Loading...
HomeMy WebLinkAbout1961-12-19-CEC-min (2).pdf Meeting of C..pital Expenditures Cow ittee, Decem er 19, 1961, with John Carroll. D. Noyes, it, Looglyy, K, :ear sen, R. ;aoodberry, H. Souza (sec'y) and Mr. Carroll, Su°,t. of Public Works Depc,rtan.ut. Disc—scion of Public Works Capital Expenditure uOzet e,s revised by Mr. Carroll. tee. — kc: . Govt. will pnay a a) 48.9% of cost of 24" nim, Concord Ave. along ; alt:,a.ts St. to Standpipe. ,.n) 4. o;'o of onn sa..re o_ cost of M.IJC line, viatertorru to Waltham St. o) ,J, of en,ss. to Lenin town of 30" line from Arlington—LexiayLoo. 1 ,ice „f Vii, ed on estir ted co sts,the total cost will be $831,315, of which Lexington t a S a n.. ,1110 en4t. ' se ai. orce =37$,835. u nieee As ,+CAO 6, Toe voce,., L%:ti..c.,OL'v koonne,,.f ier 24" main to Lexington standpipe. The Air force can el. _r,,eus only t.,_ro-ct,.,r'1 an iacret:se i.0 rates. Their �a .)e a,..orvized over 10 years — period or wi-nob this amount is bonded. Me-v ar" now p€aria, 4/100 clt. ft; they will pay about 300/1)0 cu. it. Ir u: use vicre t}, tan their .anal tu:.sant of water, the excess reverts to tie 13i:/ca. f r%tc . I tney should leave, the re:caient:el will be paid in cash. The ,i-r force wiil pay 45.07b of actual cost plus the scuae interest we pay. i<nzJC will a. vertise ,;:e 3W' Mi. wi ,china a month and will probably start this • . ,+e will start this spria6, too. Our share of uii)C line will be gilde(' us over a 10—near ,period. Nor-taco. itc,.s — That accounts for difference between .ria 040,000 in Carroll'n Plana and $28 ,0f..,6,0id ueationned by Mrs. ..ere,1? 00,000 lor plans was voted so v >;.t we sho la get aefiaite plans eri esti: aates. The ',8.0,000 was an all inclusive figure. Actual cost could vary depending upon conditions and w.poa :S'Ln,,t town :aquas i t, wants, road size, ieaces, traffic control etc. Streets ^- Permanent street coastr°:ction is defined by Carroll as a public ray whir' me rtes reconstructing. .unary Streets -d 4321,000 worts, of street retlues .s nave been deceived this yeo,. . Ne charge 07.50 per front 2. ot; therefore receive 015. per front loot. TThL t-iwn assesses .actcal, cost up to $7,50 pe front foot maximum. The abutters ;say the wctuaal cost of their ova street, not as average based on total Street co simetion b the town. ftarroll is now trying to get accurate records to reter::ine w?nets, 'r this `4. 50/front ft. is too low a naaximu:a. Serer construction is chargees to the bbutters at a rate d.etea wined by the avere cost of sewer construction for the pc,. 1: five years. It is based on area sf rather than froata. e. Maximum area which can be used is front 150 ft. ; actual.ty a line is drawn 100 ft. back from front pro :ertfyline and the area within this part of the uo.verty is calculated to deteraine sewer construction assessment. :Jidewalks — cost anent H — ,5 ;.ler foot. On Grove 3t. , for exec:ple, part of the street is outside layout. The town can't build sir;ewalks on timxaub people's property. Severs — Watertown St. sewer will not be comi,lete until late in 1961 Pleasant it. to tL'a..vean sewer is delayed one ye .r beca-,se there wonlu be no e a pr 1': e i Seel engineering on Joodhaven sewer could not be done in 'E4t?� �� ��e.#� ut't�il �a�?ne 99v�. ust.n to 8xux Burlington dt. is increas,-d by w?u,0;.0 in order to to )der 128' a recon« time to Tarok h Mill Roan. DrLins*— h.tnuyfield Grain is needed. Du:..;) study — Fay Spofford fg 'Thorndike have signed contract to be completed is 90 days; thb report will be ale March 1. Carroll estimates an lac/nor- tor would coat about $$,0,000.