HomeMy WebLinkAbout2001-03-20-PBC-min.pdf TOWN OF LEXINGTON, MASSACHUSETTS PERMANENT BUILDING COMMITTEE Minutes of Tuesday March 20 2001 in Lexington High School construction trailer The meeting was called to order by Chairman Kelly at 10.001,n Attending Walter Pierce PBC Library Director Carol Mahoney Project Manager Bill Kealy Architect Stephen Hale Tom Arthur EDC Dan Platcow BBC Structural, Steven Berthelette, Steve Hassell, Gus Misail, Edrman Anthony Associates. Chairman Kelly discussed the need to have street worthy drawings before advertising the project. Two critical areas that were identified at the PBC meeting on March 15th • There is a gap in the mechanical drawings and the specs • Structural issues exist. Tom Arthur discussed his associate's, Mehul Dhruv work on the plans. Mehul is trying to look at the structural issues and how they are coordinated between all of the disciplines. A major concern of Tom Arthur is that the plans are complete so that the bid document will not require a large addendum Chairman Kelly asked the question as to whether or not the structural and architectural were coordinated on the plans yet? Dan Paltcow from Boston Builders appreciated Mehul's comments and stated that the only issue is coordinating the top of the grid line and the top of the foundation walls. An older building requires a lot of field coordination Dan felt that it was best to leave the dimensions off the drawings forces the General Contractor to coordinate structural/architectural drawings. There was a general discussion on whose responsibility is it? If you do not have the dimensions on the drawings you may open yourself up to liability Was a survey done of the building? The final decision was that the dimensions should be shown on either the structural or architectural drawings They must show up on one or the other Peer review of the structural drawings has begun and is 70-75% complete. Mechanical discussion — Erdman Anthony has brought in more engineers to complete the drawings The ductwork throughout the building has doubled The ductwork has a ripple effect with the location of soffits lighting and sprinklers. Air openings — the engineers discussed opening up the exterior foundation wall adjacent to the handicap ramp for air vents. The floor in the mechanical room will have to be depressed and the footings will have to be supported. Erdman Anthony will have the drawings completed Friday March 30th The schedule for the project is. Friday March 30`h - MEP ready Friday April 6th — Plans and specs. available for bidders. Tuesday April 17 — Pre-bid walkthrough. Monday April 30 — File sub-bids due at 11 OOAM Monday May 14 — GC bids due at 11.00AM.