Loading...
HomeMy WebLinkAbout1996-01-31-DAC-min.pdf 1' a ern , Y".*pn Pof`, t, t.v u�4, m • Re: Design Advisory Committee Meeting January'(f, 1996 Attendees: Betsy Whitman, Carl Oldenburg,Bruce Creager Steve Hurley Betty Eddison, Karen Bechtel,John Frey,Tomm Coffan Prepared By: Tom Coffman •24A no, LA ffrt +x• The following items were discussed at the January 31, 1996 meeting. 1. December minutes were reviewed and approved. a% 4 2. Draft for Town report was reviewed and approved with minor changes. 3. Nextel sign on Hartwell Avenue: { Proposed Nextel sign for new Lexington Headquarters was presented by John Lawless. The committee provided the following comments. • 8'x 3' x 1 base is a generally acceptable size. • Sign should be externally lit only. • Located 10' back from property line. re*NIA AAA • Sign thickness dimension should be 8' or 9" • Committee would like to see the proposed materials. •l. Mfr 114"lit 1, • In an effort to help applicant with schedule John Frey will be available_n4 veyiew resubmission next week. 4. Emery Park update Steve Hurley stated thefeis fib news: 'In general, the DAC believes(tins presented the alternatives to all appropriate groups in town. The study group will meet to suggest an approach for a large'open nieefing to bring closure to project. A large open meeting might include 40 or 50 people. Estabrook Hall would be a good location. Study group will develop a written mission statement. 'P+, ' t . Study group meeting will be next Monday at 8:00 am at Steve Hurley's office. 5. Sign guidelines John,Tom, and Steve will meet.4t.S ve'salace to•diseuss guidelines with Clark Griffin of HDC. N)5 1 ,„ 6. New bench location thoughts: • Library in East Lexington • Visitor's Center • Fire Station in Bedford Street • Cemetery • Bus Stops • Ball Fields/Basketball Courts • Dick Spaulding's building next to Decelles. The town needs a master plan for locating future benches. 7 Next meeting February 13, 1996 TC/SCJ/PM-o109.DOC 2