Cary Memorial Building Renovation Study Mills Whitaker Architects LLC
Lexington, Massachusetts Table of Contents
Cary Memorial Building Renovation Study Mills Whitaker Architects LLC
Lexington, Massachusetts Page 1
Cary Memorial Building Renovation Study Mills Whitaker Architects LLC
Lexington, Massachusetts Page 2
Cary Memorial Building Renovation Study Mills Whitaker Architects LLC
Lexington, Massachusetts Page 3
Cary Memorial Building Renovation Study Mills Whitaker Architects LLC
Lexington, Massachusetts Page 4
Cary Memorial Building Renovation Study Mills Whitaker Architects LLC
Lexington, Massachusetts Page 5
Cary Memorial Building Renovation Study Mills Whitaker Architects LLC
Lexington, Massachusetts Page 6
Cary Memorial Building Renovation Study Mills Whitaker Architects LLC
Lexington, Massachusetts Page 7
Isaac Harris Cary Memorial Building Renovation
1605 Massachusetts Avenue
Lexington, Massachusetts
Contract No. 13-06
SITE PLAN
A-1 Site Plan à Existing
A-2 Site Plan à Demolition
A-3 Site Plan à Proposed
BASEMENT LEVEL
A-4 Basement Level à Existing
A-5 Basement Level à Demolition
A-6 Basement Level à Proposed
FIRST FLOOR PLAN
A-7 First Floor Plan à Existing
A-8 First Floor Plan à Demolition
A-9 First Floor Plan à Proposed
SECOND FLOOR PLAN
A-10 Second Floor Plan à Existing
A-11 Second Floor Plan à Demolition
A-12 Second Floor Plan à Proposed
ATTIC LEVEL
A-13 Attic Level à Existing
A-14 Attic Level à Demolition
A-15 Attic Level à Proposed
ROOF PLAN
A-16 Roof Plan à Proposed
ILLUSTRATIONS OF SAMPLE USES
A-17 Stage Area for Public Meeting: Town Meeting Example
A-18 Stage Area for Exhibit: Quilt Show Example
A-19 Stage Area for Performance: Lexington Symphony Example
APPENDIX A
DRAWINGS Ã EXISTING & PROPOSED
Mills Whitaker Architects LLC
SITE PLAN - EXISTING
SITE PLAN - DEMOLITION
SITE PLAN - PROPOSED
BASEMENT LEVEL - EXISTING
BASEMENT LEVEL - DEMOLITION
BASEMENT LEVEL - PROPOSED
FIRST FLOOR PLAN - EXISTING
FIRST FLOOR PLAN - DEMOLITION
FIRST FLOOR PLAN - PROPOSED
SECOND FLOOR PLAN - EXISTING
SECOND FLOOR PLAN - DEMOLITON
SECOND FLOOR PLAN - PROPOSED
ATTIC PLAN - EXISTING
ATTIC PLAN - DEMOLITION
ATTIC PLAN - PROPOSED
ROOF PLAN - PROPOSED
Isaac Harris Cary Memorial Building Renovation
1605 Massachusetts Avenue
Lexington, Massachusetts
Contract No. 13-06
COMMITTEE SURVEY OF WORK SCOPE ITEMS FROM PRIOR STUDY
B-1 Accessibility Improvements
Auditorium & Support Spaces
B-2 Miscellaneous Improvements
Exterior Structural Repairs
Interior Structural Repairs
B-3 Structural Modifications
Electrical Improvements
B-4 Acoustical Improvements
Repairs & Improvements to Stage Rigging
WORK SCOPE ITEMS FROM PRIOR EVALUATION STUDY REPORT
B-5 Preliminary Scope & Budget
Accessibility Improvements
B-6 Auditorium & Support Spaces
Miscellaneous Improvements
B-7 Exterior Structural Repairs
Interior Structural Repairs
Structural Modifications
B-8 Mechanical à Fire Protection System Improvements
Mechanical à Plumbing System Improvements
Mechanical à HVAC System Improvements
Electrical Improvements
B-9 Acoustical Improvements
B-10 Repairs and Improvements to Stage Rigging
PRIORITIZATION NOTES
The Committee removed the following items from the work scope as
scores and subsequent discussions regarding public benefit and n
Do Not Make Civil Room Accessible (anticipates a variance from 5
Do Not Provide TTY Pay Phone (delete public pay phone from Lobby
Do Not Restore c. 1928 Display Cabinets in Bird Room (keep exist
Do Not Replace Acoustical Shell at Main Stage (existing is adequ
Do Not Replace or Refurbish Fixed Seating (could be a separate p
Do Not Restore Operation of Stone Drinking Fountains (retain as-is)
APPENDIX B
SCOPE PRIORITIZATION SURVEY
Mills Whitaker Architects LLC
SURVEY RESULTS FOR WORK SCOPE PRIORITIZATION
SURVEY RESULTS FOR WORK SCOPE PRIORITIZATION
SURVEY RESULTS FOR WORK SCOPE PRIORITIZATION
SURVEY RESULTS FOR WORK SCOPE PRIORITIZATION
RECOMMENDED WORK SCOPE FROM EVALUATION STUDY
RECOMMENDED WORK SCOPE FROM EVALUATION STUDY
RECOMMENDED WORK SCOPE FROM EVALUATION STUDY
RECOMMENDED WORK SCOPE FROM EVALUATION STUDY
RECOMMENDED WORK SCOPE FROM EVALUATION STUDY
RECOMMENDED WORK SCOPE FROM EVALUATION STUDY
Isaac Harris Cary Memorial Building Renovation
1605 Massachusetts Avenue
Lexington, Massachusetts
Contract No. 13-06
EVALUATION OF EXISTING ROOF TRUSSES
C-1 Letter from Structures North Consulting Engineers
Confirming Adequacy of Existing Steel Roof Trusses
EVALUATION OF CHILLER NOISE
C-2 Letter from Acentech: Proposed Replacement Chiller Location & Noi
ENERGY ANALYSIS FOR REPLACEMENT BOILERS & CHILLER
C-5 Energy Analysis Memo from The Green Engineer regarding
$12,800 Annual Operating Cost Savings from HVAC Upgrades
AUDIOVISUAL SYSTEM PROGRAM REPORT
C-8 Audiovisual System Program & Budget Report by Acentech
The AV System Program Report was the result of discussions with
relative to the various audiovisual needs and opportunities. Af
report, discussion with the Committee resulted in the following
the recommended project scope:
A. Auditorium Base Audiovisual System YES
A.1 Left/Right Loudspeakers no
A.2 Production Communication/Intercom YES
A.3 Additional Wireless Microphones no
A.4 Portable Loudspeakers YES
A.5 Motorized Projection Screen no
A.6 Broadcast Video Production System YES
A.7 Lobby Audio (as amended) YES
A.8 Lobby Video Display no
A.9 Green Room Video and Audio Monitoring YES
B. Small Meeting Rooms (Ellen Stone & Legion, not Civil) YES
C. Estabrook Hall YES
D. Bird Room YES
E.1 Portable Camera Ports in Mtg. Rooms (no motorized cameras) Y
E.2 Video Distribution to Meeting Room Displays no
AURALIZATION OF BATTIN HALL
C-33 Image from Acentech: Auralization Analysis (3-D Computer M
APPENDIX C
CONSULTANT DOCUMENTATION
Mills Whitaker Architects LLC
ROOF TRUSS EVALUATION LETTER
NOISE EVALUATION FOR REPLACEMENT CHILLER
NOISE EVALUATION FOR REPLACEMENT CHILLER
NOISE EVALUATION FOR REPLACEMENT CHILLER
OPERATING COST ANALYSIS FOR HVAC SYSTEM UPGRADES
OPERATING COST ANALYSIS FOR HVAC SYSTEM UPGRADES
OPERATING COST ANALYSIS FOR HVAC SYSTEM UPGRADES
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
AUDIOVISUAL SYSTEM PROGRAM REPORT
IMAGE FROM AURALIZATION BY ACENTECH
Isaac Harris Cary Memorial Building Renovation
1605 Massachusetts Avenue
Lexington, Massachusetts
Contract No. 13-06
SUMMARY OF RECOMMENDED IMPROVEMENTS
D-1 SUMMARY OF RECOMMENDED IMPROVEMENTS
A: LIFE SAFETY IMPROVEMENTS
Exterior Accessibility
Interior Accessibility
Other Improvements
B: BUILDING SYSTEM IMPROVEMENTS
Structural Repairs
Public Toilet Rooms
Boilers
Ventilation
Chiller Noise
Electrical Switchgear
C: FACILITY USABILITY IMPROVEMENTS
Battin Hall
Green Room
Main Lobby
Estabrook Hall
Bird Room
Ellen Stone & Legion Rooms
OUTLINE SPECIFICATIONS FOR RECOMMENDED IMPROVEMENTS
D-2 Project Description
D-3 General Requirements
D-4 Life Safety Improvements
D-6 Building System Improvements
D-8 Facility Usability Improvements
D-10 Referenced Attachments & Other Information
NOTES REGARDING SUMMARY & SPECIFICATIONS
The Outline Specifications (pp. D-2 thru D-10; Nov 1, 2012) included a range of options and
alternates that were used to establish budget pricing. The Summ D-1; Nov 29, 2012)
expresses the final version of the recommendations after scope r
APPENDIX D
RECOMMENDED IMPROVEMENTS
Mills Whitaker Architects LLC
SUMMARY OF RECOMMENDED IMPROVEMENTS
OUTLINE SPECIFICATIONS
OUTLINE SPECIFICATIONS
OUTLINE SPECIFICATIONS
OUTLINE SPECIFICATIONS
OUTLINE SPECIFICATIONS
OUTLINE SPECIFICATIONS
OUTLINE SPECIFICATIONS
OUTLINE SPECIFICATIONS
OUTLINE SPECIFICATIONS
Isaac Harris Cary Memorial Building Renovation
1605 Massachusetts Avenue
Lexington, Massachusetts
Contract No. 13-06
PRELIMINARY ESTIMATE OF PROJECT COSTS
E-1 PRELIMINARY PROJECT BUDGET
Dated 12 December 2012
Prepared by Mills Whitaker Architects LLC
$1,536,683 A: Life Safety Improvements (18.0%)
$3,969,763 B: Building System Improvements (46.5%)
$3,030,680 C: Facility Usability Improvements (35.5%)
$8,537,126 Preliminary Project Budget (100%)
PRELIMINARY ESTIMATE OF PROJECT COSTS
E-2 SCHEMATIC DESIGN ESTIMATE
14 November 2012
Prepared by Daedalus Projects Inc.
APPENDIX E
PRELIMINARY BUDGET ESTIMATE
Mills Whitaker Architects LLC
PRELIMINARY ESTIMATE OF PROJECT COSTS --- 12 DEC 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012
SCHEMATIC DESIGN ESTIMATE --- 14 NOV 2012