. — Reed Street 90000.00
Mr. Paxton statethis appropriation would
complete the work already started on Reed Street.
Curbing Construction $4400.00
Paxton stated that this item covered the installa-
tion of curbing; where sidewalks were built. He stated that
if this were done as a cd.P.A. project the cost would be
approximately$?2900. for materials and trucking.
1
FJ
Charles Street and Oak Street Charles St. - 411,000
axton stated that this was requested to serve
' the Liberty Heights section. He stated that both streets
ere n very oo cond t o ut h t w u 8
or t e_conSt uc ion , f 's ree jnajIu&Rui9-���� e 8
at r sewer and as nta at on an a great dea f 'pre-
lim nary work wou d be required. Charles Street has water,
sewer, etc. but the street is very rough and Mr. Paxton
thought that it would be better to construct this street
as the entrance for the Liberty Heights residents. The
Committee discussed the possibility of the construction
ofeither of these two streets at some length.
Follen Road 8,000.00
fir. axton stated that there was a bad drainage
condition on Follen Road at the Church and it is very
Icy and slippery there in the winter time and has to be
constantly sanded. Mr. Paxton said that he had worked
up this street for a two year program. At the present
time he was requesting funds to rebuild it from Mass.
Avenue up to the end of the existing rubble masonry wall,
a distance of approximately 750 feet.
There was considerable discussion in regard to the
construction of these above named streets and Mr. Giroux
suggested that the matter be taken up ht the Precinct
meetings and the Board advised of what the Town Meeting
Members thought should be done in regard to the street
' construction program.
Mr. Paxton stated that there would also be 6600.00
needed to finish the construction on Hibbert Street.
Mr. Paxton and Mr. Raymond retired at 9;50 P.M.
Mr. James H. Russell appeared before the Board in
regard to the appropriation for the Board of Retirement.
Mr. Cutter asked Mr. Russell how many persons had come
into the system and he replied that there were 115 old
employees and four new employees that came in since the
system started.. Mr. Russell explained that the item for
Pension Accumulation Fund was necessary because there
were a number of employees who were in the service of
the town anywhere up to fifty years prior to July lst
and they will retire under a pension for prior service.
Mr. Russell stated that it was impossible to tell how
long the Town would have to contribute to the prior
service fund because there is no way of telling how long
these men will stay with the town. The accrued liability
item is figured so that it will not have to continue over
twenty years and it will probably be less than that.
Several questions were asked in regard to the Retirement
Act whieh Mr. Russell answered. The total appropriation
requested by the Retirement Board is $12,308.22.
Mr. Russell stated that he had estimated an
approximate tax rate for 1938 based on the budgets as
submitted and using last year's taxes, and the figure
169
Retirement
Board
budget.
170
he arrived at was $47.50. He stated that $230p000. of
the requested appropriations could be bonded which would
bring the estimated tax rate down to $37.00. This matter
was discussed at length, particularly.with reference to
the town's bonding policy.
The following budgets were also considered:
Memorial Day 0250.00
Dog Clinic 350.00
Patriot's Day 500.00
Slaintering Inspector 700.00
Unclassified 1000.00
Pensions - Fire Dept. 1107.81
Pensions - Police Dept. 1095.00
Wire Inspector 710.00
The meeting adjourned at 11:30 P.M.
A true record, Attest:
amon.
Acting Clerk.