HomeMy WebLinkAbout1961-12-19-CEC-min (2).pdf Meeting of C..pital Expenditures Cow ittee, Decem er 19, 1961, with John Carroll.
D. Noyes, it, Looglyy, K, :ear sen, R. ;aoodberry, H. Souza (sec'y) and Mr. Carroll,
Su°,t. of Public Works Depc,rtan.ut.
Disc—scion of Public Works Capital Expenditure uOzet e,s revised by Mr. Carroll.
tee. — kc: . Govt. will pnay a
a) 48.9% of cost of 24" nim, Concord Ave. along ; alt:,a.ts St. to Standpipe.
,.n) 4. o;'o of onn sa..re o_ cost of M.IJC line, viatertorru to Waltham St.
o) ,J, of en,ss. to Lenin town of 30" line from Arlington—LexiayLoo.
1 ,ice „f
Vii, ed on estir ted co sts,the total cost will be $831,315, of which Lexington
t a S a n.. ,1110 en4t. ' se ai. orce =37$,835.
u nieee As ,+CAO 6, Toe voce,., L%:ti..c.,OL'v koonne,,.f ier 24" main to Lexington standpipe.
The Air force can el. _r,,eus only t.,_ro-ct,.,r'1 an iacret:se i.0 rates. Their
�a .)e a,..orvized over 10 years — period or wi-nob this amount is bonded.
Me-v ar" now p€aria, 4/100 clt. ft; they will pay about 300/1)0 cu. it.
Ir u: use vicre t}, tan their .anal tu:.sant of water, the excess reverts to
tie 13i:/ca. f r%tc . I tney should leave, the re:caient:el will be paid in cash.
The ,i-r force wiil pay 45.07b of actual cost plus the scuae interest we pay.
i<nzJC will a. vertise ,;:e 3W' Mi. wi ,china a month and will probably start this
• . ,+e will start this spria6, too. Our share of uii)C line will be
gilde(' us over a 10—near ,period.
Nor-taco. itc,.s — That accounts for difference between .ria 040,000 in Carroll'n
Plana and $28 ,0f..,6,0id ueationned by Mrs. ..ere,1? 00,000 lor plans was voted
so v >;.t we sho la get aefiaite plans eri esti: aates. The ',8.0,000 was an
all inclusive figure. Actual cost could vary depending upon conditions and
w.poa :S'Ln,,t town :aquas i t, wants, road size, ieaces, traffic control etc.
Streets ^- Permanent street coastr°:ction is defined by Carroll as a public ray
whir' me rtes reconstructing.
.unary Streets -d 4321,000 worts, of street retlues .s nave been deceived
this yeo,. . Ne charge 07.50 per front 2. ot; therefore receive 015. per front loot.
TThL t-iwn assesses .actcal, cost up to $7,50 pe front foot maximum. The abutters
;say the wctuaal cost of their ova street, not as average based on total Street
co simetion b the town. ftarroll is now trying to get accurate records to
reter::ine w?nets, 'r this `4. 50/front ft. is too low a naaximu:a.
Serer construction is chargees to the bbutters at a rate d.etea wined by the
avere cost of sewer construction for the pc,. 1: five years. It is based on
area sf rather than froata. e. Maximum area which can be used is front 150 ft. ;
actual.ty a line is drawn 100 ft. back from front pro :ertfyline and the area
within this part of the uo.verty is calculated to deteraine sewer construction
assessment.
:Jidewalks — cost anent H — ,5 ;.ler foot.
On Grove 3t. , for exec:ple, part of the street is outside layout.
The town can't build sir;ewalks on timxaub people's property.
Severs — Watertown St. sewer will not be comi,lete until late in 1961 Pleasant
it. to tL'a..vean sewer is delayed one ye .r beca-,se there wonlu be no
e a pr 1': e i Seel engineering on Joodhaven sewer could not be done in
'E4t?� �� ��e.#� ut't�il �a�?ne 99v�.
ust.n to 8xux Burlington dt. is increas,-d by w?u,0;.0 in order to
to )der 128' a recon« time to Tarok h Mill Roan.
DrLins*— h.tnuyfield Grain is needed.
Du:..;) study — Fay Spofford fg 'Thorndike have signed contract to be completed is
90 days; thb report will be ale March 1.
Carroll estimates an lac/nor- tor would coat about $$,0,000.