Loading...
HomeMy WebLinkAbout1984-01-05-CRCParking-min.pdf MINUTES CRC - Parking Garage Subcommittee January 5, 1984 Attendees Robert Sacco, Joseph Trani , David Wells The sub-committee received comments on the Center Parking Garage Economic Feasibility worksheet by Robert Bowyer on 11 November 1983 The Bonding & Financing rates were reviewed by Mr J Kane, Town Revenue Officer and Bill Gothorpe and associates at Lexington Savings Bank Both parties confirmed and agreed with the findings of Mr Bowyer j Costs and preliminary design were reviewed by Forest Lindwall , Spaul,ng & Co. and Engineers Design Group, Mr Lindwall 's report indicated that the cost of 8,000/space was appropriate for the elevated spaces However, a cost of $2,500/space was suggested for the existing surface lot. Spauling & Co , indicated that a cost of $6,000/space would be more approp aiite for a single-deck parking structure Spaulding also included a cash-flow projection for 5 years which indicated that a parking rate of $3 50/day and $1 00/hour was realistic Engineers Design Group submitted preliminary drawings and cost figures for a multi-level structure with a capacity of approximately 700 cars at a cost of $3,043,977 00 The Committee voted to further investigate the possibility of a parking garage on the Meriam Street lot and requested $3,000 to create a model of this garage for presentation to Town Meeting to start debate on the issue