Loading...
HomeMy WebLinkAbout1997-01-14-DAC-min.pdf Design Adm�,y�'sor Committee 1.140%97 Prepared by Karen Bechtel ( ?resent: DAC.John Frey Bruce Creager,Carl Oldenlrg,Tom Coffman,Barbara Hulsizer,Betsy Whitman,Steve Hurley,Karen Bechtel,John Ellis and Stacey I (associate members) Others:John Davies,Planning Board Liason;Betty Edison,Board of Selectmen Liason;Betty Clark,Civic Improvement, LF&GC Eason Minutes of 12.10.96 will be provided for approval at next meeting 1. Sign Guide:Letters of approval received from the Lexington Center Committee and the Lexington Chamber of Com- merce.The DAC voted to endorse the letters and take the sign guide to the Selectmen. 2. Flag:Dick Vyce has a suggestion for keeping the flag on the green permanently unfurled.He will send the suggestion to John.John may refer the suggestion to the DPW's George Woodbury 3. Sign:4 Hartwell Place,Hughes Aircraft,Joe Messier and David Lovering The building is very difficult to locate since it is impossible to locate from Hartwell Ave.Two 36"x 24"h signs with 3" posts and 60"total sign height were requested.They would be white signs with navy and black lettering.The signs seemed inconsistent in layout and therefore somewhat confusing.It was suggested that: the address be in a colored band at the bottom of both signs in white letters 4 Hartwell Place be in upper and lower case letters instead of all caps Reconnaissance Systems be on one line the layout of the two signs be consistent Itek use the flush face sign rather than the framed detail The DAC approved the use of two signs,and requested that the height and location of the building sign be passed by John before presentation to the Board of Appeals. 4. Sheraton Site Plan: Drawings were supplied to the DAC,which the Sheraton plans to use in applying for a special permit for which they need site plan review The DAC felt that it could not make any recommendations based on these very old drawings.These drawings do not include the Route 2A work which the Sheraton will have to consider in it's plans.It was not clear whether these plans had been approved in concept initially-John Davies will talk to Bob Boyer.It was suggested that minutes from the 1989 meeting when these drawings were"approved"be obtained.There were several areas of concern which these drawings did raise.Areas of concern are: the leveling of the high point arbitrary tree planting lack of sensitivity to topography and vegetation 80's style of building-potpourri look the design is not coordinated with the Marret Rd reconstruction-quoted from the Zoning Bylaws p.21 re:conservation,"(b) .is designed in a manner that is compatible with the existing natural features of the site and is compatible with the characteristics of the surrounding area." civil engineering issues (run off will be altered because of 2A construction signage issues lighting issues Cranberry Hill was suggested as an example of scale and successful integration of parking into the landscape. John will report to the Planning Board (copying the Board of Appeals and the Conservation Commission) that the DAC feels that due to the lapse of time,these drawings are unacceptable,and new,up-to-date plans should be presented. 5. "Fresenius"National Medical Care Wall Sign,124 Spring Street,95 Hayden Ave: No one was in attendance from Fresenius.A 35'2"sign was proposed,which the DAC felt was much too large.In com- parison,we have rejected large signs which were proposed by the Chinese Church,HCHP and OUI-all in that area of Hayden Ave/Route 2 No site plan was presented by the requestor. 6. A Design Review Committee has been formed for Emery Park which includes 2 from DAC, 1 from the Center Commit- tee, 1 Chamber member,2 from Traffic Committee,2 Transportation,2 from Garden Club,2 from Friends of Emery Park.This ad hoc group will put together an RFP to a design firm to solicit a proposal.This will be done by June 1. 7 Vending Machine discussion on hold for Jack Nolan. February minutes:Tom Coffman