HomeMy WebLinkAbout2008-02-27-Senior center.BargmannMuzzey Senior Center and White House
Lexington, Massachusetts
Conceptual and Feasibility Study
Bargmann Hendrie + Archetype, Inc.
Existing Conditions
Muzzey Senior Center Mill Street ASDC Facility
Existing Conditions: White House Site
zi
. 4E W4AIWS6allAtiS KINNO WiirekWyWak Miarm
Lexington Senior Center Feasability Study
February 27, 2008
PRELIMINARY PROGRAM, PARKING AND OCCUPANT LOAD ANALYSIS,''sdr=
Program Area
Existing
Proposed
Parking Req.
Occupant Load
Parking
and
Business Occupancy
Entry
424
300
Reception
100
250
Billiards
350
Table Tennis
935
250
Windowpane Shop
353
500
Occupant
Elmer Bull Fix It Shop
368
700
Computer Room
80
250
Director
1
200
An a Iys i s:
Office Manager
121 21
80
Department Clerk
56
80
Volunteer Coordinator
125
Method 1
Program Coordinator
184
125
Social Workers (3)
374
375
Nurse
100
Veterans' Agent
100
Examination / Screening Rooms (2)
240
Health Consultation
see Exam / Scr.
Copy / Print / Fax
75
Staff Break Room
150
Meals Program Directors Office
65
100
Kitchen
396
800
Custodian
75
Total Area
3,601 nsf
5,225 nsf
6,5 6,530 gsf
21 spaces (1 car per 250 nsf)
66 occ.
(1 accupant per 100 gsf)
Assembly Occupancy
Lounge / Seating Area
500
Multi- Purpose Room (MPR) (3)
4,500
Exercise / Dance Studios
935
see MPR
Conference Room 1
268
400
Conference Room 2
250
Music Studio
see Muzzey Rm.
Dining Room
1,667
see MPR
Total Area
2,870 nsf
5,650 nsf
7,065 gsf ,
55 spaces (1 car per 250 nsf except
MPR, which is calculated
as per above)
471 acc.
(1 occupant per 15 gsf)
Fitness Occupancy
Fitness Room
750
Muzzey Room
692
1,000
Total Area
6± 2 nsf
1,750 nsf
2,190 gsf
7 spaces (1 car per 250 nsf)
44 otc.
(1 occupant per 50 gsf)
Classroom Occupancy
Classrooms (2)
335
1,100
Arts & Crafts Studio
600
Total Area
335 nsf
1,700 nsf
2,125 gsf
7 spaces (1 car per 250 nsf)
85 ot:c.
(1 occupant per 20 nsf)
Library Occupancy
Library / Reading Room
280
600
Total Area
280 nsf
6100 nsf
750 gsf
3 spaces (1 car per 250 nsf)
9 oac.
(1 per 100 nsf for stacks area
1 per 50 nsf for reading area)
Program,
Parking
and
Occupant
Analysis:
Method 1
PRELIMINARY PROGRAM, PARKING AND OCCUPANT LOAD ANALYSIS,
ros area'
Program Area
Existing Proposed
Storage Occupancy
Coat Closets
General Storage
Multi- Purpose Room Storage
Fitness Storage
Muzzey Closet
Classroom Storage
Windowpane Shop Storage
Elmer Bull Fix -It Shop Storage
Arts & Crafts Storage
Computer Room Storage
Office Supply Storage
Dining Room Storage
Kitchen Storage
Parking Req.
Occupant Load
40
135
150
500
200
96
25
200
60
100
100
100
25
42
25
112
see MPR
150
Total Area
350 nsf
1,710 nsf
2,140
gsf
spaces
occ. (1 occupant per 300 gsf)
Business Occupancy
Entry / Transition Area
35
Indoor Gardening Area
Staff Offices
144
Kitchen
300
Laundry
100
Total Area
79 nsi
100
300
625
400
100
1,525 nsf'
1,900 gsf
Assembly Occupancy
Dining Rooms
7
spaces
(1 car per 250 nsf)
9 occ
occupant per,
00 gs
900
Activity Rooms
288
Rest Area
125
Conference Room
Total Area
1,313 nsf
1,200
800
125
200
2,325 nsf',
2,900 gsf
Storage Occupancy
Coat Closet
5 spaces (`
tr per 500 nsf) 194 occ. (1 occupant per 15 gsf
Activity Room Storage
Indoor Gardening Area Storage
General Storage
attic
Total Area
nra nsi
25
200
25
150
400 nsf
spaces 2 acc. (1 occupant per
Combined need: 26,300 gsf; 105 parking spaces
Program, Parking and Occupant Load Analysis: Method 2
Lexington Senior Center Feasability Study
April 2, 2008
PRELIMINARY PROGRAM, PARKING AND OCCUPANT LOAD ANALYSIS,
Hours of Operation
M to F Weekdays - Senior Center and Supportive Day Care
Parking Req. Occupant Loacl
M to F Weeknights - Rec. Dept. & Senior Center Programs Weekends - Large Function in MPR, ReC. Classes Elsewhere
Parking Req. Occupant Load
Parking Req. Occupant Loacl
Welcumin. & Hospitalit
Entry
Reception
Lounge / Seating Area
Coat Closet
Storage
Janitor's Closet
Restrooms
Net Area
Gross Area = Net Area x 1.25
Multi- Purpose Room
Multi- Purpose Room (MPR)
Multi- Purpose Room Storage
Net Area
Gross Area = Net Area x 1.25
Fitness & Exercise
Exercise / Dance Studios
Fitness Room
Billiards
Table Tennis
Storage
Net Area
Gross Area = Net Area x 1.25
Classroom / Conference Rooms
Muzzey Room
Muzzey Closet
Classrooms
Conference Room
Conference Room
Storage
Net Area
Gross Area = Net Area x 1.25
Librar , Shops & Studios
Library / Reading Room
Windowpane Shop
Windowpane Shop Storage
Elmer Bull Fix -It Shop
Elmer Bull Fix -It Shop Storage
Arts and Crafts Studio
Music Studio
Arts Storage
Computer Room
Computer Storage
see MPR
750
350
250
200
1,550 nsf
1,940 gsf
600
500
100
700
100
600
Room
100
250
25
2,975 nsf
3,720 gsf
Administrative
Director
Office Manager
Department Clerk
Volunteer Coordinator
Program Coordinator
Social Workers
Nurse
Veterans Agent
Examination / Screening Rooms
Health Consultation
Copy / Print / Fax
Staff Break Room
Office Supply Storage
Staff Coat Closet
Net Area
Gross Area = Net Area x 1.25
145 200 1 space
121 80 1 space
56 80 1 space
125 1 space
184 125 1 space
374 3 @ 125 2 spaces
100 1 space
100 1 space
2 @ 120 3 spaces
see Exam / Scr
75
150
42 25
10
922 nsf 1,685 nsf
2,100 gsf 12 spaces
1 occ.
1 occ.
1 occ.
1 occ.
1 occ.
3 occ.
1 occ.
1 occ.
6 occ.
16 occ.
0 spaces
0 occ.
0 spaces
0 occ.
Food Services
Dining Room
1,667
Dining Room Storage
112
Meals Program Director's Office
65
Kitchen
396
Kitchen Star age
Net Area
2 240 nsf
Program, Parking and Occupant Load Analysis: Method 2
Lexington Senior Center Feasability Study
April 2, 2008
PRELIMINARY PROGRAM, PARKING AND OCCUPANT LOAD ANALYSIS,
Gross area = Net area x 1.25
Program Area
Existing Proposed
Hours of Operation
M to F Weekdays - Senior Center and Supportive. Day Care
Parking Req. Occupant Loacl
M to F Weeknights - Rec. Dept. & Senior Center Programs
Parking Req. Occupant Load
Method 2
Weekends - Large Function in MPR, Rec. Classes Elsewhere
Parking Req. Occupant Load
Gross Area = Net Area x 1.25
SENIOR CENTER TOTAL AREA
see MPR
see MPR
100
800
150
1,050 nsf
1,310 gsf
21,400 gsf
1 space
4 spaces
1 occ.
4 occ.
5 spaces
98 spaces
5 occ.
262 occ.
4 spaces
58 spaces
0 occ.
160 occ.
2 spaces
2 spaces
69 spaces
6 occ
6 occ.
354 occ.
Entry 1 Transition Area
Coat Closet
Dining Rooms
35
100
900
Activity Rooms
288
Activity Room Storage
Pest Area
Indoor Gardening Area
125
Indoor Gardening Area Storage
Staff Offices
144
Conference Room
Kitchen
Laundry
Restrooms
Garage
Storage
Net Area
Gross Area = Net Area x 1.25
SUPPORTIVE DAY CARE TOTAL AREA
300
100
3 @ 75
450
attic
2,567 nsf
25
1,200
800
200
125
300
25
625
200
400
100
4@ 100
2 spaces
40 occ.
5 spaces
5 occ.
50
COMBINED AREA NEEDED, GROSS
4,650 nsf
5 MO g3f
5,800 gsf
27,200 gsf
7 spaces
7 spaces
105 spaces
45 occ
45 occ.
307 occ.
0 spaces
0 spaces
58 spaces
0 occ
0 occ.
160 occ.
0 spaces
0 spaces
69 spaces
0 occ
0 occ.
354 occ.
200
180
160
140
120
0
100
Q
80
60
40
20
Figure 1
Lexington Senior Center
Parking Demand by Time of Day - Typical Weekday
with several daily events in the multi- purpose room
Parking Supply at new Center = ?
W O
O �
V �
� O
M M M
N
� ■
4P .'P OP P OP P .O4 cP Oi Oi Oi Oi Oi 3�
Transportation Issues
• ± 150 parking spaces
behind Town buildings
(including ± 71 at White House)
• Town Hall 85 employees
(declines by ± 40 after DPW move)
• Police Dept. needs
( ±20 vehicles in fleet)
• Permit Parking Program
(17 behind + 6 Fletcher Ave.)
• Reduce curb cuts
Community Comparison of Senior Centers
Lexington Senior Center Feasibility Study
April 28, 2008
SENIOR CENTER SIZE AND POPULATION INFORMATION
Beverly
Brookline
Leominster
Lexington Existing
Lexington - Proposed
Methuen
7,637
8,598
18,000 sf
n/a
9,053
10,157
21,000 sf
2001
7,105
8,159
8,000 sf
1987
1,2
48
7,942
1
0,700
sf
19
84
7,2
48
7,942
21,400
sf
2.36 sf
2.32 sf
1.20 sf (1990 population)
1.48 sf (2000 population)
2.69 sf (2010 population)
2.11 sf (1990 population)
3.22 sf (1990 population)
1.57 sf (2010 population)
4.06 sf (2010 population)
1.17 sf
8,208
9,103
18,000 sf
1985
Peabody
Plymouth
Sharon
Watertown
10,625
11,681
30,000 sf
1991
7,559
11,556
18,200 sf
TBD
2,565
3,516
14,300 sf
2007
6,645
6,388
7,500 sf
1993
Average
* = excluding Lexington
7,405'
The Massachusetts Executive Office of Elder Affairs recommends 5.0 sf per 60+ resident.
8,567
16,875 sf*
nia'
Note: This chart compares the size of the proposed Lexington Senior Center with those in Massachusetts Towns of similarly -sized senior populations.
Towns with notably inadequate and outdated facilities are excluded, as are Towns with smaller populations and disproportionately large senior centers.
2.57 sf
�.:
r.
r
Y MI
Main Block
1
Historic Elements
+ Ell + Barn/Carriage House
Existing Conditions
Scenario Comparison
. . 0.
' 1 . -,
..., ? '.,7.7.,..., 1 1
• . , .. 1 I .'' =.' l - • '6
= • - '''' - --- =
Muzzey Center Issues
Site Plan
- . ,
• .
'r 1 ' .1 •
ir 111 (J,Ii.:11.11.111.1111111
• •,-•
el"1 7:J11.111111!..
Scenario A Conceptual Floor Plan
111111111.11NERIESIUSTIVIIIIIMENIENINP
KOKOPTOMAIM • 0111010611AM *NORM MARAffictirgINWA MN MN WV. WNW WM WA CO IfT0 • MA 0,1_41t
Scenario A Conceptual Floor Plan
I I 1 ' • '
IIFo' ,
111111 111111111111idg
111111,41:1Flicii1711110iffill111
WilifiNOWN CfahltiVis414: MgRAFtRik WiSitrAMANNOPROM WNW EISNAVit. KO VW/GOMA NM
Scenario B Conceptual Floor Plan
bil=fiNgiffifi WilififiXAVii WORM FOINNAIKONIKAV POW liAN tiM). WNW iirkW kffirtag 0,1_4*
Scenario B Conceptual Floor Plan
111111011111 rii][1111111
.11111111111111110011111111ENowsi
=
/14,7-M■713:1"17t=rvr mitt
11111111:i11111111-
WIWORMINO WiftilkisM6 WORM OlikritOWCOMION .0100 UN OM *MOM Whli EIM Mtn NION
iFAMOWP_MINOPOW1
•
•
Scenario C Conceptual Floor Plan
clEININEEPORIMMIIMINE1601111111111111EMBEEN
gpsymmr
EMSZONE
ItS=MANYAN IHMISM.6 WORM alitritOMMGWANION MAN UN OM MOM Mffii NU WA WC OWN Kfai
Scenario C Conceptual Floor Plan
Ilmesser
imautriaa
Scenario C Conceptual Floor Plan
111111111111111114NOMMILARINHERVISIBMIN
nimaiatikut
Mmetwomormaret
antessraot
Ift=triati*. IWO* ilskT6IC WEIMME .051MYWALWARtai ONAV UN Mi. MOM ON NI awa Mtn MN
• ki
Lexington Senior Center Feasibility Study
SCENARIO B ESTIMATED PROJECT COST
ITEM H
Construction
DESCRIPTION
$10,185,575
UNIT QUANTITY UNIT COST EXTENSION SUBTOTALS
1.0 Construction Costs (Total Estimated Cost of Construction, today's $)
$8,704,575
Architect/Engineers
2.0 Architect Basic Services
Contract Amount
LS
1
$650,000 $650,000
$650,000
2.1 NE Additional Services
Hazmat Consultant
Kitchen Designer
LEED® process for PD /SD /DD /CD /CA
LEED® Energy Modding
Professional Cost Estimate
LS
LS
LS
LS
LS
$7,500
$15,000
$100,000
$30,000
$25,000
$7,500
$15,000
$100,000
$30,000
$25,000
$177,500
2.3 Architect Reimbursables
General Expenses
Pre-Qualification
Bid Document Printing
Bid Advertisements
LS
LS
LS
LS
$20,000 $20,000
$5,000 $5,000
$5,000 $5,000
$0
$30,000
FF &E and Technology
4.0 Design FF &E
LS
1
$25,000
$25,000
$25,000
4.1 FF &E
Kitchen & Vending Equipment
Fitness Equipment
All other FF &E
LS
LS
LS
$80,000
$20,000
$150,000
$80,000
$20,000
$150,000
$250,000
4.2 Design Techndogy
LS
1
$20,000
$20,000
$20,000
4.3 Technology
LS
1
$100,000
$100,000
$100,000
Support Services
5.0 Structural Peer Review
LS
1
$6,000
$6,000
$6,000
5.1 Materials Testing Services
Concrete, Steel, etc.
Environmental Monitoring
LS
LS
1 $7,500 $7,500
1
$7,500
$7,500
$15,000
5.2 Geotechnical Services, etc.
Soils Report /Borings
Water Flow /Pressure Test
LS
LS
1 $10,000 $10,000
1
$500
$500
$10,500
5.3 Surveying
LS
1
$20,000
$20,000
$20,000
5.4 Moving
allow
1
$17,500
$17,500
5.5 LEED° Commissioning (fundamental)
LS
1
$30,000
$30,000
$30,000
Administrative
6.0 Permits
allow
1
$2,500
$2,500
6.1 Bond Underwriting
LS
1
$25,000
$25,000
$25,000
6.2 Insurance and Legal
Legal Fees
Builders Risk Insurance
LS
LS
1 $10,000 $10,000
1
$30,000
$30,000
$40,000
6.3 Utility Company Charges
allow
1
$25,000
$25,000
6.4 Administrative Costs
allow
1
$2,000
$2,000
6.5 Clerk -of- the -Works
allow
1
$35,000
$35,000
TOTAL ESTIMATED PROJECT COST (TODAY'S $)
SCENARIO B FLOOR AREA:
COST PER SQUARE FOOT:
ESCALATION TO MID -POINT OF CONSTRUCTION (ASSUMED 3Q,2010)
$10,185,575
22,500 SF
$452.69 /SF
18.97% $12,117,779
Estimated Costs
• $8,704,575 construction (2008)
($3871sf)
• $10,185,575 total project (2008)
($4531sf)
• $12,117,779 total project (2010)
Muzzey Senior Center and White House
Lexington, Massachusetts
Conceptual and Feasibility Study
• Muzzey Center available space is substandard and access
to the facility is limited.
• Two - building campus at Muzzey and White House site
does not make sense.
• Expanded Senior Center program is feasible at single site:
a new 2 -story building at 1557 Mass. Ave., incorporating
historic components of White House.
• Parking demand may exceed capacity.
• Mill Street facility is appropriate, but future is uncertain.
• Estimated 2008 Total Project Cost $10,185,575 ($4531sf).