Loading...
HomeMy WebLinkAbout1987-MMCBIC-rpt.pdf 1987 ANNEAL REPORT Minuteman Connuter Bikeway Implementation Camiittee The role of the Minuteman Commuter Bikeway Implementation Committee is to assist the Selectmen in monitoring the design and construction of the Minuteman Commuter Bikeway For most of the year, the activities of this committee were limited to those of its chairman, Selectman John C Eddison, who represented Lexington in the meetings of the state level Bikeway Advisory Committee The latter committee selected Vollmer Associates on January 30, 1987, to be the design contractor for the bikeway That decision was reviewed, processed and finally ratified at the state level in late August The contractor then prepared an initial design concept which was presented to the three concerned towns for comment and reaction at information meetings in mid-November The Lexington meeting was held in Cary Hall on November 17 under the sponsorship of the state Department of Environmental Management (DEM) The meeting was attended by the members of the Lexington Bikeway Committee, the Bedford Bikeway Committee and about two dozen interested citizens The representatives of Vollmer Association displayed a preliminary design plan covering the 5 5 miles of bikeway witnin Lexington, discussed the plan in detail and requested comments from the audience. The members of the Lexington Committee offered their comments as individuals to the consultants at that time The Lexington Committee met again on December 8 to review the design concept and to formulate its recommendations to the Selectmen and the consultants Those recommendations were presented in a memorandum forwarded to the consultant which addressed the issues of paving width, safety at intersections, signage, screening , security and landscaping,