HomeMy WebLinkAbout1996-01-31-DAC-min.pdf 1' a
ern , Y".*pn Pof`,
t, t.v
u�4,
m •
Re: Design Advisory Committee Meeting January'(f, 1996
Attendees: Betsy Whitman, Carl Oldenburg,Bruce Creager Steve Hurley Betty Eddison,
Karen Bechtel,John Frey,Tomm
Coffan
Prepared By: Tom Coffman
•24A
no, LA ffrt +x•
The following items were discussed at the January 31, 1996 meeting.
1. December minutes were reviewed and approved.
a% 4
2. Draft for Town report was reviewed and approved with minor changes.
3. Nextel sign on Hartwell Avenue: {
Proposed Nextel sign for new Lexington Headquarters was presented by John Lawless.
The committee provided the following comments.
• 8'x 3' x 1 base is a generally acceptable size.
• Sign should be externally lit only.
• Located 10' back from property line.
re*NIA AAA
• Sign thickness dimension should be 8' or 9"
• Committee would like to see the proposed materials.
•l. Mfr
114"lit 1,
• In an effort to help applicant with schedule John Frey will be available_n4 veyiew resubmission
next week.
4. Emery Park update Steve Hurley stated thefeis fib news: 'In general, the DAC believes(tins
presented the alternatives to all appropriate groups in town.
The study group will meet to suggest an approach for a large'open nieefing to bring closure to
project.
A large open meeting might include 40 or 50 people. Estabrook Hall would be a good location.
Study group will develop a written mission statement.
'P+, '
t .
Study group meeting will be next Monday at 8:00 am at Steve Hurley's office.
5. Sign guidelines John,Tom, and Steve will meet.4t.S ve'salace to•diseuss guidelines with Clark
Griffin of HDC.
N)5
1 ,„
6. New bench location thoughts:
• Library in East Lexington
• Visitor's Center
• Fire Station in Bedford Street
• Cemetery
• Bus Stops
• Ball Fields/Basketball Courts
• Dick Spaulding's building next to Decelles.
The town needs a master plan for locating future benches.
7 Next meeting February 13, 1996
TC/SCJ/PM-o109.DOC
2