INSTALL TEMPORARY EROSION <4\
CONTROLS (SEE DETAILS)
2 J \ \\
210.
�J F
i TEMPORARY COFFER DAM I
(SHEET PILES, STEEL PLATES, JERSEY BARRIERS AND SAND
BAGS, PROPRIETARY SYSTEM, OR APPROVED AL TERNA TI VE)
- - - -- 213-- -
-----------------
- x11.88
- X211.55 BOTTOM OF BANK
'�? M INSTALL TEMPORARY COFFER DAM PRIOR \
:6x I x!11 �� TO INSTALLING TEMPORARY BYPASS PIPING APPROXIMATE R.O.W.
_ _ _ _ _
INSTALL TEMPORARY BYPASS PIPING
(78" MIN. HDPE OR APPROVED AL TERNA TI VE) \
- TEMPORAR Y DEWA TERING I �� ✓ - w� _. _ _ = _ w - w- -
`o (FRAC) TANK AND EQUIPMENT
-216 c �; W-A2
z1o�o flWF- - A3_- --------------- - - -__
273-------------
z- - -- - - - -- -- - - - - -- - -- -- 214 -- ----------
' - - - - - - ----- - - - - -- ___
z -------------------- - -
- -- ----- - - - - -- - -- 217 -------- - - - - ---216 __ �F A. - A1 ----- - - - - -- ---- -crx.-
iITA -- 1J7J°MMzS' 77vv Tr( i -
-
D ^ - _ - - - WOODEN GU,4PD RAIL MV -
m / / VVOODE N GUARD RAIL
r' ✓1 UL Cr-f rwwrYl'1" �-
78"' TWIN
--
�cPG � G
INSTALL COMPOST SOCK SLOPE
\moo STABILIZATION ALONG ALL AREAS OF _214-' --
'� \ DISTURBED STREAMBANK (SEE DETAILS) '
--21 JCBD
TEMPORARY WELL POINT USED TO
CONTROL GROUNDWATER ELEVATION
N/F
JAMES O'CONOR
73 HANCOCK AVE
MAP 56 LOT 31
/
/ M
E_ /JG'- OF PA' ✓� 11[-N i-
ICR�II`vE �1 Y ��.9_.J� �9J
\ - C
=D(;. OF rAv-1 - - - - --
,\ - -_ --------------------------- 217- --
-D 1�
'_.-. LIJ�F
' - - -21 - - - -- - Y,
�n,w MO° RCP-=--- - - - - -- - - - - - ----- - - - - --
Xo _ -- ---- =-.13-
I f
WF- D3
i\ \
X \,
k'1F -C�\ 211.29�� \\ \� v ✓ w
X \\ MWRA SMH
i RIM EL. = 214.78
`oGf \\x �= 206.58 _ - - - -
WFyc3 \ `\\ \\ ADDITIONAL TEMPORARY COFFERDAM
W �\ 211.00 \ OR SIL TA TION BOOM (AS NEEDED) TO
X \ \ \ry PREVENT BACKWATER AND PREVENT
NI
DOWNSTREAM SIL TA TION
BOTTOM OF \� \ \\
z
o \o_
m
C
rn
N
D
rn
C)
o \
WAY
Z\ I
O
C-
0
t
APPROXIMA TE R. 0. W. I
BANK y\
X\ NIF
WF -C4) \ \�� X210.8 �Q,h TOWN OF LEXINGTON �M
\ \ ` BEDFORD STREET
MAP 56 LOT 30
THE FOLLOWING SEQUENCE IS PROVIDED FOR GUIDANCE TO THE CONTRACTOR FOR COMPLYING WITH
ENVIRONMENTAL REQUIREMENTS.
THE CONTRACTOR REMAINS RESPONSIBILE FOR MEANS AND METHODS OF CONSTRUCTION, AND CAN
REASONABLY MODIFY THIS SEQUENCE, CONSISTENT WITH ALL APPLICABLE PERMIT REQUIREMENTS,
1. CULVERT REPLACEMENT AND ADJACENT STREAMBANK STABILIZATION WORK SHALL COMMENCE AFTER JULY 1ST AND BE COMPLETED
12. EXCAVATE THE BIKEWAY TO PREPARE FOR PLACEMENT OF THE NEW CULVERT, REMOVE THE EXISTING CULVERT AND STONE WINGWALLS,
PRIOR TO OCTOBER 1ST.
AND COMPLETE EXCAVATION AND FOUNDATION PREPARATION FOR THE NEW CULVERT. THE AREA OF DISTURBANCE SHALL BE KEPT TO A
MINIMUM.
2. PLACEMENT OF TEMPORARY TRAFFIC CONTROL DEVICES TO CLOSE DOWN THE USE OF THE BIKEWAY. TEMPORARY TRAFFIC SIGNAGE
SHALL BE USED TO SET UP A BIKEWAY DETOUR.
13. STARTING AT THE END AS DIRECTED BY THE SHOP DRAWINGS, INSTALL THE CULVERT CUTOFF WALLS AND WINGWALL FOOTINGS.
3. PERFORM BIKEWAY ALTERATIONS SUFFICIENT FOR EQUIPMENT ACCESS FOR CULVERT RECONSTRUCTION.
14. INSTALL THE NEW CULVERT SECTIONS AND WINGWALLS ON TOP OF CUTOFF WALLS, FOOTINGS, AND PREPARED BASE.
4. TEMPORARY EROSION CONTROLS, COFFER DAMS, AND BYPASS PIPING (OR APPROVED ALTERNATIVE BYPASS) SHALL BE USED TO
15. IT IS AT THE CONTRACTORS DISCRETION WHETHER TO FILL CULVERT SECTIONS WITH DESIGNED STREAM BED MATERIAL AS WORK
MAINTAIN NATURAL FLOWS IN THE STREAMBED IMMEDIATELY UPSTREAM AND DOWNSTREAM OF THE WORK AREA, AND TO PREVENT
PROGRESSES OR AS A FINAL STEP. AS NOTED ON THE DETAIL SHEETS: THE USE OF A SEPARATE TOP SLAB OPTION OR ACCESS
SEDIMENT DISCHARGE TO STREAM, IN ACCORDANCE WITH PERMIT CONDITIONS.
MANHOLES OPTION IS AT THE DISCRETION OF THE CONTRACTOR. A CONTINUOUS BOX CULVERT, TOP SLAB OPTION, OR SEALABLE ACCESS
MANHOLES, MEETING ALL REQUIRED SPECIFICATIONS MAY BE USED UPON ACCEPTANCE BY THE ENGINEER.
5. INSTALL TEMPORARY BYPASS PIPING, OUTSIDE THE LIMITS. OF NEW CULVERT STRUCTURE, IN THE GENERAL LOCATION SHOWN IN THE
EXISTING EDGE OF PAVEMENT
PLAN VIEW, AS REQUIRED BY FIELD CONDITIONS. INSTALLATION OF THE TEMPORARY BYPASS PIPING SHALL BEGIN FROM THE DOWNSTREAM
16. GRADE STREAMBED MATERIAL WITHIN BOX CULVERT AS DEPICTED ON PLANS. THE FULL CONSTRUCTION OF THE DESIGNED STREAMBED
END. DO NOT ACTIVATE BYPASS PIPING UNTIL BIKEWAY DETOUR PREPARATIONS ARE COMPLETE.
MATERIAL AND STREAMBANKS WITHIN THE CULVERT MUST BE COMPLETED AS SPECIFIED ON THE PLANS.
6. A TEMPORARY COFFERDAM SHALL BE INSTALLED AROUND THE UPSTREAM END OF THE TEMPORARY BYPASS PIPING PRIOR TO PUTTING
OPTIONAL CONSTRUCTION METHOD: INSTALL THE TOP SLAB PORTION OF THE BOX CULVERT OR SEALABLE ACCESS MANHOLE COVERS AND
HEADWALLS AND SECURE AS SPECIFIED BY THE MANUFACTURER.
THE TEMPORARY BYPASS PIPING INTO USE.
PROPOSED EDGE OF PAVEMENT
17. COMPLETE BACKFILLING OF CULVERT STRUCTURE.
7. THE UPSTREAM WATER LEVEL OF THE STREAM SHALL BE GRADUALLY LOWERED THROUGH THE USE OF TEMPORARY BYPASS PIPING,
EXISTNG DRAIN UNE
PUMPING, OR OTHER APPROVED MEANS, AS TO AVOID LARGE VOLUMES OF WATER AND EROSIVE VELOCITIES TO DISCHARGE DOWNSTREAM.
18. INSTALL COMPOST SOCK SLOPE STABILIZATION ALONG ALL AREAS OF DISTURBED STREAMBANK, SHAPE STREAMBANKS TO BLEND WITH
BED MATERIAL IN THE CULVERT.
8. THE UPSTREAM COFFERDAM SHALL BE INSTALLED TO CONTROL SURFACE WATER ACTION AND MAINTAIN ANY NECESSARY WORK IN THE
EXISTNG UTILITY POLE
DRY.
19. REMOVE TEMPORARY BYPASS PIPING, STABILIZE AND REESTABLISH STREAM BANK WHERE TEMPORARY PIPE WAS IN USE.
9. CULVERT STRUCTURE PLACEMENT SHALL BE CONDUCTED DURING LOW FLOW CONDITIONS AT A TIME WHEN NO RAIN IS PREDICTED FOR
20. REMAINING COFFER DAM SHALL BE REMOVED IN CONJUNCTION WITH THESE ACTIVITIES. IN ALL CASES OF COFFERDAM REMOVAL THE
THE ANTICIPATED TIME REQUIRED FOR INSTALLATION.
RELEASE OF FLOWS SHALL BE GRADUAL AS TO AVOID LARGE VOLUMES OF WATER AND EROSIVE VELOCITIES TO DISCHARGE DOWNSTREAM.
10. ADJUST EROSION CONTROLS AS REQUIRED TO PROTECT STREAM AND WETLANDS FROM SEDIMENT RESULTING FROM CONSTRUCTION
21. CONSTRUCT REMAINING BIKEWAY IMPROVEMENTS AND REINSTALL WOODEN GUARDRAIL.
ACTIVITY.
EXISTING STONE WALL
XRE -'a 1
22. REMOVE ALL TEMPORARY TRAFFIC CONTROL DEVICES AND OPEN ROADWAY TO TRAFFIC.
11. INSTALL DEWATERING .EQUIPMENT IN PREPARATION FOR COMPLETE EXCAVATION. A bEWATERING FRAC TANK WITH
SEDIMENTATION FILTRATION BAG SHALL BE USED PRIOR TO DISCHARGE.
23. REMOVE REMAINING EROSION CONTROLS WHEN ALL SURFACES HAVE BEEN STABILIZED.
MINUTEMAN D
SCALE 1 = 10'
LEGEND:
APPROX. ROW
EXISTING SURVEY MARKER
APPROXIMATE RIGHT -OF -WAY
170
EXISTING W CONTOUR
-IF
APPROXIMATE PROPERTY UNE
EOP
EXISTING I' CONTOUR
EXISTING EDGE OF PAVEMENT
EOP
-170- -
PROPOSED 5' CONTOUR
PROPOSED EDGE OF PAVEMENT
-D
EXISTNG DRAIN UNE
- -160- -
PROPOSED V CONTOUR
PROPOSED CULVERT
T
EXISTNG UTILITY POLE
EXISTING GUARD RAIL
i'N
EXI57NG SIM
-a -.s
PROPOSED GUARD RAIL
,° 12•
EXISTING TREE W/IRUNK DIAMETER
EXISTING STONE WALL
XRE -'a 1
EXISTING WET-AND FAG
COFFER DAM
EROSION CONTROLS
0
SHEET PILES
LIMIT OF WORK
A- ci&3i
JERSEY BARRIER
- - - -
APPROX. PROPERTY LINE
10 5 0 10 20
Scale V =10`
P.E. STAMP
GENERAL NOTES
1. DRAWINGS BASED ON TOPOGRAPHIC
SURVEY CONDUCTED ON JULY 28, 2014,
AUGUST 14, 2014 & SEPTEMBER 3, 2014 BY
GCG ASSOCIATES, INC. ELEVATIONS
SHOWN HEREON ARE REFERENCED TO
THE NAVD 1988 DATUM.
2. WETLAND DELINEATION PERFORMED
ON JUNE 25, 2014 BY COMPREHENSIVE
ENVIRONMENTAL, INC.
3. STREET LINES AND PROPERTY LINES
ARE BASED ON SURVEY CONDUCTED ON
JULY 28, 2014 BY GCG ASSOCIATES, INC.
4. ROADWAYS AND DRAINAGE STRUCTURE
LOCATIONS DEPICTED ON THIS MAP ARE
APPROXIMATE AND MUST BE VERIFIED BY
THE CONTRACTOR. THE LOCATION AND
DEPTH OF DRAINAGE PIPES SHOWN ON
THESE PLANS ARE APPROXIMATE AND
SHALL BE VERIFIED BY THE CONTRACTOR
PRIOR TO CONSTRUCTION.
5. THE CONTRACTOR SHALL EXERCISE
EXTREME CAUTION TO PREVENT ANY
DAMAGE TO ADJACENT PROPERTIES. ALL
AREAS WHICH ARE AFFECTED BY THE
CONTRACTOR'S OPERATIONS SHALL BE
RETURNED TO THEIR ORIGINAL CONDITION
OR BETTER, AT NO ADDITIONAL COST TO
THE OWNER.
6. ANY CHANGE IN FIELD CONDITIONS
SHALL BE REPORTED TO THE ENGINEER
TO INSURE THAT ANY MODIFICATIONS TO
THE ORIGINAL DESIGN ARE PROPER AND
ADEQUATE TO SERVE THE PROJECT'S
NEEDS AND COMPLY WITH THE:
APPLICABLE STANDARDS AND
REGULATIONS.
7. CONTRACTOR SHALL IMMEDIATELY
REPAIR OR FILL ANY POTHOLES THAT
OCCUR DUE TO CONSTRUCTION.
No.' Revision /Issue I Date
COMPREHENSIVE ENVIRONMENTAL
INCORPORATED
225 CEDAR HILL ST.
MARLBOROUGH, MA 01752
MINUTEMAN BIKEWAY
N. LEXINGTON BROOK
CULVERT REPLACEMENT
WATER MANAGEMENT AND
EROSION CONTRRL PLAN
Town of Lexington, MA
Project No.: 228 -5 Sheet
Dote: FEBRUARY 2015
Drawn By: E CJ 2
Checked By: : M LL
Scale: 1" = 10'
-3
RECORD PRARN De-24-�