Loading...
HomeMy WebLinkAbout1990-01-31-TAC-min.pdf T.A.C. Meeting, January 31, 1990 Present: S. Arnold, B Mix, B, Murphy, S. Castleman, N. Santosuosso, P. e Dick Zimmerman pants tom terest the commmittee in continuing thru Dec'91 because 8 rtes better than projected 6 rtes assumes bids about $35/hr and that might be low new vehics raise price $3-4K/yr power transmission warranty ' til mid-Sept 91 Goes(Warranty: Eng, transm, drive trn, $75 deductible. to in process refurbishing ngthe engines in ev. vehic. 2 done. mechanically will be great. seats done, insides clean. Discussed doing 6 rtes at lower price. RZ estimates approx $3/hr increase. Jim Borsari could give us names of places that have operated ,E1DOrados for 5-6 years and lots of miles. After RZ left Discussed whether to ask G&W to said good condition when inspectedsinsOcths 89aby�DPU. Lex DPW Discussed extending this contract thru Dec 31, 90 and new bid for Jan, 91. Could ask RZ to hold to current price even if cut to 6 rtes, and not pay penalty. If continued with old buses could buy a year with 8 rtes. Incr fares. May be in best interest to wait, considering financial pressure. We need input from Rick on continuing with old vehics; also from Webb Sussman and EOTC. J