MINUTES
( DESIGN ADVISORY COMMITTEE MEETING
August 14, 1990
Attending Walter Pierce, Tom Coffman, Barbara Hulsizer, Jack Eddison, and
John Frey, Chairman
1 No minutes were reviewed or approved as there was not a quorum.
2 The following four bench designs were reviewed for possible
inclusion as alternates in the Design Guidelines report
a) "CRESCENT" Style BKB, made by Sitecraft
Local Agent City Garden Products Inc
455 Watertown St.
Newton, MA.
617-965-8130
(Used at Senior Center at Old Muzzey School and at
Broadway Plaza in Arlington, MA.) Same as the old
"Macotta" bench.
b) "$' BENCH" made by Boston Design Group
100 Magazine Street
Boston, MA. 02119
617-442-6118
Comes in 4' , 6' , and 8' lengths 6' bench costs $423 plus tax,
anchors, shipping
c) "The PORTLAND BENCH" designed by Robert Perron for
Columbia Cascade (Timberform Restoration Series)
1975 SW Fifth Avenue
Portland, Oregon 97201-5293
503-223-1157
Local Agent Dr Play, Ron Packard
in Salem, N H.
603-893-2552
d) Lexington Battle Green Bench with precast concrete frame supports
and wood slats
(Could possibly be made by Town forces
during slack winter months? Molds could
be made from existing benches )
(continued)
Page 2
Comments B BENCH may be too short unless it can be made
in longer sizes than 4' (Later I found that it comes 6' and 8' too)
The Art Nouveau character of the Portland Bench
may not be the ideal character for Lexington,
though most liked it per se
John will get more information and costs on these
benches for review at next meeting Other suggestions
for benches are encouraged from anyone Please submit
by Sept 11th with as much info as possible including
cost
3 Review of Walter Pierce's re-write of Pages 5 6 7 & 8 of Volume II
of the Design Guidelines Report Generally, all of us liked the
re-write and thought it was much more "user friendly" Walter will
clarify the relationship between the Central Business District and
the Battle Green Historic District and the whole four pages again
with John Davies Most of us felt a map showing the districts
should be in Volume II Jack will see that Walter's 4 page re-write
gets to Bob Boyer for his further input
4 The Planning Board and Bob Boyer have not yet reviewed the Design
Guideline report The Planning Board has a meeting August 28th,
but it is doubtful we will have their comments before September
Discrepancies with Town Zoning By-Laws must be addressed before
report is published.
5 Some discussion was held as to how to incorporate DPW comments into
the Guidelines Report DPW points about durability of materials
and furniture and maintenance considerations were well taken, but
specific insertions into the text have not been recommended yet
6 Jack will work with Rick White in getting the outstanding comments
on the Design Guidelines draft from the Planning Board and others
7 A longdiscussion was held on how to implement a re-design of Emery
Park. Design competition possibilities, design costs, construction
costs, program writing, fund raising, were a few of the topics
John and Tom will try to come up with some rough design and
construction costs
8 Via phone to John Frey, John Vinton asked that his position on the
sign bylaw study subcommittee be reassigned to Rick Bechtel, since John
will not have enough time in the near future to work on it No action
was taken on this since Rick is on vacation.
( Meeting ended at about 10 25 PM
NEXT MEETING Tuesday, September 11, 1990 at 8 PM, Room 111
Respectfully Submitted John Frey