1. PREPARE SOIL BEFORE INSTALLING GEOTEXTILE FABRIC..
2.. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE GEOTEXTILE FABRIC IN A 6" WIDE TRENCH WITH APPROXIMATELY 12" OF
GEOTEXTILE FABRIC EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE GEOTEXTILE FABRIC WITH A ROW
OF STAPLES /STAKES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER
STAPLING. APPLY STONE TO PREPARED SOIL AND FOLD REMAINING 12" PORTION OF GEOTEXTILE FABRIC BACK OVER STONE.
SECURE GEOTEXTILE FABRIC OVER SOIL WITH A ROW OF STAPLES /STAKES SPACED APPROXIMATELY 12" ACROSS THE .WIDTH OF
THE GEOTEXTILE FABRIC.
3. ROLL THE GEOTEXTILE FABRIC DOWN ACROSS THE SLOPE. GEOTEXTILE FABRIC WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE
SOIL SURFACE. ALL GEOTEXTILE FABRIC MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES /STAKES IN
APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN DETAIL.
4. WHEN USING. THE STAPLE PATTERN DETAIL, STAPLES /STAKES SHOULD BE PLACED THROUGH EACH OF THE CIRCLES
CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
5. THE EDGES OF PARALLEL GEOTEXTILE FABRIC MUST BE STAPLED WITH APPROXIMATELY 2 " -5" OVERLAP DEPENDING ON
GEOTEXTILE FABRIC TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING GEOTEXTILE FABRIC
( GEOTEXTILE FABRIC BEING INSTALLED ON TOP) EVEN WITH THE SEAM STITCH ON THE PREVIOUSLY INSTALLED GEOTEXTILE FABRIC.
6. CONSECUTIVE GEOTEXTILE FABRIC SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN
APPROPRIATE 3" OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART ACROSS ENTIRE GEOTEXTILE FABRIC
WIDTH.
7. GEOTEXTILE FABRIC SHALL BE INSTALLED FOLLOWING MANUFACTURERS SPECIFICATIONS.
TYPICAL FABRIC /BLANKET /GEOGRID INSTALLATION DETAIL
NOT TO SCALE
SEED AT SURFACE UNDER 0' -6" MIN. BRUSH IN LAYER OF SEED MIX
EROSION FABRIC AND TOPSOIL INTO
EROSION CONTROL BLANKET
1" TOP SOIL 2:1 MAX
5" TOP SOIL IF
T
TIE EROSION FABRIC INTO 6" MIN
EXISTING SLOPE „ \, V 1
TOP SOIL AND SEED
SECTION
BANK SLOPES TO BE REINFORCED WITH
NORTH AMERICAN GREEN S150BN
HYDRO -SEED AT SURFACE SHORT -TERM EROSION CONTROL
ON TOP OF 0' -6" MIN. BLANKET OR APPROVED EQUAL
EROSION CONTROL
BLANKET (INSTALL FABRIC PER MANUFACTURERS
I SPECIFICATIONS USE STAPLE PATTERN)
L 2:1 MAX
2" HYDROSEED__g� Sat
T,pX
4" TOP SOIL
6" MIN
1
VEGETATIVE SUPPORT _/ % j/ j/ j/
LAYER UNDER EROSION
CONTROL BLANKET
HYRDO -SEED & TOP SOIL
SECTION
TYPICAL SLOPE SURFACE TREATMENT DETAIL
NOT TO SCALE
TYPICAL SLOPE SURFACE TREATMENT
(SEE DETAIL)
EROSION CONTROL BLANKET STAPLED AS SPECIFIED
AND STAKED WITH WOOD OR LIVE STAKES
INSTALL NATIVE WETLAND SHRUBS
(TYP.) EVENLY SPACED EVERY 4 –FEET
LIVE BRUSH CUTTINGS SANDWICHED 1.5
BETWEEN EROSION CONTROL BLANKET
INSTALL PLANT PLUGS (TYP.) I \
EVENLY SPACED EVERY 4 —FEET
EXTENDED —TERM EROSION
CONTROL BLANKET TOED UNDER r ¢Y
COMPACTED SOIL "
GEOGRID WRAPPED
AROUND EACH COMPOST
SOCK AND ANCHORED
8" DIA. PRE — SEEDED
COMPOST SOCK (TYP.) /
STREAM 7
DEPTH
12" THICK LOAM / VEGETATIVE
SUPPORT MATERIAL COVERED
BY SHORT —TERM EROSION
CONTROL BLANKET
EXTENDED —TERM
EROSION CONTROL
BLANKET STAPLED AS
SPECIFIED AND STAKED
WITH WOOD (EMBED INTO
EXISTING GROUND)
COMPACTED BACKFILL
INSTALLED 12" BELOW
FINAL GRADES
�r
4° THICK LOAM / VEGFTATIVF
SUPPORT MATERIAL FOR BRUSH
CUTTINGS SANDWICHED BETWEEN
EROSION CONTROL BLANKET LAYERS
12" THICK COMPACTED BACKFILL SANDWICHED
BETWEEN EROSION CONTROL BLANKET FOR
SLOPE BENCHES
FIRM COMPACTED /UNDISTURBED SUBGRADE
�F
GEOGRID TOED UNDER EACH
COMPOST SOCK, EXTENDED MIN. NOTE: LIVE WILLOW STAKES SHALL NOT BE USED
3 —FT AND STAPLED IN PLACE IN THE VICINITY OF THE EXISTING SEWER MAIN.
ExlsnNC STREAMBED COMPACTED SOIL LIFT BANK STABILIZATION DETAIL
NOT TO SCALE
PRE– SEEDED COMPOST SOCK
GEOGRID WRAPPED AROUND EACH
COMPOST SOCK AND ANCHORED
WITH STAPLES
PLANT PLUG EVENLY SPACED
EVERY 4 –FEET ALTERNATING
WITH ADJACENT COMPOST SOCK
PLUG PLACEMENT
ICAL PLANT PLUG INSTALLATION DETAIL
NOT TO SCALE
2 " -5"
2 " -5„
f
3 I SEAM
6' L
I I
I
1 STAPLE PER SQ. YD.
STAPLE PATTERN DETAIL
NOT TO SCALE
j PRIVATE HOMEOWNER WALKWAY.
(SEE CONCRETE WALKWAY DETAIL)
EXISTING TYPICAL SLOPE SURFACE TREATMENT
PRIVATE RESIDENCE 4" THICK LAYER (SEE DETAIL)
CRUSHED STONE
ANCHOR CONTINUOUS RUN OF
GEOGRID BENEATH COMPOST SOCK _ _ _ ELEV.
4 - . INSTALL PLANT PLUGS�TYP.]
EVENLY SPACED EVERY 4 -FEET
GABION BOX BASKETS FILLED WITH RIPRAP
4 1 AND PRE- SEEDED 8 -INCH COMPOST SOCKS
a �1 GEOGRID WRAPPED AROUND EACH COMPOST
SOCK AND ANCHORED BETWEEN GABIONS,
GEOGRID STAPLED AS SPECIFIED STAPLED IN PLACE
FILTER FABRIC 12 -INCH DIA. PRE- SEEDED COMPOST SOCK (TYP.)
DEPTH
ELE V. 208.00
EXISTING STREAMBED
FILL VOIDS BETWEEN COMPOST SOCKS AND FILTER
FABRIC / GEOGRID WITH VEGETATIVE SUPPORT MATERIAL
EMBED GABION BOX BASKET
3 -FT W x 1.5 -FT H (TYP.)
2 "X2°
WOODEN STAKE
IT MIN, COMPOST FILTER
SOCK PLACED ON THE —�
CONTOUR
COMPOST SOCK
CONTINUES
REPEAT
PLUGS
2,_3"
12"
COMPOST FILTER SOCK SECTION
STAKE ON Flow
10' LINEAL
SPACING Upslope
OVERLAP b
SECTIONS Downslope
1 COMPOST FILTER SOCK
"MIN. PLACED ON THE CONTOUR
PLAN VIEW
TYPICAL EROSION CONTROL DETAIL
NOT TO SCALE
GEOTEXTILE FILTER
FABRIC (ANCHORED)
FIRM SUBGRADE
BANK SLOPES TO BE REINFORCED WITH
NORTH AMERICAN GREEN C125BN
LONG-TERM EROSION CONTROL BLANKET OR
APPROVED EQUAL
NOTES
1) FINAL 5 -FEET OF UPSTREAM AND DOWNSTREAM
ENDS OF COMPOST SOCKS SHALL PLACED AT A
30' ANGLE TO PREVENT END - AROUND FLOW.
2) ALWAYS INSTALL COMPOST SOCKS
PERPENDICULAR TO SLOPE.
SEE TYPICAL SLOPE SURFACE
TREATMENT FOR TOP OF SLOPE
SIZE
(in)
APPROX.
PARTICLE
WEIGHT (Ibs)
% BY WEIGHT
PASSING
10*
FIRM COMPACTED /UNDISTURBED SUBGRADE
100
9-1/2*
80
NOTES:
7-1/2*
40
79 -84
3*
1) FINAL 1 -FOOT OF UPSTREAM AND DOWNSTREAM ENDS OF
50 -55
1/4 *
-
COMPOST SOCKS (NOT WITHIN GABIONS) SHALL BE BURIED
.079(# 10 Mesh)**
-
8 -10
INTO THE BANK TO ANCHOR THE EXPOSED ENDS.
-
Q Q
2) LONG -TERM EROSION CONTROL BLANKET SHALL BE
EI
'rSl s
(SPIREA BUMALDA)
INSTALLED OVER ALL DISTURBED AREAS UPSTREAM AND
o. 406D�;
r
DOWNSTREAM OF THE GABIONS. INSTALL PLANT PLUGS.
r ..
cf
SEDUM
SEDUM
3) PLACE FILTER FABRIC ALONG UPSTREAM AND DOWNSTREAM
18
ENDS OF GABIONS WHERE THEY WILL COME IN CONTACT WITH
FILTER FABRIC
SOIL
6° MIN. CRUSHED STONE SUBBASE (TYP.)
4) STAGGER ALTERNATING LAYERS /TIERS OF GABION BASKETS
gar+ee >a:e';y4
SO CONSECUTIVE SEAMS DO NOT LINE UP VERTICALLY.
GABION BANK STABILIZATION DETAIL
NOT TO SCALE
DEPTH
ELE V. 208.00
EXISTING STREAMBED
FILL VOIDS BETWEEN COMPOST SOCKS AND FILTER
FABRIC / GEOGRID WITH VEGETATIVE SUPPORT MATERIAL
EMBED GABION BOX BASKET
3 -FT W x 1.5 -FT H (TYP.)
2 "X2°
WOODEN STAKE
IT MIN, COMPOST FILTER
SOCK PLACED ON THE —�
CONTOUR
COMPOST SOCK
CONTINUES
REPEAT
PLUGS
2,_3"
12"
COMPOST FILTER SOCK SECTION
STAKE ON Flow
10' LINEAL
SPACING Upslope
OVERLAP b
SECTIONS Downslope
1 COMPOST FILTER SOCK
"MIN. PLACED ON THE CONTOUR
PLAN VIEW
TYPICAL EROSION CONTROL DETAIL
NOT TO SCALE
GEOTEXTILE FILTER
FABRIC (ANCHORED)
FIRM SUBGRADE
BANK SLOPES TO BE REINFORCED WITH
NORTH AMERICAN GREEN C125BN
LONG-TERM EROSION CONTROL BLANKET OR
APPROVED EQUAL
NOTES
1) FINAL 5 -FEET OF UPSTREAM AND DOWNSTREAM
ENDS OF COMPOST SOCKS SHALL PLACED AT A
30' ANGLE TO PREVENT END - AROUND FLOW.
2) ALWAYS INSTALL COMPOST SOCKS
PERPENDICULAR TO SLOPE.
SEE TYPICAL SLOPE SURFACE
TREATMENT FOR TOP OF SLOPE
SIZE
(in)
APPROX.
PARTICLE
WEIGHT (Ibs)
% BY WEIGHT
PASSING
10*
90 -95
100
9-1/2*
80
90 -95
7-1/2*
40
79 -84
3*
2 -3
50 -55
1/4 *
-
11 -16
.079(# 10 Mesh)**
-
8 -10
.033(# 20 Mesh) **
-
5 -8
* Equivalent spherical diameter
** Standard Sieve
NOTES:
A.) BANK ROCK SHALL BE SIZED AS SHOWN IN CULVERT CROSS - SECTION VIEWS.
B.) STONES SHALL BE ROUNDED BOULDERS AND COBBLES SIMILAR TO EXISTING STREAM BED MATERIAL.
C.) MATERIAL SHALL MEET THE ABOVE GRADATION, AND IS BASED ON D50= 2.5 INCHES (APPROX. 1.5 LBS.)
DESIGNED STREAMBED MATERIAL
PROPOSED HEADWALL
EXISTING DRIVEWAY
PROPOSED GUARDRAIL
�11
REINSTALL DRIVEWAY
EDGE OF PAVEMENT PAVERS
PROPOSED CULVERT
PROPOSED CATCH BASIN REVERE STREET
LANDSCAPE LEGEND
SYMBOL
PLANT NAME
SIZE
QUANTITY
SPACING
COMMENTS
NORTHERN BAYBERRY
(MYRICA PENSYLVANICA)
18 " -24"
3
6' OC
hia yc
Uhl t
Drawn By: SCS
I—\
_LUn m:
Checked By: MLL
L/j
L/!
SPIREA
_
12 ^1g^
8
3' OC
ALSO KNOWN AS:
EI
'rSl s
(SPIREA BUMALDA)
o. 406D�;
ANTHONY WATERER"
r ..
cf
SEDUM
SEDUM
6"
18
V OC
ALSO KNOWN AS: AUTUMN JOY-
PLANT IN GROUPS OF 3 PLANTS
�' r
(SEDUM TELPHINUM)
gar+ee >a:e';y4
PER AREA.
2 -FT OFFSET FROM ROADWAY.
INSTALL PLANT PLUGS
(S'MTCHGRASS - PANICUM VIRGATUM)
IN VEGETATIVE SUPPORT MATERIAL
BETWEEN COMPOST SOCKS AT 6 "INVERVALS
BRUSH IN LAYER OF SEED MIX AND
TOPSOIL INTO EROSION CONTROL. BLANKET
T- O 8" DIA PRE - SEEDED
COMPOST SOCK (TYR)
EXISTING STREAMBED
DEPTH
�— LONG -TERM EROSION CONTROL BLANKET
TOED UNDER COMPACTED SOIL
ANCHOR COMPOST SOCKS WITH 2"X2"
HARDWOOD STAKES AT 4-FGOT INTERVALS
TYPICAL COMPOST SOCK SLOPE STABILIZATION DETAIL
NOT TO SCALE
LANDSCAPE RESTORATION DETAIL
NOT TO SCALE
STAPLE EROSION CONTROL BLANKET
AT TOE OF SLOPE IN AREAS OF
COMPOST SOCKS TO BE WRAPPED WITH UNDISTURBED STREAMBANK
GEOGRID AND ANCHORED WITH STAPLES,
ANCHOR EROSION SEE BANK STABILIZATION DETAILS FOR ABUT COMPOST SOCKS TIGHTLY,
BACKFILL GAPS WITH VEGETATIVE
CROSS- SECTION VIEWS
CONTROL BLANKET
BENEATH COMPACTED SUPPORT MATERIAL
SOIL AT DISTURBED EXISTING STREAMBANK
STREAMBANKAREAS
I
Ir –O
INSTALL LONG -TERM EROSION BURY FINAL 1 -FOOT OF UPSTREAM AND PRE- SEEDED COMPOST SOCK
CONTROL BLANKET TO TOP OF DOWNSTREAM ENDS OF COMPOST SOCKS
DISTURBANCE. WITHIN BANK TO ANCHOR EXPOSED ENDS, 2" X 2" WOODEN STAKE
EXTEND MIN. 5 -FT FROM BURIED END ANGLE EMBEDDED COMPOST SOCK DOWN
INSTALL SECONDARY STAKE
IN FRONT OF COMPOST SOCK
BANK STABILIZATION - COMPOST SOCK
INSTALLATION TYPICAL DETAIL
NOT TO SCALE
NOTES
No.I Revision /Issue I Date
COMPREHENSIVE ENVIRONMENTAL
INCORPORATED
225 CEDAR HILL ST.
MARLBOROUGH, MA 01752
REVERE STREET
& MINUTEMAN BIIKEWAY
CULVERT REPLACEMENT
GENERAL DETAILS
Town of Lexington, MA
.4
No.: 228 -4
Sheet
,.�
' "OF'4 '3!
rDoTt.:FEE3RUARY 2015
S "
hia yc
Uhl t
Drawn By: SCS
I—\
_LUn m:
Checked By: MLL
L/j
L/!
�4
II i +
Scale: AS SHOWN
o. 406D�;
✓_ rc a
gar+ee >a:e';y4
.4